One of the owners of North Norfolk’s Walsingham Estate placed the first stone in the wall of Scira’s operational base at a small ceremony to mark a key stage in the building’s construction. The laying of the stone by Elizabeth Meath Baker was carried out on Tuesday 19th June 2012 at the construction
Chinese Jiangsu Jiaolong Heavy Industry Group (JHI) has won a contract for construction of a wind turbine installation vessel for European offshore wind market. The company’s subsidiary JHI Engineering developed the DP-2 vessel after consulting several European wind farm operators, the Recharge news
While ports such as Hull, Bremerhaven or Esbjerg might be ready to grab the most important developments, there are potential rich pickings for many other ports which are unable to win the headline projects. As the Portstrategy news portal writes, Richard Marks, business development director at Royal
Safely transferring personnel from a vessel onto a turbine is a well known concern and challenge in offshore wind. E.ON has now successfully trialed the novel access system MaXccess, developed by the innovative UK based company OSBIT Power. The trials took place at the E.ON offshore wind farm Scroby
Scotland’s economic development agencies, Scottish Enterprise and Highlands and Islands Enterprise, have joined forces to launch a series of research and development funding calls to attract projects with potential to drive down the cost of offshore renewable energy. R&D funding has been made availa
OutSmart opens the first offshore wind Operations Centre for the German market in Emden at the end of this year. The operations centre will be manned 24/7 to operate offshore wind farms in the German North Sea and coordinate all maintenance and logistic activities. Launching customer is Trianel for
The UK Government’s investment in offshore wind industry gives a chance for marine sector companies to take advantage of the opportunities that the industry provides. Millions of pounds being invested in new offshore wind farms that need servicing and maintenance give the Hampshire-based marine sect
A team of RES engineers visited the Hornsea Round 3 meteorological mast for maintenance, This is Grimsby news portal reports. Chris Holden, offshore operations manager at RES said that the first visit to the mast is significant because it shows Grimsby’s capability of undertaking O&M activities and
On 14 May 2012, the Scientific Advisory Board of the Stiftung OFFSHORE-WINDENERGIE, represented by Joergen Thiele and Phd. Silke Eckardt, held a workshop on the need for further research during the operation of offshore wind farms (OWF). The workshop was held at the House of Science in Bremen. Aroun
London Array’s Operations & Maintenance (O&M) base at the Port of Ramsgate was officially opened by local MP Laura Sandys on Friday 9 March. The base will be home to around 70 wind farm technicians and up to 20 support staff, who’ll be responsible for operating and maintaining London Array for the n
While the future of new wind farm development hangs in the balance, there are still many more dollars to be made by focusing on smarter operations & maintenance (O&M) strategy for live projects in North America. This becomes even more essential as the volume of projects reaching end-of-warranty incr
Narec (National Renewable Energy Centre) has officially submitted an application to the Marine Management Organisation for permission to develop the Blyth Offshore Wind Demonstrator Centre, reported News Post Leader. Narec has placed the infrastructure for an offshore demonstration platform with gri
E.ON completes the Rampion meteorological mast after placing an elevation barge on the location, according to Shoreham Herald. The mast is set to monitor the wind speed, currents and other factors before building of the Rampion wind farm starts. It is placed 13 kilometers off coast between Shoreham
Narec’s (The National Renewable Energy Centre) new 100m Wind Turbine Blade Test Facility is nearing completion. The steel structure will be 28m high, 130m long and will be the largest of its kind, allowing it to test offshore wind turbine blades to a length of 100M. The building is due to be commiss