offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Operations & Maintenance

Loading filters...
AuthoritiesBusiness & FinanceR&DTechnologyGrid ConnectionWind Farm UpdateTraining & Education
Work starts on Blyth offshore wind test site (UK)
Operations & Maintenance

Work starts on Blyth offshore wind test site (UK)

Secretary of state for business, innovation and skills Vince Cable visited the National and Renewable Energy Centre (NaREC) in Blyth last… (newspostleader) [mappress] Source: newspostleader, August 16, 2010;

about 16 years ago
First Windfarm Installation Vessel ordered for Swire Blue Ocean A/S (Denmark)
Operations & Maintenance

First Windfarm Installation Vessel ordered for Swire Blue Ocean A/S (Denmark)

The Swire Blue Ocean vessel design is an advanced specification focusing on safety, efficiency and reliability. The vessel offers a significantly improved operating weather window, crane capability of 1200T, DP2 station keeping, a transit speed in excess of 13 knots, single cabin accommodation for 1

about 16 years ago
Europe connects 118 offshore wind turbines in first half 2010
Operations & Maintenance

Europe connects 118 offshore wind turbines in first half 2010

New offshore wind turbines total 333 MW, well over half the 577 MW installed offshore last year, continuing growth in offshore wind power… by KRemington (windpowerengineering) [mappress] Source: windpowerengineering, August 12, 2010;

about 16 years ago
Fixing offshore wind turbine grout problem might cost £25 million (UK)
Operations & Maintenance

Fixing offshore wind turbine grout problem might cost £25 million (UK)

Grout injected during the erection of offshore wind farms is breaking up, leading to concerns over their structural integrity, according to… By Brian Tinham (plantengineer) [mappress] Source: plantengineer, August 12, 2010;

about 16 years ago
Ausmarine 2010 Attracts Industry Leader
Operations & Maintenance

Ausmarine 2010 Attracts Industry Leader

Austal, the world’s largest aluminium shipbuilder, has confirmed its participation in the forthcoming Ausmarine 2010 exhibition, to be held in Perth between November 23 and 25.

about 16 years ago
RenewableUK 2010: The UK’s premier renewable energy event
Operations & Maintenance

RenewableUK 2010: The UK’s premier renewable energy event

Join 3,000+ people at RenewableUK’s 32nd annual 3-day conference and exhibition, 2-4 Nov 2010 in Glasgow, UK. The event features more than… (lowcarboneconomy) [mappress] Source: lowcarboneconomy, August 10, 2010;

about 16 years ago
Community leaders say Moray harbour would be well placed for work on offshore turbines (UK)
Operations & Maintenance

Community leaders say Moray harbour would be well placed for work on offshore turbines (UK)

Hopes are running high that windfarm projects could rejuvenate a Moray harbour. The harbour at Buckie would be “well placed” to maintain and… By Donna Macallister (pressandjournal) [mappress] Source: pressandjournal, August 06, 2010;

about 16 years ago
Balfour Beatty appointed preferred bidder for £163 million Offshore Transmission Network Owners (“OFTO”) asset (UK)
Operations & Maintenance

Balfour Beatty appointed preferred bidder for £163 million Offshore Transmission Network Owners (“OFTO”) asset (UK)

Balfour Beatty, the international infrastructure group, announces today that it has been appointed preferred bidder for the transmission assets of the Thanet offshore wind farm project, located off the most eastern part of Kent, as part of the Offshore Transmission Owners (“OFTO”) regulatory regime.

about 16 years ago
Pan-European Wind Energy Operations and Maintenance Forum, Berlin (Germany)
Operations & Maintenance

Pan-European Wind Energy Operations and Maintenance Forum, Berlin (Germany)

Major government commissions for both onshore and offshore projects across Europe have given a clear indication that the wind industry can… (lowcarboneconomy) [mappress] Source: lowcarboneconomy, August 04, 2010;

about 16 years ago
New facility in Boston to test large wind turbine blades (USA)
Operations & Maintenance

New facility in Boston to test large wind turbine blades (USA)

America’s first-of-its-kind wind blade testing facility — capable of testing a blade as long as a football field — almost never was.Because… (energyempowers) [mappress] Source: energyempowers, July 26, 2010;

about 16 years ago
A2Sea to acquire new turbine installation vessel (Denmark)
Operations & Maintenance

A2Sea to acquire new turbine installation vessel (Denmark)

Denmark-based offshore wind turbine installation specialist A2Sea has contracted Chinese company COSCO Shipyard Group for the construction… [mappress] Source: khl, July 20, 2010;

about 16 years ago
Proserv wins contract for Walney 1 offshore wind farm (UK)
Operations & Maintenance

Proserv wins contract for Walney 1 offshore wind farm (UK)

Proserv Offshore, a global provider of subsea maintenance, abandonment and decommissioning solutions and services to the offshore energy… [mappress] Source: marinelink, July 16, 2010;

about 16 years ago
RenewableUK publishes guidelines to working on heights on wind turbines (UK)
Operations & Maintenance

RenewableUK publishes guidelines to working on heights on wind turbines (UK)

The final draft of a revised training standard for working at height and rescue within both onshore and offshore wind turbines has been published by RenewableUK, after closing for consultation.

about 16 years ago
Dong Energy installs first of 102 new wind turbines in Walney offshore wind farm (UK)
Operations & Maintenance

Dong Energy installs first of 102 new wind turbines in Walney offshore wind farm (UK)

THE first of 102 new wind turbines which will change the view from Walney as they tower 450ft above the waves has been installed.A second… [mappress] Source: nwemail, July 15, 2010;

about 16 years ago
  • 1
  • …
  • 197
  • 198
  • 199
  • …
  • 202