offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Technology

Loading filters...
R&DWind Farm UpdateAuthoritiesGrid ConnectionBusiness & FinanceTraining & Education
Fugro’s Wave Buoy Measuring Site Conditions at Dudgeon OWF
Technology

Fugro’s Wave Buoy Measuring Site Conditions at Dudgeon OWF

As part of the Dudgeon offshore wind farm development, Fugro GEOS deployed a wave buoy in April on behalf of Statoil for a period of 12 months. The buoy will measure waves, currents and water level and will transmit the data to shore via satellite telemetry, according to KIS-ORCA’s website. The wave

about 12 years ago
EMEC’s Managing Director Wins ‘Outstanding Contribution’ Award
Technology

EMEC’s Managing Director Wins ‘Outstanding Contribution’ Award

The managing director of the world’s leading marine energy test facility has been recognised for his outstanding contribution to the renewable energy industry at the Scottish Green Energy Awards, held on December 6. Neil Kermode, managing director of the European Marine Energy Centre (EMEC) in Orkne

about 12 years ago
ESB Seeks Interest in Wave Energy Array Installation Off Ireland
Technology

ESB Seeks Interest in Wave Energy Array Installation Off Ireland

Electricity Supply Board (ESB), Ireland’s electricity utility, has invited Expressions of Interest in building a 5MW wave energy array at a potential location off the west coast of Ireland. The contract award relates to supply and installation of the wave energy array, including all ancillary requir

about 12 years ago
France Requests Information on Its Floating Wind Energy Potential
Technology

France Requests Information on Its Floating Wind Energy Potential

A request for information from floating wind turbine makers was published online by the ecology, sustainable development and energy minister at the beginning of December. The aim is to define the technical and economic conditions for the development of this sector. A pre-commercial deployment of a f

about 12 years ago
STL Research Gets Funding for Offshore Personnel Access System
Technology

STL Research Gets Funding for Offshore Personnel Access System

STL Research has announced that it has recently been awarded further funding by the UK’s innovation agency, the Technology Strategy Board (TSB) to accelerate their project to develop an offshore personnel access system. The system, called ‘Neptune’, will use a space-stabilised, articulated arm to sa

about 12 years ago
ABS Provides Cybersecurity Assessment for Offshore Energy Vessels
Technology

ABS Provides Cybersecurity Assessment for Offshore Energy Vessels

Increased Internet and remote connectivity to offshore assets has exposed industrial control systems to targeted attacks and vulnerabilities previously obscured. Remote monitoring, remote upgrades, Internet connections, and the complexity/criticality of the systems in general on highly valuable offs

about 12 years ago
ABS to Present Vattenfall with OW Design Basis Certification
Technology

ABS to Present Vattenfall with OW Design Basis Certification

ABS Group will present Vattenfall Wind Power Ltd with the Certified Design Basis Verification for the Kentish Flats Extension Offshore Wind Farm Project. The project, which has been successfully completed, will be located off the North Kent coast, adjacent to the existing Kentish Flats Wind Farm. Al

about 12 years ago
Vestas to Provide 15 Offshore Wind Turbines for Kentish Flats Extension
Technology

Vestas to Provide 15 Offshore Wind Turbines for Kentish Flats Extension

Vestas has received a firm and unconditional order for 15 V112-3.3 MW offshore turbines for the extension of the Kentish Flats wind farm off the coast of the UK. Vattenfall has contracted Vestas for the supply, installation and commissioning of the wind turbines as well as a 5-year service and maint

about 12 years ago
VIDEO: Laying the FORCE Subsea Data Cable
Technology

VIDEO: Laying the FORCE Subsea Data Cable

Fundy Ocean Research Center for Energy (FORCE) has installed a data cable designed to connect to a recoverable underwater research platform – the first subsea cable ever installed in the Minas Passage. The cable installation provides valuable knowledge and experience in planning the deployment of fo

about 12 years ago
Vroon’s VOS Satisfaction to Work on HelWin 2 UXO Survey
Technology

Vroon’s VOS Satisfaction to Work on HelWin 2 UXO Survey

Vroon Offshore Services BV has announced that VOS Satisfaction, a DP1/4PM subsea‑support vessel, is to work on TenneT’s HelWin 2 project. The vessel will be employed on the second phase of the marine Unexploded Ordnance (UXO) survey program . Read more about second phase of TenneT’s UXO survey HERE.

about 12 years ago
Construction of Perth Wave Energy Project Starts (Australia)
Technology

Construction of Perth Wave Energy Project Starts (Australia)

Carnegie Wave Energy Limited (CWE) has announced the commencement of offshore foundation installation activities. An offshore foundation installation vessel is on site off Garden Island, Australia, and the construction on the Perth Wave Energy Project has begun. Installation activities are now well

about 12 years ago
Global Demand for Turbines with Larger MW Ratings to Increase
Technology

Global Demand for Turbines with Larger MW Ratings to Increase

Wind turbines have grown larger, more productive, efficient, cost effective and reliable due to investments in technology and supply chain. The next 10 years will certainly bring further change, but the technology focus will shift, as the industry continues to mature and work towards LCOE grid parit

about 12 years ago
Australia: Perth Wave Energy Project Progresses Well
Technology

Australia: Perth Wave Energy Project Progresses Well

Carnegie Wave Energy Limited (CWE) provided an update on the progress of key components for the Perth Wave Energy Project. All components are on track for delivery in either first or second quarter 2014 with Project commissioning on track for Quarter 2, 2014. For example, the CETO Unit Buoyant Actua

about 12 years ago
TU Delft`s Researcher Develops Method for Offshore Wind Cost Reduction
Technology

TU Delft`s Researcher Develops Method for Offshore Wind Cost Reduction

The costs of generating electricity through wind farms at sea still need to be lower. Researcher Michiel Zaayer of TU Delft (Delft University of Technology) has developed a program that can help. On Monday December 16, he defended his doctoral dissertation on this topic at TU Delft. Costs need to

about 12 years ago
  • 1
  • …
  • 273
  • 274
  • 275
  • …
  • 350