offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Technology

Loading filters...
R&DBusiness & Finance
Van Oord to Build 100-Metre High Meteorological Mast in North Sea
Technology

Van Oord to Build 100-Metre High Meteorological Mast in North Sea

Van Oord has received an assignment from RWE to build a 100-metre high mast in the North Sea to measure maritime meteorological influences. The meteorological mast will be built 75 kilometres from the coast in the ‘IJmuiden’ offshore wind region, which is part of the National Water Plan. The mast wi

about 15 years ago
Osiris Projects Selects C-Nav 3050 for its Bibby Tethra (UK)
Technology

Osiris Projects Selects C-Nav 3050 for its Bibby Tethra (UK)

C-Nav, the premier supplier of international GNSS Precise Point Positioning services, will provide the GNSS positioning system for Osiris… (cnavgnss) [mappress] Source: cnavgnss, February 22, 2011

about 15 years ago
Liebherr Develops Offshore Heavy Lift Crane for Beluga Hochtief Offshore (Germany)
Technology

Liebherr Develops Offshore Heavy Lift Crane for Beluga Hochtief Offshore (Germany)

The heavy lift offshore crane, type CAL 64000 – 1500 Litronic®, specially developed by Liebherr for the company BELUGA HOCHTIEF Offshore,… (heavyliftpfi) [mappress] Source: heavyliftpfi, February 21, 2011

about 15 years ago
Fred. Olsen Windcarrier Signs Contract With Båtservice Mandal AS for Four New Crew Boats (Norway)
Technology

Fred. Olsen Windcarrier Signs Contract With Båtservice Mandal AS for Four New Crew Boats (Norway)

Fred. Olsen Windcarrier has today signed a contract with Båtservice Mandal AS (Norway) for the construction of four new crew boats. The vessels are custom designed to transport service technicians to and from offshore wind turbines. The catamaran hull has special features to limit the vessel motions

about 15 years ago
Sinovel to Announce the Completion of China’s First 6 MW Turbine in June
Technology

Sinovel to Announce the Completion of China’s First 6 MW Turbine in June

Sinovel Wind Group Co., China’s largest wind power generator manufacturer, announced Monday it will finish production of the country’s first… (english.peopledaily) [mappress] Source: english.peopledaily , February 14, 2011

about 15 years ago
Seajacks Zaratan Construction Summary (UK)
Technology

Seajacks Zaratan Construction Summary (UK)

In February 2010 Seajacks entered into a contract with GustoMSC to provide the Basic Design Package for two purpose built wind farm installation vessels. In June 2010 Seajacks entered into a contract with Lamprell shipyard to build these new vessels and Seajacks will take delivery of the first new-b

about 15 years ago
New Crewboats for Fred Olsen (Norway)
Technology

New Crewboats for Fred Olsen (Norway)

Fred. Olsen Windcarrier AS, Oslo, Norway, recently entered into a contract with Norwegian shipyard Båtservice Mandal AS for the construction… (marinelog) [mappress] Source: marinelog , February 14, 2011

about 15 years ago
Alstom and LM Wind Power Join Together to Develop Offshore Wind Turbines (Denmark)
Technology

Alstom and LM Wind Power Join Together to Develop Offshore Wind Turbines (Denmark)

Alstom and LM Wind Power this week announced plans to jointly develop the world’s longest wind turbine blades for offshore wind turbines. (energyonline) [mappress] Source: energyonline, February 11, 2011

about 15 years ago
Atlantis Tidal Turbine to be Built in Province (USA)
Technology

Atlantis Tidal Turbine to be Built in Province (USA)

Nova Scotia’s bid to become a North American leader in the development, supply and support of tidal energy projects took another step forward today with the announcement that an international consortium will test one of the world’s largest tidal turbines in the Bay of Fundy’s aggressive marine envir

about 15 years ago
US Fish & Wildlife Service Orders MERLIN Avian Radar Systems
Technology

US Fish & Wildlife Service Orders MERLIN Avian Radar Systems

DeTect, Inc. has announced that it has received an order from the U.S Fish and Wildlife Service (USFWS) for two MERLIN Avian Radar Systems. The bird radar systems will be delivered to the USFWS Great Lakes – Big Rivers Region 3 in March 2011 and will be primarily used by the service to assess and [&

about 15 years ago
LM Wind Power to Develop the World’s Longest Wind Turbine Blades for Offshore Wind Turbines (Denmark)
Technology

LM Wind Power to Develop the World’s Longest Wind Turbine Blades for Offshore Wind Turbines (Denmark)

Record blade pushes the limits to bring down the Cost of Energy of offshore wind. LM Wind Power and Alstom have entered a strategic partnership to develop the longest wind turbine blade ever produced, designed to fit Alstom’s new 6 MW wind turbine for the growing European offshore wind market. This

about 15 years ago
Gaoh Offshore Announces Signing of Letter of Intent With STX Offshore & Shipbuilding Covering Wind Turbine Installation Vessel Development (UK)
Technology

Gaoh Offshore Announces Signing of Letter of Intent With STX Offshore & Shipbuilding Covering Wind Turbine Installation Vessel Development (UK)

UK Wind Energy Services company, Gaoh Offshore announced the signing of a Letter of Intent covering the design development and construction… (tos) [mappress] Source: tos, February 08, 2011

about 15 years ago
Lloyd Werft Close to Sealing Cable-Laying Vessel Order From Bremen’s Beluga Shipping (Germany)
Technology

Lloyd Werft Close to Sealing Cable-Laying Vessel Order From Bremen’s Beluga Shipping (Germany)

IHS Fairplay reports that Lloyd Werft is reportedly close to sealing an order for a cable-laying vessel from Bremen’s Beluga Shipping. The vessel, with a length of 110m and breadth of 28m, is to be delivered in mid-2012 for deployment on a North Sea offshore windfarm, the German daily newspaper NWZ

about 15 years ago
Seajacks Zaratan Construction Summary (UK)
Technology

Seajacks Zaratan Construction Summary (UK)

In February 2010 Seajacks entered into a contract with GustoMSC to provide the Basic Design Package for two purpose built wind farm installation vessels. In June 2010 Seajacks entered into a contract with Lamprell shipyard to build these new vessels and Seajacks will take delivery of the first new-b

about 15 years ago
  • 1
  • …
  • 334
  • 335
  • 336
  • …
  • 350