offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Vessels

Loading filters...
Business & FinanceContracts & TendersOperations & MaintenanceR&DTechnologyWind Farm UpdateGrid ConnectionPorts & Logistics
Keel-laid-for-Van-Oords-new-cable-layer
Vessels

Van Oord’s Next-Generation Fleet Starts Taking Shape

Van Oord has laid the keel for its new 130-metre hybrid cable-laying vessel, Calypso. The Dutch company held a ceremony at the Vard Tulcea shipyard in Romania to mark the milestone. Van Oord placed an order with VARD for Calypso in December last year as part of the company’s strategy to strengthen i

about 4 years ago
Dogger Bank Wind Farm Orders Fourth Service Operations Vessel at North Star
Vessels

Dogger Bank Wind Farm Orders Fourth Service Operations Vessel at North Star

North Star Group has secured the service operations vessel (SOV) contract to support the third phase of the 3.6 GW Dogger Bank Wind Farm off the coast of Yorkshire, UK. The UK firm has secured a long-term charter worth approximately GBP 90 million (around EUR 105 million) to deliver an additional sh

about 4 years ago
Power Transfer Vessel
Vessels

Automated Ships Transporting Offshore Wind Electricity Attract Major Shipbuilder

Major Japanese shipbuilding, marine engineering, and service company, Imabari Shipbuilding, has entered into a capital and business alliance with the compatriot startup, PowerX, to jointly develop a prototype automated Power Transfer Vessel. The Power Transfer Vessel, Power ARK 100, is a 100 TEU tri

about 4 years ago
A crew transfer vessel at an offshore wind farm
Vessels

French Consortium Shows ZEST for Zero-Emission, Safe Transfer Crew Transfer Vessels

Five France-based companies have formed the ZEST industrial consortium to produce zero-emission & safe transfer crew transfer vessels. (CTVs). Louis Dreyfus Armateurs, Mauric, Barillec Marine, SEAir, and ADV Propulse have been working for three months on the development of a prototype CTV which is s

about 4 years ago
Eneti's wind turbine installation vessel, or WTIV
Vessels

Wärtsilä Thrusters for Eneti’s Next-Gen Wind Turbine Installation Vessel

Wärtsilä will supply seven thrusters for the wind turbine installation vessel (WTIV) currently being built at the Daewoo Shipbuilding and Marine Engineering (DSME) yard in South Korea for Eneti. The six WST-32 thrusters and one WTT-36 thruster are scheduled for delivery during the first quarter of 2

about 4 years ago
Jan De Nul to Install Turbines at Vesterhav Offshore Wind Farms
Vessels

Jan De Nul to Install Turbines at Vesterhav Offshore Wind Farms

Vattenfall has selected Jan De Nul Group to transport and install the wind turbines at the Vesterhav Nord and Vesterhav Syd offshore wind farms in the Danish North Sea. Under the contract, Jan De Nul will transport and install 41 Siemens Gamesa 8.4 MW turbines at the two wind farms. Jan De Nul’s jac

about 4 years ago
Rendering of AOS Wind Farm Crew Transfer Vessel
Vessels

Volvo Penta Propulsion Systems for New Hybrid-Ready US Crew Transfer Vessels

Volvo Penta has signed a contract to provide its quad IPS propulsion systems for the four new offshore wind farm crew transfer vessels (CTVs) that Rhode Island-based Blount Boats will build to ABS Class for American Offshore Services (A-O-S), a newly established company between Sweden’s Northern Off

about 4 years ago
Eneti Orders Second 20 MW Wind Turbine Installation Vessel
Vessels

Eneti Orders Second 20 MW Wind Turbine Installation Vessel

Eneti Inc. has entered into a binding agreement for the construction of the second next-generation wind turbine installation vessel with South Korea’s Daewoo Shipbuilding and Marine Engineering (DSME). Eneti has exercised an option it held with DSME for the construction of the WTIV. The contract pri

about 4 years ago
Deepest Fixed Bottom Offshore Wind Farm Ready for First Turbines
Vessels

Deepest Fixed Bottom Offshore Wind Farm Ready for First Turbines

Cadeler’s jack up Wind Osprey has arrived at Able Seaton Port in Hartlepool to load the first batch of Vestas V164-10.0 MW turbines to be installed at the 1.1 GW Seagreen wind farm offshore Scotland. Wind Osprey is expected to arrive at the installation site some 27 kilometres off the Angus coast wi

about 4 years ago
Cadeler Picks Huisman Cranes for X-Class Offshore Wind Installation Vessels
Vessels

Cadeler Picks Huisman Cranes for X-Class Offshore Wind Installation Vessels

Cadeler A/S has signed a contract with Huisman to design and construct two >2,000 t Leg Encircling Cranes (LEC) for the two Cadeler X-class vessels scheduled to be ready by the end of 2024 and the beginning of 2025, respectively. The identical Leg Encircling Cranes have a 155-metre long boom, capabl

about 4 years ago
Siemens Vessels Undergoing Another Conversion, Already Too Small for Next Generation Wind Turbine Parts
Vessels

Siemens Vessels Undergoing Another Conversion, Already Too Small for Next Generation Wind Turbine Parts

Not even five years after their conversion from containerships to roll on/roll off (Ro-Ro) vessels customized to transport wind turbine components, Siemens’s Rotra Mare and Rotra Vente will undergo modifications in response to the increasing size of wind turbine components. The 141.6-metre Rotra Ven

about 4 years ago
Jan De Nul Adds DHSS to Hollandse Kust Team
Vessels

Jan De Nul Adds DHSS to Hollandse Kust Team

Jan De Nul has awarded the ships agency contract to DHSS covering the installation of high voltage cables for TenneT’s Hollandse Kust (Noord) and (West Alpha) grid connection projects offshore the Netherlands. DHSS will assist Jan de Nul on this project from its support base in Port of IJmuiden and

about 4 years ago
Van Oord Joins Seaway 7 on Seagreen Offshore Wind Project
Vessels

Van Oord Joins Seaway 7 on Seagreen Offshore Wind Project

Seaway 7, the main Seagreen contractor, has contracted Van Oord to install scour protection around the 114 wind turbine foundations at the Seagreen wind farm offshore Scotland. The wind turbines for this 1.1 GW offshore wind farm located 27 kilometres off the coast of Angus will be installed on thre

about 4 years ago
Seaway Ventus Steel Cutting
Vessels

Seaway 7 Cuts Steel for Next-Generation Wind Turbine Installation Vessel

The first steel has been cut for Seaway 7’s next-generation wind turbine installation vessel (WTIV) at the China Merchants Heavy Industry (CMHI) facility in Jiangsu, China. The ceremony marks the first major milestone in bringing its GustoMSC NG-14000XL-G jack-up vessel to the market, Seaway 7 said.

about 4 years ago
  • 1
  • …
  • 78
  • 79
  • 80
  • …
  • 261