offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Vessels

Loading filters...
Wind Farm UpdateContracts & TendersBusiness & FinancePorts & Logistics
Aeolus Leaves France Following Drilling Equipment Malfunction
Vessels

Aeolus Leaves France Following Drilling Equipment Malfunction

Van Oord’s jack-up Aeolus has left the bay of Saint-Brieuc and is en-route to her home port in Vlissingen, the Netherlands after the installation of foundations at the Saint-Brieuc offshore wind farm was halted due to a leak of hydraulic fluid in the drilling equipment. Van Oord is in charge of tran

about 5 years ago
An artist impression of Atlas A-clas vessel installing offshore wind turbines
Vessels

Knud E. Hansen Unveils New WTIV Class for 14 MW Turbines

Knud E. Hnsen has presented a new wind turbine installation vessel (WTIV) design in its Atlas series, which can carry four 14 MW wind turbines. The Atlas A-class WTIV is specifically dimensioned for transporting and assembling wind turbines on top of pre-installed foundations. The foundations, which

about 5 years ago
Hornsea Two SOV Leaves Turkey
Vessels

Hornsea Two Newbuild SOV Leaves Turkey

Turkey’s Cemre Shipyard has bid farewell to the service operations vessel (SOV) Wind of Hope. Ordered by Louis Dreyfus Armateurs (LDA), Wind of Hope’s first assignment will be on Ørsted’s 1.4 GW Hornsea Two off the UK, which will be the world’s largest wind farm once completed. The vessel will opera

about 5 years ago
An aerial photo of the Wind Osprey vessel in port
Vessels

Cadeler to Upgrade Crane Gear on One More Vessel

Following the replacement of the main crane on its jack-up vessel Wind Orca, Cadeler has decided to do the same on Wind Osprey, which is currently installing wind turbines on the Triton Knoll offshore wind farm in the UK. The company contracted NOV to upgrade Wind Orca with a new and improved crane

about 5 years ago
A photo of the Aeolus vessel
Vessels

Foundation Installation at French Offshore Wind Farm Grinds to a Halt

Van Oord’s installation vessel Aeolus has stopped installing the foundation pin piles at the Saint-Brieuc offshore wind farm after experiencing technical issues with the drilling equipment. Van Oord is responsible for the transport and installation of 62 jacket foundations for the wind turbines, thr

about 5 years ago
Turbine Installation at Moray East Enters Final Quarter
Vessels

Moray East Counts to 50

Fred. Olsen Windcarrier’s jack-up Blue Tern installed the 50th Vestas V164-9.5MW wind turbine at the Moray East offshore wind farm, marking the halfway milestone. The 50th turbine was installed at 22.40 local time on Thursday, 10 June. Last work on the turbine was completed at 05.14 on Friday, 11 Ju

about 5 years ago
Kongsberg Design for Awind Construction Service Operation Vessels
Vessels

Kongsberg Design for Awind Construction Service Operation Vessels

Kongsberg Maritime has won contracts to design and equip two construction service operation vessels (CSOV/SOV) for the Norway-based shipowner Awind AS. The combined contract value is approximately NOK 250 million (around EUR 25 million). Destined for the offshore wind market, the new CSOVs will be b

about 5 years ago
Green Shipping Line and DEKC to Design Jones Act Offshore Wind Vessels
Vessels

Green Shipping Line and DEKC to Design Jones Act Offshore Wind Vessels

The US-based Green Shipping Line (GSL) has signed a Teaming Agreement with the Dutch marine vessel engineer DEKC Maritime to pursue Jones Act-compliant offshore wind vessel solutions in the United States. This announcement follows a string of deals by GSL, including an agreement with Keystone Shippi

about 5 years ago
A photo of Louis Dreyfus Armateurs' survey vessel Wind of Pride at sea
Vessels

Surveys Underway at Dogger Bank Wind Farm Cable Locations

The Fugro Synergy survey vessel is currently conducting a geotechnical survey in the Dogger Bank C array area and export cable route, while the vessel Wind of Pride is performing inspection works in the Dogger Bank A array area and the export cable routes for Dogger Bank A & B. According to the late

about 5 years ago
An image showing Farra Orla design
Vessels

First Irish Wind Farm Service Catamaran Delivered to Its Owner

Farra Marine has taken delivery of Farra Orla, the first catamaran wind farm service vessel to sail under the Irish flag, from Penguin Shipyard. The Singapore-based shipyard started building the 27-metre vessel for the Irish vessel operator in September 2020. Farra Orla, designed by Incat Crowther,

about 5 years ago
CLV-Leonardo-da-Vinci-sets-sail
Vessels

CLV Leonardo da Vinci Sets Sail

Prysmian’s new cable laying vessel (CLV) Leonardo da Vinci has completed its first trip to open sea and is ready to begin sea trials. After completing the last outfitting phases, Leonardo da Vinci will undergo sea trials for approximately two weeks and will run three turns of tests. After draught re

about 5 years ago
A photo of WEM Marine's 27-metre crew transfer vessels at sea
Vessels

Two New CTVs Join WEM Marine’s Fleet

Strategic Marine, a shipbuilding company based in Singapore, has delivered two 27-metre crew transfer vessels (CTVs) to the UK-based offshore support vessel provider WEM Marine. The CTVs, powered by two Caterpillar C32 engines driving fixed pitch propellers, can accommodate 24 technicians and three

about 5 years ago
DEME Jack-Ups Team Up on World's Largest Offshore Wind Farm
Vessels

DEME Jack-Ups Team Up on World’s Largest Offshore Wind Farm

DEME Offshore’s jack-up Sea Installer has arrived at the Port of Hull in the UK to load the first set of turbine components to be installed on the 1,386 MW Hornsea Two offshore wind farm. Sea Installer is joining her sister vessel Sea Challenger on the project which has already installed the first b

about 5 years ago
A photo of DEME's Groene Wind service operations vessel at sea
Vessels

DEME Takes Delivery of Its First-Ever SOV

Cemre Shipyard has delivered Groenewind, DEME’s first-ever service operations vessel (SOV), to its owner. “DEME’s first dedicated and world’s first SWATH type service operation vessel Groenewind that will serve 3 different windfarm sites is delivered to her client”, the Turkish shipbuilder said via

about 5 years ago
  • 1
  • …
  • 88
  • 89
  • 90
  • …
  • 261