offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Wind Farm Update

Loading filters...
Business & FinanceContracts & TendersGrid ConnectionVesselsAuthoritiesBusiness developmentR&DResearch & DevelopmentTechnologyPorts & Logistics
A photo of the Borssele 1 & 2 with several wind turbines close up
Wind Farm Update

ESB and Ørsted Enter 5 GW Offshore Wind, Green Hydrogen Partnership in Ireland; Reveal Plan to Bid in Next Irish Auction

ESB and Ørsted have signed an agreement to jointly develop a portfolio of up to 5 GW of offshore wind and complementary green hydrogen projects in Ireland, with the first of these offshore wind projects expected to compete in the next Irish auction, ORESS 2.1. The agreement also marks Ørsted’s entry

about 3 years ago
Ørsted Becomes Sole Owner of 1.1 GW Ocean Wind 1 Offshore Wind Project
Wind Farm Update

Ørsted Becomes Sole Owner of 1.1 GW Ocean Wind 1 Offshore Wind Project

Public Service Enterprise Group Inc. (PSEG) has completed the sale of its 25 per cent equity interest in 1.1 GW Ocean Wind 1 offshore wind project to Ørsted North America. With this executed agreement, Ørsted North America has reimbursed PSEG for all of its cumulative outlays in the Ocean Wind 1 pro

about 3 years ago
Dogger Bank A substation topside
Wind Farm Update

DEME Awards Dogger Bank A Cable Termination & Testing Contract

Correll Group, Cable Installation & Power Services Division has been contracted by DEME Offshore to complete the inter-array cable termination & testing on wind turbines and the offshore substation platform on the first phase of the Dogger Bank offshore wind farm in the UK. The 3.6 GW Dogger Bank Wi

about 3 years ago
Seagreen wind turbines
Wind Farm Update

100th Turbine Stands at Scotland’s Largest Offshore Wind Farm

100 out of 114 Vestas V164-10 MW wind turbines have been installed at what will be Scotland’s largest offshore wind farm – Seagreen – off the coast of Angus. According to AIS, Cadeler’s wind farm installation vessel Wind Orca is at the offshore construction site 27 kilometres from the coast of Angus

about 3 years ago
Thialf Deployed for Jacket Installation at Neart na Gaoithe as Foundation Work Resumes
Wind Farm Update

Thialf Deployed for Jacket Installation at Neart na Gaoithe as Foundation Work Resumes

The installation of wind turbine jacket foundations at the Neart na Gaoithe (NnG) offshore wind farm will resume over the coming few days with the vessel Thialf set to carry out the work. Twelve foundations were installed at the Scottish project’s site last year, two of which are supporting the wind

about 3 years ago
HKN TenneT take over
Wind Farm Update

TenneT Takes Control of Hollandse Kust Noord Platform

The Hollandse Kust Noord platform has been taken over by the Dutch transmission system operator (TSO) TenneT. After a successful project engineering, procurement, construction, installation, and offshore hook-up, the Hollandse Kust Noord platform take-over is now official by signing off the Taking-O

about 3 years ago
A photo of the WindFloat Atlantic floating wind farm n Portugal
Wind Farm Update

Ocean Winds Applies for Floating Wind Concession in Italy

Ocean Winds, a joint venture between EDP Renewables and Engie, has filed an application for a concession with the Italian authorities for a site located some 50 kilometres off the Sicilian coast, where the developer wants to build a floating wind farm. This is an excerpt from a Premium article publi

about 3 years ago
Baltic Eagle subsea cable pull in
Wind Farm Update

50Hertz Completes Baltic Eagle Cable Pull-In

50Hertz has completed the pull-in of two 220 kV subsea cable systems into Iberdrola’s Baltic Eagle platform. The two 220 kV subsea cable systems were previously laid on the seabed in a safe area next to the destination of the substation platform. In February of this year, the substation platform was

about 3 years ago
Petra L. cargo ship damage after Gode Wind 1 turbine collision
Wind Farm Update

Cargo Ship-Hit Gode Wind 1 Turbine Went Back Into Service in 24 Hours; Vessel Said to Have Been Kilometres Off Course

The turbine at the Gode Wind 1 offshore wind farm in Germany that was hit by a cargo vessel last month was put back into service around 24 hours after being taken out of operation for inspection, Ørsted tells offshoreWIND.biz. According to reports by German media, the vessel, which sustained major d

about 3 years ago
NKT Secures Cable Agreement for Major Wind Farms Offshore Sweden
Wind Farm Update

NKT Secures Cable Agreement for Major Wind Farms Offshore Sweden

OX2 and Ingka Investments have entered into a conditional agreement with NKT for the delivery and installation of export power cables for two wind farm projects offshore Sweden. Under the agreement, NKT’s facility in Karlskrona, Sweden, will deliver the cables for the recently awarded Galene project

about 3 years ago
Japanese Companies Join Hands for Floating Axis Offshore Wind Demonstration Project
Wind Farm Update

Japanese Companies Join Hands for Floating Axis Offshore Wind Demonstration Project

J-POWER, Tokyo Electric Power Company Holdings (TEPCO), Chubu Electric Power, Kawasaki Kisen Kaisha (“K” Line), and Albatross Technology (Albatross) have entered into a joint research agreement for a next-generation floating axis wind demonstration project offshore Japan. With limited shallow sea ar

about 3 years ago
Fagioli Calvados marshalling yard services
Wind Farm Update

Saipem Adds Fagioli to Calvados Team

Fagioli S.p.A. has been contracted by Saipem to provide marshalling yard services for the 480 MW Calvados offshore wind farm in France. Fagioli is providing Saipem with a marshalling yard of more than 120,000 square metres of quay and storage area. The operations include heavy lifting, relocation, h

about 3 years ago
Vineyard Wind Offshore Substation Leaves Denmark, Sails to America
Wind Farm Update

Vineyard Wind Offshore Substation Leaves Denmark, Sails to America

The offshore substation topside and the jacket foundation for the Vineyard Wind 1 project have left the quay at Bladt Industries’ production site in Southern Denmark heading for its destination 35 miles from mainland Massachusetts, USA. The sail-away is on time according to the original schedule and

about 3 years ago
Vineyard Wind Receives First Shipment of Turbine Components
Wind Farm Update

Vineyard Wind Receives First Shipment of Turbine Components

Vineyard Wind, a joint venture between Copenhagen Infrastructure Partners (CIP) and AVANGRID, has received the first shipment of turbine components for GE’s Haliade-X 13 MW turbine at the New Bedford Marine Commerce Terminal in Massachusetts, USA. The tower sections will be constructed at the termin

about 3 years ago
  • 1
  • …
  • 103
  • 104
  • 105
  • …
  • 640