offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Wind Farm Update

Loading filters...
Operations & MaintenanceVesselsPorts & LogisticsR&DBusiness & FinanceContracts & TendersTechnologyGrid ConnectionAuthoritiesEnvironment
MHI Vestas SOV Leaves Cemre Shipyard
Wind Farm Update

MHI Vestas SOV Leaves Cemre Shipyard

Turkey’s Cemre Shipyard has delivered a service operation vessel (SOV) built for Esvagt and chartered by MHI Vestas Offshore Wind.

about 8 years ago
Sif Goes Full Steam Ahead with Norther Foundations
Wind Farm Update

Sif Goes Full Steam Ahead with Norther Foundations

Sif has started the production of monopile foundations and has produced half of the primary steel for the transition pieces (TPs) to be installed on the 370MW Norther offshore wind farm located in the Belgian North Sea.

about 8 years ago
Ampelmann and Eidesvik Team Up on Wikinger
Wind Farm Update

Ampelmann and Eidesvik Team Up on Wikinger

Ampelmann has been awarded a contract by Eidesvik to deliver an Ampelmann E-type for the Viking Neptun, currently serving as an accommodation and a crew transfer vessel (CTV) on the Wikinger offshore wind farm.

about 8 years ago
Kriegers Flak Offshore Substation Topsides Start Rolling Out
Wind Farm Update

Kriegers Flak Offshore Substation Topsides Start Rolling Out

Hollandia Offshore and Croonwolter&dros have moved the Kriegers Flak B (KFB) offshore substation topside from Hollandia Offshore’s production hall in Krimpen aan den IJssel and into the yard.

about 8 years ago
Dudgeon Offshore Wind Farm Opens for Business
Wind Farm Update

Dudgeon Offshore Wind Farm Opens for Business

Statoil, Masdar and Statkraft officially opened the 402MW Dudgeon offshore wind farm in Great Yarmouth, UK, on Wednesday, 22 November.

about 8 years ago
Dudgeon OWF Set for Inauguration
Wind Farm Update

Dudgeon OWF Set for Inauguration

Statoil, Masdar and Statkraft are ready to officially open their Dudgeon offshore wind farm in the UK tomorrow, 22 November.

about 8 years ago
Parkwind Looks For Northwester 2 Offshore Substation Team
Wind Farm Update

Parkwind Looks For Northwester 2 Offshore Substation Team

Parkwind has issued a tender seeking companies to design, build, install and commission the offshore high voltage substation (OHVS) for its Northwester 2 wind farm in the Belgian North Sea.

about 8 years ago
TenneT Seeks Horizontal Directional Drilling Contractor for Hollandse Kust Zuid Connection
Wind Farm Update

TenneT Seeks Horizontal Directional Drilling Contractor for Hollandse Kust Zuid Connection

TenneT is looking for a contractor who will carry out horizontal directional drilling (HDD) works for the connection of the Hollandse Kust Zuid wind farm area.

about 8 years ago
Ørsted Tweaks Hornsea Three Cable Route
Wind Farm Update

Ørsted Tweaks Hornsea Three Cable Route

Ørsted has invited comments on the proposed modifications to the onshore and offshore export cable corridor for the Hornsea Project Three wind farm located some 120 kilometres off the north Norfolk coast, UK.

about 8 years ago
Mussel Farming Begins at Belwind OWF
Wind Farm Update

Mussel Farming Begins at Belwind OWF

On 15 November, a bio mussel force line was installed at the Belwind offshore wind farm as part of a research project investigating mussel farming at offshore wind farms.

about 8 years ago
Huadian Heavy Joins Laothing Bodhi Offshore Wind Project
Wind Farm Update

Huadian Heavy Joins Laothing Bodhi Offshore Wind Project

Beijing-based Huadian Heavy Industries has signed a contract with Hebei Construction & Investment Offshore Wind Power for the construction of the 300MW Laoting Body Island offshore wind farm in Tangshan, China.

about 8 years ago
Otary In the Market For Offshore Substations
Wind Farm Update

Otary In the Market For Offshore Substations

Belgian offshore wind developer Otary has issued a tender for engineering, procurement, construction, and installation (EPCI) of high voltage substations on the Seastar and the Mermaid offshore wind farms.

about 8 years ago
South Korea’s First Commercial Offshore Wind Farm Goes Live
Wind Farm Update

South Korea’s First Commercial Offshore Wind Farm Goes Live

South Korean Tamra offshore wind farm was officially opened today (17 November) at a ceremony attended by South Korea’s Minister of Trade, Industry and Energy, Paik Ungyu, and the officials from Korea South-East Power, the wind farm’s developer.

about 8 years ago
EPCI Contractor Wanted for Seastar and Mermaid Offshore Connections
Wind Farm Update

EPCI Contractor Wanted for Seastar and Mermaid Offshore Connections

Otary, the developer of Seastar and Mermaid offshore wind farms to be built off the coast of Belgium, is looking for EPCI contractor(s) for 225 kV XLPE submarine high voltage cables and connections between the wind farms’ substations and the Belgian modular offshore grid.

about 8 years ago
  • 1
  • …
  • 413
  • 414
  • 415
  • …
  • 640