offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Wind Farm Update

Loading filters...
Business & FinanceOperations & MaintenanceVesselsContracts & TendersGrid ConnectionAuthorities
DONG Makes Room in Norddeich for Borkum Riffgrund 2
Wind Farm Update

DONG Makes Room in Norddeich for Borkum Riffgrund 2

DONG Energy has once again selected the Papenburg-based Johann Bunte Bauunternehmung as the general contractor on the project to expand the existing offshore wind farm operations and maintenance (O&M) centre in Norden-Norddeich, Germany.

about 9 years ago
SHL Piles 9 WTG and 2 OTM Locations at Beatrice
Wind Farm Update

SHL Piles 9 WTG and 2 OTM Locations at Beatrice

On 11 May, Seaway Heavy Lifting (SHL) installed the 11th set of jacket foundation piles at the Beatrice offshore wind farm in Outer Moray Firth.

about 9 years ago
Pacific Orca Assumes Position on Galloper
Wind Farm Update

Pacific Orca Assumes Position on Galloper

Wind turbine installation vessel (WTIV) Pacific Orca arrived some 27 kilometres off Suffolk in the afternoon hours of Sunday, 14 May to kick off the installation of the 56 Siemens 6MW turbines on the 336MW Galloper offshore wind.

about 9 years ago
TenneT Seeks Contractors for Hollandse Kust Zuid, Noord Offshore Platforms
Wind Farm Update

TenneT Seeks Contractors for Hollandse Kust Zuid, Noord Offshore Platforms

TenneT has launched a qualification process for candidates interested in tendering for the delivery of offshore platforms that will connect wind farms at Hollandse Kust Zuid and Hollandse Kust Noord offshore areas to the Dutch grid on the mainland.

about 9 years ago
Galloper Offshore Substation On the Move
Wind Farm Update

Galloper Offshore Substation On the Move

The offshore substation for the 336MW Galloper wind farm, built at Heerema Fabrication Group’s Hartlepool yard, has sailed away to the installation site in the outer Thames Estuary, some 27 kilometres off the Suffolk coast.

about 9 years ago
Maryland PSC Gives Go-Ahead to US Wind, Deepwater Wind Projects
Wind Farm Update

Maryland PSC Gives Go-Ahead to US Wind, Deepwater Wind Projects

The Maryland Public Service Commission (PSC) today awarded offshore wind renewable energy credits (ORECs) to two projects to be built off the state’s coast, enabling US Wind and Deepwater Wind (Skipjack Offshore Energy) to install 368MW of capacity.

about 9 years ago
CIP in 1.5GW Offshore Wind Push in Taiwan
Wind Farm Update

CIP in 1.5GW Offshore Wind Push in Taiwan

Danish fund management company Copenhagen Infrastructure Partners (CIP) has acquired three offshore wind sites under development in Taiwan with a combined capacity of 1,500MW.

about 9 years ago
Bill Aiming to Relocate Aqua Ventus I Dismissed
Wind Farm Update

Bill Aiming to Relocate Aqua Ventus I Dismissed

A bill aiming to prohibit the permitting of an offshore wind energy project within the Monhegan Lobster Conservation Area, or within 10 nautical miles of the area, was dismissed by the U.S. State of Maine’s Energy, Utilities and Technology committee.

about 9 years ago
MCT Brattberg Seals Galloper Offshore Substation Deal
Wind Farm Update

MCT Brattberg Seals Galloper Offshore Substation Deal

Swedish cable systems provider MCT Brattberg has supplied the cable penetration seals for the offshore substation built by Heerema Fabrication Group for the 336MW Galloper wind farm project off Suffolk.

about 9 years ago
US Wind Cleared to Install Maryland Offshore Wind Met Mast
Wind Farm Update

US Wind Cleared to Install Maryland Offshore Wind Met Mast

US Wind has received its final air emissions permit from the Maryland Department of the Environment to install a meteorological tower in the Maryland Wind Energy Area, with the company set to begin the installation process immediately.

about 9 years ago
Trianel Windpark Borkum II Reaches Financial Close
Wind Farm Update

Trianel Windpark Borkum II Reaches Financial Close

The 200MW Trianel Windpark Borkum II (TWBII) offshore wind farm project in the German North Sea has reached financial close, Green Giraffe said. Green Giraffe was the sole financial advisor to TWBII, initially owned by EWE and Trianel. Green Giraffe helped arrange the sale of a minority stake to ewz

about 9 years ago
Photo of the Day: Tahkoluoto Foundations Waiting for Vole au Vent
Wind Farm Update

Photo of the Day: Tahkoluoto Foundations Waiting for Vole au Vent

Gravity-based foundations that will support the offshore wind turbines at the Tahkoluoto are currently lined up in Pori, Finland, and waiting for the installation vessel Vole au vent, due to arrive by the end of next week.

about 9 years ago
EnBW Reveals Albatros Team
Wind Farm Update

EnBW Reveals Albatros Team

Following the announcement that EnBW reached the final investment decision for the 112MW Albatros offshore wind farm, the German energy company said that the supply contracts for all main infrastructure work for the project are now concluded.

about 9 years ago
Avangrid Takes Half of Vineyard Wind
Wind Farm Update

Avangrid Takes Half of Vineyard Wind

Iberdrola’s U.S.-based subsidiary Avangrid Renewables has agreed to acquire a 50% stake in the Vineyard Wind project offshore Massachusetts from Copenhagen Infrastructure Partners (CIP).

about 9 years ago
  • 1
  • …
  • 448
  • 449
  • 450
  • …
  • 640