offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Wind Farm Update

Loading filters...
Operations & MaintenanceTechnologyVesselsAuthoritiesBusiness & Finance
Pori Ready for Next Batch of Tahkoluoto Wind Turbine Components
Wind Farm Update

Pori Ready for Next Batch of Tahkoluoto Wind Turbine Components

The next two shipments of turbine components for the 40MW Tahkoluoto offshore wind farm are set to arrive in Pori, Finland, next week, according to the developer’s social media pages.

about 9 years ago
Siem Chooses ELA Containers for Wind Farm SOV
Wind Farm Update

Siem Chooses ELA Containers for Wind Farm SOV

ELA Container Offshore GmbH has delivered two 20-foot offshore multipurpose containers to Siem Offshore Contractors GmbH. The containers were installed on board the Siddis Mariner, which is currently operating as a walk-to-work service operation vessel (SOV) on the 400MW Bard Offshore 1 wind farm lo

about 9 years ago
Vroon Sends Second PSV to Rampion
Wind Farm Update

Vroon Sends Second PSV to Rampion

Vroon Offshore Service’s platform supply vessel (PSV) VOS Prelude has joined MPI Offshore’s wind turbine installation vessel (WTIV) MPI Discovery and another Vroon’s PSV, VOS Prime, on the 400MW Rampion offshore wind project off the south coast of England.

about 9 years ago
Kincardine Offshore Puts Kishorn Dry Dock to Use
Wind Farm Update

Kincardine Offshore Puts Kishorn Dry Dock to Use

Kincardine Offshore Windfarm Limited (KOWL) has opted to use Kishorn Dry Dock in Strathcarron, Wester Ross, during the construction of the 48MW Kincardine floating wind farm.

about 9 years ago
Rhenus Completes Wikinger Supply Runs
Wind Farm Update

Rhenus Completes Wikinger Supply Runs

Rhenus Offshore Logistics has concluded its first contract in the Baltic Sea after completing 15 supply runs to Iberdrola’s Wikinger offshore wind farm.

about 9 years ago
Blyth Foundations Nearing Completion
Wind Farm Update

Blyth Foundations Nearing Completion

Four out of five upper steel shafts have been lifted onto the gravity based foundations built for the Blyth Offshore Demonstrator Project at the Neptune dry dock on the Tyne in Newcastle, EDF Energy Renewables said.

about 9 years ago
Saint-Brieuc OWF Clears Administrative Hurdles
Wind Farm Update

Saint-Brieuc OWF Clears Administrative Hurdles

Ailes Marines, the developer and future operator of the 496MW offshore wind farm project in the Bay of Saint-Brieuc, France, has received the three administrative authorisations required to construct and operate the wind farm. The company has now obtained the concession of utilisation of the maritim

about 9 years ago
Hammer Time on Merkur Offshore Wind Farm
Wind Farm Update

Hammer Time on Merkur Offshore Wind Farm

GeoSea has installed the first of 66 monopiles on the 396MW Merkur offshore wind farm in the German North Sea.

about 9 years ago
Sear Joins Hohe See Foundations Team
Wind Farm Update

Sear Joins Hohe See Foundations Team

Belgian steel foundations specialist Smulders has selected the Rostock-based Sear GmbH to provide electrical engineering for 71 transition pieces for EnBW’s 497MW Hohe See offshore wind farm in the German North Sea.

about 9 years ago
Friesland Council Approves Offshore Wind Investment
Wind Farm Update

Friesland Council Approves Offshore Wind Investment

The Council of the Dutch Province of Friesland has approved the proposed EUR 127 million investment in the 320MW Friesland offshore wind farm (Windpark Fryslân), according to local media.

about 9 years ago
SPT Offshore Adds Aberdeen Wind Farm to Bucket List
Wind Farm Update

SPT Offshore Adds Aberdeen Wind Farm to Bucket List

Royal Boskalis Westminster N.V. (Boskalis) has once again contracted SPT Offshore, this time for the detailed design and installation suction pile foundations for Vattenfall’s 92.4MW Aberdeen offshore wind farm.

about 9 years ago
Rampion OSS Topside Touches Down off Sussex
Wind Farm Update

Rampion OSS Topside Touches Down off Sussex

Scaldis has installed the 2000-tonne offshore substation topside on the 400MW Rampion offshore wind farm some 14 kilometres off the Sussex coast.

about 9 years ago
Boskalis Taps SPT Offshore for Hornsea One Foundations Work
Wind Farm Update

Boskalis Taps SPT Offshore for Hornsea One Foundations Work

Royal Boskalis Westminster N.V. (Boskalis) has contracted SPT Offshore to install suction pile foundations on DONG Energy’s 1.2GW Hornsea Project One wind farm off UK.

about 9 years ago
Harland and Wolff to Build Borkum Riffgrund 2 Suction Buckets
Wind Farm Update

Harland and Wolff to Build Borkum Riffgrund 2 Suction Buckets

Northern Ireland’s marine manufacturer Harland and Wolff (H&W) has been chosen by jacket foundation supplier ST3 Offshore to supply suction buckets for DONG Energy’s Borkum Riffgrund 2 offshore wind farm in the German North Sea.

about 9 years ago
  • 1
  • …
  • 452
  • 453
  • 454
  • …
  • 640