offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

All

Loading filters...
Contracts & TendersR&DTechnologyNewsVesselsWind Farm UpdateAuthoritiesContributionIndustryEnvironmentBusiness & FinancePorts & LogisticsOperations & Maintenance
PelaFlex wind and wave energy hybrid demonstrator
Contracts & Tenders

MPS Floating Platform to Feature FibreMax Tendons

Welsh company Marine Power Systems (MPS) has joined forces with FibreMax to provide integrated floating foundation and tendon solutions to the growing floating offshore wind sector. The tendon solution will be used in the anchoring and moorings of MPS’ tension leg platform (TLP), called PelaFlex, to

about 3 years ago
Zero Investments in Offshore Wind Farms in Europe in 2022 – WindEurope
News

Zero Investments in Offshore Wind Farms in Europe in 2022 – WindEurope

Not a single investment in an offshore wind farm in Europe was made in 2022, apart from a few small floating wind projects, according to WindEurope. Several offshore wind farms were expected to reach financial close last year, but final investment decisions were delayed due to inflation, market inte

about 3 years ago
Wind Orca to Sport KenzFigee Deck Crane
Vessels

Wind Orca on Moray East Duty

Cadeler’s jack-up vessel Wind Orca is scheduled to start work on the Moray East offshore wind farm today, 1 February, when major component inspection and repair activities are set to begin on several wind turbines. The work is planned to be done on four potential wind turbines that might need repair

about 3 years ago
Photo from Borkum Riffgrund 2 which came into operation in 2018.
Authorities

Germany Launches 7 GW Offshore Wind Tender

Germany’s Federal Network Agency has launched a tender for four areas in the North Sea and the Baltic Sea with a combined offshore wind capacity of 7 GW. Three areas (N-11.1, N-12.1, and N-12.2), each with an output of 2,000 MW, are located in the North Sea, and one area (O-2.2) with a capacity of [

about 3 years ago
DEME Viking Neptun
Vessels

Viking Neptun Joins DEME Fleet

DEME group has announced that the DP3 offshore installation vessel Viking Neptun arrived at its base in Vlissingen, the Netherlands, for the first time. Viking Neptun will join the installation vessel Living Stone and reinforce the company’s cable installation capacity, DEME said. Featuring the famo

about 3 years ago
Hellenic Cables’ Inter-Array Links for Two More US Offshore Wind Farms
Contracts & Tenders

Hellenic Cables’ Inter-Array Links for Two More US Offshore Wind Farms

Greek cable manufacturer Hellenic Cables, owned by Belgian Cenergy Holdings, has signed contracts with Ørsted and Eversource for the supply of inter-array cables for their South Fork Wind and Revolution Wind offshore wind projects in the United States. Under the contracts, Hellenic Cables will desig

about 3 years ago
Formosa 2 Wind Farm Stands Complete Offshore Taiwan
Wind Farm Update

Formosa 2 Wind Farm Stands Complete Offshore Taiwan

All 47 Siemens Gamesa 8 MW wind turbines have been installed at the 376 MW Formosa 2 wind farm off the Miaoli coast in Taiwan. The last wind turbine was successfully installed on Tuesday, 31 January. The AIS data shows Fred. Olsen Windcarrier’s jack-ups Blue Tern and Bold Tern working on the wind fa

about 3 years ago
SSE Renewables Looking For Offshore Survey Squad
Contribution

Offshore Wind Giants Join Forces to Address Carbon Emissions

Eleven offshore wind developers are partnering with the Carbon Trust to develop methodology and guidance to measure and address the carbon emissions associated with offshore wind farms throughout their lifecycle. The offshore wind developers that joined forces with the Carbon Trust are bp, EnBW, Fre

about 3 years ago
Ørsted Starts Building Hornsea Three’s Kittiwake Artificial Nesting Structures
Environment

Ørsted Starts Building Hornsea Three’s Kittiwake Artificial Nesting Structures

Ørsted has commenced work on constructing artificial nesting structures for Black-legged kittiwake offshore Minsmere and Lowestoft in East Suffolk, UK, as part of a compensation scheme associated with its Hornsea Three offshore wind farm. The works were scheduled to start on 30 January for the site

about 3 years ago
Vineyard Wind and Shoreline Offshore to Build CTV Terminal in New Bedford
Business & Finance

Vineyard Wind and Shoreline Offshore to Build CTV Terminal in New Bedford

Vineyard Wind, a joint venture between Avangrid and Copenhagen Infrastructure Partners (CIP), has entered into a partnership with Shoreline Offshore to build a berthing and fueling area for crew transfer vessels (CTVs). The work will involve deploying two floating barges on Pope’s Island, New Bedfor

about 3 years ago
1.2 GW Baltic Power Offshore Wind Farm Moves Forward
Authorities

1.2 GW Baltic Power Offshore Wind Farm Moves Forward

The 1.2 GW Baltic Power wind project offshore Poland has received its first building permit for the onshore part of the development, according to a recent social media post by Daniel Obajtek, CEO of PKN Orlen. The work on the project’s onshore development is planned to start in 2024, Obajtek said. T

about 3 years ago
RWE Orders 100 MW Electrolysers for Offshore Wind to Hydrogen Project
Business & Finance

RWE Orders 100 MW Electrolysers for Offshore Wind to Hydrogen Project

German energy company RWE has ordered two 100-megawatt proton exchange membrane (PEM) electrolysers from Linde Engineering for its GET H2 hydrogen project. The two electrolyser plants, which will be powered by offshore wind from the North Sea, are part of RWE’s efforts to build a total of 300 MW of

about 3 years ago
Finland to Lease Sea Area for Offshore Wind Extension Project
Contracts & Tenders

Finland to Lease Sea Area for Offshore Wind Extension Project

Finnish state-owned enterprise Metsähallitus will lease the public area off the coast of Pori Tahkoluoto to Suomen Hyötytuuli for offshore wind power production. The agreement is the first long-running access right contract for public water area designated for wind power production. The project coul

about 3 years ago
Welsh Port Readying for Floating Wind by Simulating In-Port Manoeuvring Ops
Operations & Maintenance

Welsh Port Readying for Floating Wind by Simulating In-Port Manoeuvring Ops

With 4 GW of floating wind capacity to soon be awarded in the Celtic Sea, and more planned to come after that, ports in the UK are preparing to accommodate the construction and maintenance operations for the emerging industry. At Pembroke Port, a project simulating the processes of manoeuvring float

about 3 years ago
  • 1
  • …
  • 349
  • 350
  • 351
  • …
  • 2945