offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

All

Loading filters...
Business & FinanceContracts & TendersWind Farm UpdateR&DTechnologyVesselsAuthoritiesIndustryJobs & RecruitmentOperations & Maintenance
Siemens Gamesa Shareholders to Vote on Delisting Next Month, Siemens Energy Secures 92.72 Pct Stake
Business & Finance

Siemens Gamesa Shareholders to Vote on Delisting Next Month, Siemens Energy Secures 92.72 Pct Stake

Siemens Gamesa Renewable Energy’s (SGRE) shareholders will meet on 25 January to vote on delisting the company’s shares in response to a takeover bid launched by Siemens Energy, whose cash tender offer was accepted by 77.88 per cent of SGRE’s minority shareholders, which will secure a total of 92.72

about 3 years ago
Artistic illustration of wind turbines and a substation at Dogger Bank Wind Farm
Contracts & Tenders

Euskalforging to Produce Flanges for Dogger Bank C

Spain-based manufacturer of rolled rings euskalforging has won a contract to produce flanges for the 1.2 GW Dogger Bank C offshore wind farm. Under the contract, the company will ring roll 87 rings for transition pieces and 87 rings for monopiles with an outside diameter larger than 8 metres. Dogger

about 3 years ago
Siemens Gamesa Ships Out First Set of 115-Metre Wind Turbine Blades
R&D

Siemens Gamesa Ships Out First Set of 115-Metre Wind Turbine Blades

Three 115-metre blades to be installed on the SG 14-236 DD offshore wind turbine prototype have left Siemens Gamesa’s factory in Aalborg and are on their way to the test center in Østerild, Denmark. ”The SG 14-236 DD is the newest member of our offshore wind turbine family, with 115-meter blades whi

about 3 years ago
Jan De Nul Takes Delivery of Voltaire, ‘World’s-Tallest’ Jack-Up
Vessels

Jan De Nul Takes Delivery of Voltaire, ‘World’s-Tallest’ Jack-Up

Jan De Nul has taken delivery of its jack-up vessel, Voltaire, from the COSCO Shipping Shipyard in China. The vessel had been delivered by the shipyard on 15 December, and departed for Dubai on the morning of Tuesday, 20 December. Designed in-house, Voltaire will be used to transport, lift and insta

about 3 years ago
The Crown Estate Reveals New Floating Wind Leasing Process
Authorities

Crown Estate Accelerates Celtic Sea Floating Offshore Wind Surveys

The Crown Estate has announced the awarding of the first contracts for its first major investment in surveys to help with the construction of floating offshore wind farms in the Celtic Sea. The awarding of the first contracts marks an important step in what is anticipated to be a multi-million pound

about 3 years ago
New 1.8 GW Floating Wind Project in the Adriatic Earmarks 800 MW for Green Hydrogen Production
Contracts & Tenders

New 1.8 GW Floating Wind Project in the Adriatic Earmarks 800 MW for Green Hydrogen Production

A Milan-based company has requested a concession for a site off the Italian coast in the central Adriatic Sea with plans to build a 1.8 GW floating offshore wind farm and use 800 MW of that capacity for a green hydrogen production plant at an industrial area in a nearby municipality. This is an exce

about 3 years ago
Adam Middleton Siemens Energy VP for Western Europe; Photo Navingo BV
Industry

Offshore Wind Turbines Need to Be Standardised, Energy Transition Industrialised to Reach Targets, Says Siemens Energy VP for Western Europe

Governments need to move from talking about policies to implementation, the offshore wind industry needs to employ standardisation, and clear rules and regulations need to be set for green hydrogen in order to move faster with large-scale deployment and achieve meaningful progress in limiting global

about 3 years ago
New England Wind Offshore Wind Project Reaches New Milestone
Authorities

New England Wind Offshore Wind Project Reaches New Milestone

The Bureau of Ocean Energy Management (BOEM) has published a draft Environmental Impact Statement (EIS) for the proposed New England Wind offshore project in Massachusetts. The notice of availability will be published in the Federal Register on 23 December, which will open a 60-day public comment pe

about 3 years ago
UK Vessel Operator Starts Fleet-Wide Offshore Wind Recruitment Drive
Jobs & Recruitment

UK Vessel Operator Starts Fleet-Wide Offshore Wind Recruitment Drive

UK infrastructure vessel support operator, North Star, has launched a recruitment drive for crew ahead of its first hybrid-powered offshore wind fleet arriving in UK waters early next year. The company, which has facilities in Aberdeen, Lowestoft, and Newcastle, is aiming to hire 42 qualified seafar

about 3 years ago
EEW Joins Project to Develop Monopiles for 100-Metre Depths
R&D

EEW Joins Project to Develop Monopiles for 100-Metre Depths

Entrion Wind and EEW have signed a Memorandum of Understanding (MoU) through which EEW will join in on the ongoing demonstration studies in Kristiansand, Norway for the patent-pending fully restrained platform (FRP) offshore wind foundation technology. Under the MoU, the two companies will jointly c

about 3 years ago
A photo of the Ormonde offshore wind farm in the UK
Authorities

Finland Picks Developer of First Large-Scale Offshore Wind Farm

Vattenfall has entered a joint venture with the Finnish state-owned enterprise, Metsähallitus, to build and operate Finland’s first major offshore wind farm. The project, located at Korsnäs off the Finnish west coast, will have a capacity of 1.3 GW and a potential annual production of 5 TWh. Vattenf

about 3 years ago
Eneti Secures First Wind Turbine Installation Contract for Mega Jack-Up Newbuild
Contracts & Tenders

Eneti Secures First Wind Turbine Installation Contract for Mega Jack-Up Newbuild

Seajacks UK, a wholly-owned subsidiary of Eneti, has signed a contract with an undisclosed client to transport and install turbines for a project commencing in the first half of 2025. The contract will be performed by Eneti’s first of two NG16000X wind turbine installation vessels currently under co

about 3 years ago
Avangrid Decides to Back Out of PPAs Signed for 1.2 GW Massachusetts Project, Plans It for April Solicitation
Authorities

Avangrid Decides to Back Out of PPAs Signed for 1.2 GW Massachusetts Project, Plans It for April Solicitation

Avangrid, the developer of the 1.2 GW Commonwealth Wind offshore wind project in Massachusetts, has filed a motion to dismiss the ongoing review and approval proceedings for its power purchase agreements (PPAs) at the Massachusetts Department of Public Utilities (DPU) and plans to take the project t

about 3 years ago
Cadeler’s Mega Jack-Ups to Feature MAN Engines
Contracts & Tenders

Cadeler’s Mega Jack-Ups to Feature MAN Engines

MAN Energy Solutions (MAN ES) has secured an order to supply engines to COSCO Heavy Industries, a Chinese shipbuilder based in Qidong, China, for the construction of Cadeler’s second F-class jack-up vessel. It is one of four orders for engines, with the other orders including two X-class and another

about 3 years ago
  • 1
  • …
  • 365
  • 366
  • 367
  • …
  • 2945