offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

All

Loading filters...
EventsFeaturedHeadlinesOEEC ContentPress releasesBusiness & FinanceBusiness developmentFixed-BottomProject UpdatesWind Farm UpdateGreen HydrogenPower-to-XAuthoritiesPlanning & PermittingCablesGrid ConnectionOffshore PlatformsFloating Wind
The Final Countdown: Preparing for OEEC 2025
Events

The Final Countdown: Preparing for OEEC 2025

[PRESS RELEASE BY NAVINGO BV] The energy is rising as we enter the final countdown to the 18th edition of the Offshore Energy Exhibition & Conference (OEEC), taking place on 25–26 November at RAI Amsterdam. In less than one week, thousands of professionals from across the offshore energy sector will

about 8 months ago
The Seaway Aimery cable installation vessel
Featured

Cable Installation Work Underway at Ørsted’s Two US Offshore Wind Farm Sites

Ørsted has completed the 2025 foundation installation campaign at the Sunrise Wind offshore project site in the US and is now commencing cable installation works on both its projects under construction in the Northeast US, Revolution Wind and Sunrise Wind. According to the latest Notice to Mariners

about 8 months ago
Shell Buys Offshore Wind Power for New Electrolyser Plant in Germany
Featured

Shell Buys Offshore Wind Power for New Electrolyser Plant in Germany

Shell has signed a five-year power purchase agreement (PPA) with Nordsee One GmbH, a joint venture between Northland Power (85 per cent) and RWE (15 per cent), for the Nordsee One offshore wind farm in Germany. Under the PPA, which will take effect from June 2027, Shell will offtake approximately on

about 8 months ago
JDR's Chief Strategy Officer: 'Look at Floating Wind'
Long Reads

JDR's Chief Strategy Officer: 'Look at Floating Wind'

Strategic outlook on floating offshore wind growth.

about 8 months ago
Liebherr: Future Wind Farms Might Be Installed from Office
Long Reads

Liebherr: Future Wind Farms Might Be Installed from Office

Automation and remote operations in offshore wind.

about 8 months ago
New Scour Protection Solution Design Inspired by Turtles
Long Reads

New Scour Protection Solution Design Inspired by Turtles

Biomimicry in foundation design.

about 8 months ago
Baltic East Orlen Group
Featured

Orlen Secures Environmental Permit for 1 GW Polish Offshore Wind Farm

Orlen Group has secured the environmental permit for its 1 GW Baltic East offshore wind farm in Poland from the Regional Directorate for Environmental Protection in Gdańsk. This milestone brings the project closer to participation in the first Polish offshore wind auction, scheduled for December thi

about 8 months ago
NKT Joint overboarding offshore export cable repair
Featured

NKT Completes Beatrice Export Cable Repair, 588 MW Offshore Wind Farm Returns to Full Capacity

NKT has completed a turnkey repair of one of the 220 kV high-voltage AC subsea export cables connecting the Beatrice offshore wind farm in the Scottish Moray Firth to the Aberdeenshire coast. In April 2025, an unplanned transmission outage occurred on one of two of Beatrice’s Transmission Capital Pa

about 8 months ago
Jasmund Substation Ready to Set Sail to Baltic Sea for Offshore Installation
Featured

Jasmund Substation Ready to Set Sail to Baltic Sea for Offshore Installation

Both the topside and the jacket foundation of the 300 MW Jasmund offshore substation have been loaded out and are ready to set sail to the Baltic Sea for offshore installation. The topside, constructed at HSM Offshore Energy’s Stormpolder yard in the Netherlands, measures 48 metres long, 33 metres w

about 8 months ago
Berlin Looks to Acquire Minority Stake in TenneT Germany with Multi-Billion Plan
Featured

Berlin Looks to Acquire Minority Stake in TenneT Germany with Multi-Billion Plan

Germany has earmarked a budget ceiling of EUR 7.6 billion for the possible purchase of a minority stake in the German arm of transmission system operator (TSO) TenneT, subject to parliamentary approval. Reuters reported on 12 November 2025 that Germany intends to spend over multiple years to acquire

about 8 months ago
Korea Floating Wind MTSE
Featured

Korea Floating Wind Clears Marine Traffic Safety Review for Offshore Wind Project

Korea Floating Wind (KF Wind), a joint venture between Ocean Winds and Mainstream Renewable Power, has completed the Marine Traffic Safety Examination (MTSE) for its offshore wind project in South Korea. MTSE is a vital regulatory step for permitting an offshore wind farm, in which the Ministry of O

about 8 months ago
First Polish-Built Vestas Nacelles Standing at Baltic Power Offshore Wind Farm Site
Featured

First Polish-Built Vestas Nacelles Standing at Baltic Power Offshore Wind Farm Site

The first nacelles from Vestas’ Polish production facility have been installed and are getting ready for commissioning at the 1.2 GW Baltic Power offshore wind farm. The first three V236-15 MW turbines, consisting of nacelles manufactured at Vestas’ facility in Szczecin, have been installed at the s

about 8 months ago
South Korea Jeonnam 1 COP CIP First Power
Featured

CIP Presses Ahead with 1.5 GW Floating Wind Project in South Korea

Haewoori Offshore Wind has obtained approval for the Marine Traffic Safety Assessment (MTSA) from the Ministry of Oceans and Fisheries for its 1.5 GW floating wind project in South Korea. The developer said that this is a result of years of close collaboration with the ministry and related authoriti

about 8 months ago
2.4 GW New Jersey Offshore Wind Project Axed by Developers
Featured

2.4 GW New Jersey Offshore Wind Project Axed by Developers

The developer of the 2.4 GW Leading Light offshore wind project has informed the New Jersey Board of Public Utilities (NJBPU) that it will not move forward with the project. In a letter filed with NJBPU, the developers, Invenergy and energyRE, said that the company has faced a series of obstacles in

about 8 months ago
  • 1
  • …
  • 51
  • 52
  • 53
  • …
  • 2945