offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

All

Loading filters...
Contracts & TendersGrid ConnectionBusiness & FinanceR&DTechnologyWind Farm UpdateVesselsOperations & Maintenance
Artistic illustration of Aibel offshore platform in offshore wind farm
Contracts & Tenders

Aibel, Hitachi ABB Ink Dogger Bank C Contracts

Aibel and Hitachi ABB Power Grids have been awarded contracts for the third phase of the 3.6 GW Dogger Bank Wind Farm development, Dogger Bank C. Under an EPC contract, Aibel will deliver a third converter platform for the world’s largest offshore wind farm. In October 2019, the company was selected

about 5 years ago
An image of Ideol's floating wind technology
Business & Finance

BW Offshore Buys Into Ideol

The oil & gas services provider BW Offshore has signed a share purchase agreement to become a strategic owner of the floating wind technology developer Ideol. The deal will see BW Offshore obtaining a 50 per cent stake by investing EUR 60 million and the establishment of BW Ideol, a global integrate

about 5 years ago
Poland Floats Offshore Wind Electricity Price Cap
Business & Finance

Poland Floats Offshore Wind Electricity Price Cap

Poland plans to cap the maximum price of electricity produced at offshore wind farms selected in this year’s Contracts for Difference (CfD) rounds at PLN 301.5/MWh (around EUR 67.08/MWh). The price cap was introduced in a draft regulation submitted by Poland’s Ministry of Climate and Environment. Th

about 5 years ago
GBM Works to Build Prototype for Silent Monopile Installation
Business & Finance

GBM Works to Build Prototype for Silent Monopile Installation

GBM Works has received a EUR 1.8 million grant from RVO.nl to construct a prototype of its monopile installation technology that is said to minimize noise pollution. The TU Delft spin-off is developing a method which uses a waterjet to liquefy the soil on the inside of the tube, which, in combinatio

about 5 years ago
The first GE nacelle arriving at the Saint-Nazaire pre-assembly site
Wind Farm Update

First GE Haliade 6 MW Nacelle Arrives at Saint-Nazaire OWF Pre-Assembly Site

The first nacelle for a GE Haliade 6 MW wind turbine for the French Saint-Nazaire offshore wind farm has arrived at the project’s pre-assembly site in the Port of Saint-Nazaire. The nacelles are being produced in GE Renewable Energy’s factory in Montoir-de-Bretagne, from where the next units will be

about 5 years ago
Iberdrola to Invest Over EUR 1 Billion in Floating Wind Farm Offshore Spain
Business & Finance

Iberdrola to Invest Over EUR 1 Billion in Floating Wind Farm Offshore Spain

Iberdrola is planning to invest more than EUR 1 billion to develop a 300 MW floating wind farm offshore Spain. The study, design, and engineering of the wind farm could begin this year and the project could generate more than 2,800 jobs per year until it becomes operational in 2026, according to the

about 5 years ago
An image illustrating a Hywind Tampen floating wind turbine above and under water
Contracts & Tenders

Kværner Orders Slipform Systems for Hywind Tampen

Kværner has selected German engineering company Dominion for the design, supply, and supervision services for the slipform systems that will erect the concrete wind towers for the Hywind Tampen floating wind project. Dominion said its cylindrical and conical sets of slipform systems can be used mult

about 5 years ago
Finnish Enterprise Seeks Partner to Develop Offshore Wind Farm
Business & Finance

Finnish Enterprise Seeks Partner to Develop Offshore Wind Farm

Finnish state-owned enterprise Metsähallitus is looking for a partner to jointly develop an offshore wind project in Finland. As previously reported, the environmental services provider plans to develop a wind farm approximately 15 kilometres off the coast of the municipality of Korsnäs. According t

about 5 years ago
Atlantic Endeavor Working on Coastal Virginia Offshore Wind Project
Business & Finance

Atlantic Endeavor Working on Coastal Virginia Offshore Wind Project

Atlantic Wind Transfers’ new crew transfer vessel (CTV) Atlantic Endeavor has begun working at the Coastal Virginia Offshore Wind (CVOW) project. Blount Boats launched the Chartwell 24 CTV the day after Christmas, after which the vessel spent three days going through sea trials and USCG inspections.

about 5 years ago
A Borssele III & IV wind turbine close up with the Blauwwind logo visible and the wind farm in the background
Operations & Maintenance

Borssele 3 & 4 Ready to Officially Enter Operation

The 731.5 MW Borssele 3 & 4 wind farm off the Netherlands will be officially handed over to the Operations team on Thursday, 18 February, as all construction phase-related activities have been completed and the wind farm is now generating electricity in full capacity. The first of the project’s 77 M

about 5 years ago
Wärtsilä Designs Multi-Purpose SOV for US Offshore Wind Market
Vessels

Wärtsilä Designs Multi-Purpose SOV for US Offshore Wind Market

The Finnish technology group Wärtsilä has designed the world’s first US-flagged, Jones Act-compliant hybrid multi-purpose service operation vessel (SOV) to serve the needs of the US offshore wind power market. The 76-metre vessel can accommodate up to 60 crew and wind-farm technicians in 55 single a

about 5 years ago
The green Living Stone cable laying vessel
Wind Farm Update

Inter-Array Cable Installation Resuming Soon at Moray East OWF

The second inter-array cable installation campaign will begin this month at the Moray East offshore wind farm, where the seventh wind turbine was installed on 10 February and the decommissioning of the met mast is currently underway. The first inter-array cable installation campaign, which started o

about 5 years ago
Smulders Sends Off First Saint-Nazaire Transition Pieces
Wind Farm Update

Smulders Sends Off First Saint-Nazaire Transition Pieces

Smulders has loaded out and shipped off the first four transition pieces built for the Saint-Nazaire wind farm at its fabrication yard in Hoboken, Belgium. The transition pieces are headed to Maasvlakte at the Port of Rotterdam, the Netherlands, where later this week they will be transferred onto SA

about 5 years ago
RCG: Global Offshore Wind Investment Sets New Record in 2020
Business & Finance

RCG: Global Offshore Wind Investment Sets New Record in 2020

Global financial investment for offshore wind set a new record in 2020 with USD 30 billion, surpassing the previous high of USD 22 billion from 2018, according to The Renewables Consulting Group (RCG). According to RCG’s Global Renewable Infrastructure Projects (GRIP) database, the total capacity fi

about 5 years ago
  • 1
  • …
  • 645
  • 646
  • 647
  • …
  • 2945