offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

All

Loading filters...
Contracts & TendersGrid ConnectionWind Farm UpdateVesselsR&DTechnologyOperations & MaintenanceBusiness & Finance
Siemens-Dragados Offshore Consortium Lands BorWin5 Contract
Contracts & Tenders

Siemens-Dragados Offshore Consortium to Build BorWin5 Substations

Transmission system operator TenneT has awarded the consortium of Siemens AG and Dragados Offshore SA with a contract to build onshore and offshore converter stations for the 900 MW BorWin5 grid connection. At 230 kilometres, BorWin5 will be the longest offshore direct current connection to date, sc

about 6 years ago
First Moray East Export Cable Makes Landfall
Grid Connection

First Moray East Export Cable Makes Landfall

The first export power cable for the 950 MW Moray East offshore wind project has made landfall at Inverboyndie, Scotland, Moray Offshore Windfarm (East) Ltd said. The installation of the offshore export cables is being undertaken by NKT. To minimise environmental impact, the cable was pulled through

about 6 years ago
Nexans Aurora Welcomes Six Generators
Vessels

Nexans Aurora Welcomes Six Generators

Ulstein Verft has installed the generator set into cable laying vessel (CLV) Nexans Aurora. The company stated that the six generators from Rolls-Royce and ABB have been installed into the vessel according to schedule. Nexans signed a deal with Ulstein Verft for the construction of the vessel back i

about 6 years ago
BlueSATH Floating Turbine Prototype Sets Off for Installation
R&D

BlueSATH Floating Turbine Prototype Sets Off for Installation

The BlueSATH floating wind turbine prototype has departed for installation offshore Santander in Spain, Saitec Offshore Technologies said. Once installed, the 1:6 prototype of the BlueSATH (Swinging Around Twin Hull) turbine will operate for a period of 12 months after which it will be completely de

about 6 years ago
OOS Serooskerke SSCV at CMHI shipyard
Vessels

OOS New SSCVs Undergoing Final Touches

The two offshore mast cranes on board OOS International’s semi-submersible crane vessel (SSCV) OSS Walcheren have been installed and load-tested, while the company’s SSCV OOS Serooskerke is now being prepared for sea trials. OOS International ordered the construction of two vessels from China Mercha

about 6 years ago
Rovco to Survey Celtic Sea Floating Wind Site
Contracts & Tenders

Rovco to Survey Celtic Sea Floating Wind Site

Blue Gem Wind has awarded Rovco with a contract to carry out survey work at the site of the proposed 96 MW Erebus floating wind farm in the Celtic Sea. The million-pound contract will see Rovco carry out detailed geophysical and environmental site investigations to assess the seabed and sub-surface

about 6 years ago
A close-up of Prosperous 1 vessel name on the portside
Operations & Maintenance

Locally Built CTV for Yunlin OWF Launched

A Taiwan-built crew transfer vessel (CTV) which will operate at the Yunlin offshore wind farm has been completed and launched, according to Deutsche Windtechnik. The CTV, named Prosperous 1 (風盛1號), was ordered by the developer wpd and the service provider Deutsche Windtechnik from Prosperous Wind Sh

about 6 years ago
Geotechnical-Investigations-Begin-Offshore-North-Carolina
Wind Farm Update

Geotechnical Investigations Begin Offshore North Carolina

Horizon Geosciences has started geotechnical investigations at the Kitty Hawk offshore wind project off North Carolina, U.S. The six-week work will be carried out by Kommandor Susan and will consist of geotechnical borehole drilling and sampling. In May 2017, Avangrid Renewables secured the rights t

about 6 years ago
Siemens-Completes-Baltic-1-OSS-Upgrade
Grid Connection

Siemens Completes Baltic 1 OSS Upgrade

Siemens Energy Service has completed an upgrade on the offshore substation of the Baltic 1 offshore wind farm in Germany. The work, completed in July, included an upgrade on the existing gas-insulated switchgear to improve and safeguard the energy transmission. The pre-campaign started in March when

about 6 years ago
First Moray East OTM Touches Down
Grid Connection

First Moray East OTM Touches Down

The first of the three Offshore Transformer Modules (OTMs), ME OSP 3, has been installed at the 950 MW Moray East wind farm offshore Scotland. Siemens Energy shipped out the wind farm’s first OTM, ME OSP 2, for offshore installation on 30 June. This OTM will be installed later this week, a spokesper

about 6 years ago
Equinor Names New President and CEO
Business & Finance

Equinor Names New President and CEO

Norwegian offshore energy major Equinor has appointed Anders Opedal as the new president and CEO. The company’s current president and CEO, Eldar Sætre, will retire after six years as CEO and more than 40 years in the company. “Equinor is entering a phase of significant change as the world needs to t

about 6 years ago
CWind-Taiwan-and-HYTOR-Bring-Temporary-Power-Solutions-to-Taiwan
Business & Finance

CWind Taiwan and HYTOR Bring Temporary Power Solutions to Taiwan

CWind Taiwan and HYTOR Tools Solutions have teamed up to bring temporary power solutions to the Taiwanese offshore wind market. As part of the strategic alliance, the two companies said they imported a significant quantity of 100 kVA generators to be based in CWind Taiwan’s operational hub in Taichu

about 6 years ago
ABPmer to Carry Out Physical Process Assessment for Welsh Floater
R&D

ABPmer to Carry Out Physical Process Assessment for Welsh Floater

ABPmer has been commissioned to complete the physical process impact assessment in support of the Development Consent Order Application for the Erebus floating wind farm offshore Wales. Blue Gem Wind, the joint venture between Simply Blue Energy and Total, is developing floating offshore wind sites

about 6 years ago
Siemens Gamesa's Danish Blade Test Center Gets IECRE Approval
Business & Finance

Siemens Gamesa’s Danish Blade Test Center Gets IECRE Approval

Siemens Gamesa’s blade test center in Aalborg, Denmark, has gained IECRE approval. According to the company, the approval was granted in the highest level required (stage (4)) with a high independency of certification bodies. Siemens Gamesa now became the first non-commercial inhouse blade test faci

about 6 years ago
  • 1
  • …
  • 723
  • 724
  • 725
  • …
  • 2945