offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

All

Loading filters...
TechnologyAuthoritiesBusiness & FinanceContracts & TendersGrid ConnectionWind Farm UpdateR&DEnvironmentJobs & RecruitmentPorts & LogisticsVessels
Ørsted and ITM Power Explore Different Approach to Integrating Offshore Wind and Hydrogen
Technology

Ørsted and ITM Power Explore Different Approach to Integrating Offshore Wind and Hydrogen

Ørsted and ITM Power are working on a design concept to integrate hydrogen electrolysers into offshore wind turbines. The project proposes an electrolyser placed in the turbine tower or very near it, directly electrically connected to the DC link in the turbine, with power flow control and water sup

about 6 years ago
Virginia Governor Signs Off on 5.2 GW by 2034 Offshore Wind Target
Authorities

Virginia Governor Signs Off on 5.2 GW by 2034 Offshore Wind Target

Virginia’s Governor Ralph Northam has signed the Clean Economy Act which requires at least 5.2 GW of offshore wind power to be developed in this U.S. state by 2034. The Virginia General Assembly passed this House Bill 1526 and Senate Bill 851 Clean Economy Act in March. The act provides that 5.2 GW

about 6 years ago
New TI Geosciences Seafloor Drill Ready for Sea Trials
Technology

New TI Geosciences Seafloor Drill Ready for Sea Trials

TI Geosciences has completed a testing program, including harbor trials, of its sonic wireline-operated remote drill (SWORD). SWORD is now ready to be set-up onto its permanent vessel and commence sea trials, the final milestone before entering the market. According to Royal IHC, who is supporting T

about 6 years ago
A photo of EOLOS floating LiDAR device launched before being towed to PGE's offshore wind farm site
Business & Finance

PGE to Ditch Projects Outside Core Business, Offshore Wind Safe

PGE will close projects with unsatisfactory rate of return and especially those not directly related to its core business.

about 6 years ago
TKF Details Kaskasi Contract
Contracts & Tenders

TKF Details Kaskasi Contract

Dutch cable manufacturer Twentsche Kabel Fabriek (TKF) has revealed further details about the company’s scope of work on the 342 MW Kaskasi offshore wind project. As reported earlier, Seaway 7 awarded TKF with a contract to deliver 33 kV inter-array cables for the wind farm. Under the contract, TKF

about 6 years ago
Thor Wind Turbine
R&D

New Zealand: Taranaki Region Offshore Wind-Rich

A regional development agency from Taranaki, New Zealand, has published a paper on the offshore wind potential in the waters off Taranaki coast.

about 6 years ago
Thor Wind Turbine
Environment

Australian Govts Urged to Fast-Track Star of the South Processes

Australian division of the environmental network Friends of the Earth said building renewable energy could be key to post-COVID recovery effort.

about 6 years ago
Thor Wind Turbine
Business & Finance

Dutch Companies Partner Up for US Offshore Wind

A group of Dutch companies and knowledge institutions have formed a public-private partnership that will focus on the offshore wind industry in the United States.

about 6 years ago
US-Voters-Strongly-Favour-Offshore-Wind-Survey
R&D

US Voters Strongly Favour Offshore Wind – Survey

Over 80 percent of the voters in the United States favour offshore wind energy, with widespread support coming from both major political parties and every demographic group across the country, according to a recent national survey. Conducted by Public Opinion Strategies in March and released this we

about 6 years ago
A photo of the Innovation vessel installing a monopile at the Borssele offshore site
Wind Farm Update

Half of Borssele 1+2 Foundations In

DEME has installed half of the 94 monopile foundations at the Borssele 1+2 offshore wind farm site.

about 6 years ago
A zoomed in image of a map pinpointing the three locations
Grid Connection

Star of the South Unveils Three Transmission Route Options

Star of the South Wind Farm has unveiled three potential power transmission corridors for Australia’s first offshore wind farm.

about 6 years ago
Sea Challenger during the first load-out at Port Esbjerg
Ports & Logistics

Sea Challenger Sets Off to Install First Borssele 1 + 2 Turbines

DEME’s jack-up Sea Challenger is en route to the Borssele 1 + 2 offshore wind farm in the Dutch North Sea loaded with the first batch of wind turbine components. As reported earlier, Sea Challenger loaded the turbine components at the Port of Esbjerg in Denmark. Owned and developed by Ørsted, the 75

about 6 years ago
A photo of a DEME offshore vessel working on a wind farm
Vessels

DEME Charters Floatel to Pre-Quarantine Offshore Crews

DEME Group has chartered a floatel which will serve for pre-quarantine for the company’s crews working on offshore wind and dredging vessels.

about 6 years ago
Van Oord Taps Visser & Smit Hanab for Borssele III and IV Cables
Contracts & Tenders

Van Oord Taps Visser & Smit Hanab for Borssele III and IV Cables

Van Oord has awarded Dutch high voltage specialists Visser & Smit Hanab with a contract to perform all array cable terminations and testing work at the Borssele III and IV offshore wind farm in the Dutch North Sea. A total of 77 MHI Vestas V164 9.5 MW wind turbines will be connected to the Borssele

about 6 years ago
  • 1
  • …
  • 779
  • 780
  • 781
  • …
  • 2945