offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Grid Connection

Loading filters...
Business & FinanceWind Farm UpdateContracts & TendersAuthoritiesEnvironment
TFKable Produces First Moray East Onshore Cable
Grid Connection

TFKable Produces First Moray East Onshore Cable

The TFKable Group has produced the first part of the 220kV onshore high-voltage cable for the Moray East offshore wind farm in the UK. According to the company, the 220kV cable is now ready to be delivered from its Bydgoszcz plant in Poland for the 950MW offshore wind project. TFKable and VolkerInfr

about 7 years ago
EU Okays New Race Bank OFTO Ownership
Grid Connection

EU Okays New Race Bank OFTO Ownership

The European Commission has approved, under the EU Merger Regulation, the acquisition of joint control over Diamond Transmission Partners by Diamond Transmission Corporation Limited (DTC) and by Infrared Capital Partners Limited (IRCP). Diamond Transmission Partners is the holding company of the Off

about 7 years ago
German TSOs Raise Offshore Wind Targets in Draft Grid Development Plan
Grid Connection

German TSOs Raise Offshore Wind Targets in Draft Grid Development Plan

German transmission system operators (TSOs) have issued the first draft of the Grid Development Plan (GDP) 2030, which includes expanded offshore wind capacity scenarios. According to 50Hertz, Amprion, TenneT and TransnetBW, the expansion targets have been increased to 17GW in scenarios B and C 2030

about 7 years ago
Pfisterer Part of Moray East Cable Team
Grid Connection

Pfisterer Part of Moray East Cable Team

Pfisterer has won a contract for the supply of the 220kV land cable accessories for the grid connection of the 950MW Moray East offshore wind farm in Scotland. The company won the contract in cooperation with the cable manufacturer TELE-FONIKA Kable and the international cable and pipeline installat

about 7 years ago
Polish TSO: Bałtyk I Could Go Full Tilt
Grid Connection

Polish TSO: Bałtyk I Could Go Full Tilt

Polish grid operator Polskie Sieci Elektroenergetyczne (PSE) has specified the connection conditions for the Bałtyk I offshore wind farm, which would allow the project to be built to its full capacity of 1,560MW. Bałtyk I is being jointly developed by Polenergia and Equinor, who acquired a 50% stake

about 7 years ago
Nemo Link Interconnector Put Into Operation
Grid Connection

Nemo Link Interconnector Put Into Operation

The Nemo Link subsea interconnector between Belgium and Great Britain has become operational. The energy exchange started on Thursday, 31 January at midnight. An average of 773MW will be exchanged and a total amount of 18,559MWh will be transported for the whole day via the Nemo Link cable. The inte

about 7 years ago
Taiwan Sets Out New Offshore Wind Feed-in-Tariffs
Grid Connection

Taiwan Sets Out New Offshore Wind Feed-in-Tariffs

Taiwan’s Ministry of Economic Affairs has set out the new feed-in-tariff (FiT) at TWD 5.5160/kWh (EUR 0.156731/kWh) for the 20-year offshore wind Power Purchase Agreements (PPAs) signed in 2019. The wind projects that sign their PPAs in 2019 will receive TWD 6.2795/kWh during the first ten years of

about 7 years ago
Rhenus Scores BorWin Gamma Gig
Grid Connection

Rhenus Scores BorWin Gamma Gig

Rhenus Offshore Logistics has won the tender to provide the supply logistics for TenneT’s BorWin gamma HVDC platform in the German North Sea. Rhenus will be conducting the supply runs using the Eurus Express vessel from the offshore base in the Port of Emden until the end of the project. The company

about 7 years ago
TFKable and VolkerInfra Land Moray East Cable Contract
Grid Connection

TFKable and VolkerInfra Land Moray East Cable Contract

The TFKable Group and VolkerInfra have won a contract to provide the onshore high voltage cable for the 950MW Moray East offshore wind farm in Scotland. Siemens is in charge of connecting the offshore wind farm to the Scottish grid. TFKable Group’s HV production plant in Bydgoszcz, Poland will manuf

about 7 years ago
JDR Strikes Again in Taiwan
Grid Connection

JDR Strikes Again in Taiwan

JDR Cable Systems (JDR) has been selected by Jan De Nul to supply subsea power cables and accessories for the Taiwan Power Company Offshore Wind Farm Phase One. The project is located off the coast of Fangyuan in Changhua County in Central Western Taiwan. It is being developed by Taipower with a con

about 7 years ago
Dutch Watchdog Okays Offshore Grid Connection EIR
Grid Connection

Dutch Watchdog Okays Offshore Grid Connection EIR

The Netherlands commission for environmental assessment has issued a positive recommendation on the Environmental Impact Report of the Hollandse Kust (noord) and the Hollandse Kust (west Alpha) grid connections. Pondera Consult, together with Arcadis, provided the EIR and the necessary studies. The

about 7 years ago
Elia Hires NHV Chopper Squad
Grid Connection

Elia Hires NHV Chopper Squad

The NHV Group has won a contract with Elia to provide helicopter services in support of the construction of a high voltage electricity grid in the Belgian part of the North Sea. The operations are expected to start in April 2019 with the flights departing from NHV’s base in Ostend. NHV will support

about 7 years ago
Borssele Beta Jacket Assembly Underway
Grid Connection

Borssele Beta Jacket Assembly Underway

HSM Offshore has commenced the assembly of the jacket foundation for the Borssele Beta offshore transformer station at its yard in Schiedam, the Netherlands. The Dutch company secured a contract by TenneT TSO for the construction of the Borssele Beta platform in September 2017, after it had cut the

about 7 years ago
German Wind Sector Calls For Q1 2019 Offshore Wind Tender, Volume Expansion
Grid Connection

German Wind Sector Calls For Q1 2019 Offshore Wind Tender, Volume Expansion

Germany’s leading wind industry associations have urged the German government to issue a tender for 1.5GW of available offshore grid capacity in the first quarter of 2019, and to increase the 2030 and 2035 expansion volumes. The associations, BWE, BWO, Stiftung OFFSHORE-WINDENERGIE, VDMA Power Syste

about 7 years ago
  • 1
  • …
  • 117
  • 118
  • 119
  • …
  • 276