offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Grid Connection

Loading filters...
Operations & MaintenanceVesselsWind Farm UpdateBusiness & FinanceContracts & TendersAuthoritiesEnvironmentR&DTechnologyPorts & Logistics
Nexans Sends Off Last Beatrice Export Cable Section (VIDEO)
Grid Connection

Nexans Sends Off Last Beatrice Export Cable Section (VIDEO)

Nexans has completed the manufacturing of the 220kV offshore export cable for the Beatrice wind farm, with the final section now en route to the offshore site in the Outer Moray Firth, Scotland.

about 8 years ago
Energinet Resumes Kriegers Flak Onshore Cabling Works After Winter Break
Grid Connection

Energinet Resumes Kriegers Flak Onshore Cabling Works After Winter Break

Energinet has resumed onshore cable installation works for the Kriegers Flak offshore wind farm after the winter break, and is now ready to start with the final stage of cable excavation on land.

about 8 years ago
Ørsted Enters Final Onshore Substation Contract Talks in Taiwan
Grid Connection

Ørsted Enters Final Onshore Substation Contract Talks in Taiwan

Ørsted’s Greater Changhua offshore wind projects in Taiwan are in the contracting process of TWD 3 billion (approximately EUR 83.6 million) onshore substation EPC (engineering, procurement, and construction) contract, the Danish company said.

about 8 years ago
Ørsted Teams Up with CR Classification Society for Greater Changhua
Grid Connection

Ørsted Teams Up with CR Classification Society for Greater Changhua

Ørsted has assigned CR Classification Society to perform a structural review of the offshore substation design for the Greater Changhua offshore wind projects in Taiwan.

about 8 years ago
Ørsted Charters Attollo Jack-Up for Borkum Riffgrund 2
Grid Connection

Ørsted Charters Attollo Jack-Up for Borkum Riffgrund 2

Ørsted has awarded Aberdeen-based Attollo Offshore with a contract to provide an accommodation jack-up vessel during the commissioning of the substation at the Borkum Riffgrund 2 offshore wind farm.

about 8 years ago
Triton Knoll Makes Further Onshore Infrastructure Cuts
Grid Connection

Triton Knoll Makes Further Onshore Infrastructure Cuts

Triton Knoll Offshore Wind Farm Limited has reduced the number of onshore cable circuits required for electricity transport from the offshore wind farm to the national grid. According to the project team, this will help reduce the overall construction footprint of the project and realise planned red

about 8 years ago
Ørsted Gets Positive Feedback on Hornsea Two OSS Application
Grid Connection

Ørsted Gets Positive Feedback on Hornsea Two OSS Application

UK governmental agencies, conservation organisations and companies have responded positively to Ørsted’s application to reduce the number of offshore substations and increase the size of the topsides on the Hornsea Project Two offshore wind project.

about 8 years ago
TenneT Presents Future Dutch Grid Connection Plans
Grid Connection

TenneT Presents Future Dutch Grid Connection Plans

Following the release of the Dutch Offshore Wind Energy Roadmap 2030, TenneT has tabled proposals on how to connect offshore wind farms in the Holland Coast (West), North of the Wadden Sea Islands, and IJmuiden Far Offshore zones to the offshore grid.

about 8 years ago
Dutch Government Reveals 11.5GW by 2030 Offshore Wind Roadmap
Grid Connection

Dutch Government Reveals 11.5GW by 2030 Offshore Wind Roadmap

The Dutch government has presented the Offshore Wind Energy Roadmap 2030, setting out plans for the development of additional 7GW of offshore wind capacity in the 2024-2030 period.

about 8 years ago
EDS HV Wraps Up Cable Sentry Trials at Gwynt y Môr
Grid Connection

EDS HV Wraps Up Cable Sentry Trials at Gwynt y Môr

High voltage engineering specialist EDS HV Group has successfully completed trials at the Gwynt y Môr offshore wind farm as part of its EU Funded Horizon 2020 project.

about 8 years ago
Arkona Offshore Substation On the Move
Grid Connection

Arkona Offshore Substation On the Move

The offshore substation topside built for the Arkona offshore wind farm has left STX France’s yard in Saint Nazaire and is now en route to the German Baltic Sea.

about 8 years ago
Siemens Working on Commissioning Beatrice OTM 1
Grid Connection

Siemens Working on Commissioning Beatrice OTM 1

Siemens Transmission and Distribution is carrying out commissioning works on the recently installed Offshore Transformer Module (OTM) at the Beatrice offshore wind farm in preparation for the energisation of the system.

about 8 years ago
Sweden Tackles Offshore Wind Grid Connection Costs
Grid Connection

Sweden Tackles Offshore Wind Grid Connection Costs

The Swedish Energy Agency has, on behalf of the government, examined two different models to remove the grid connection costs for offshore wind power.

about 8 years ago
Elia Reveals Main MOG Contract Winners
Grid Connection

Elia Reveals Main MOG Contract Winners

Belgian transmission system operator Elia is on track to complete the Modular Offshore Grid by September 2019 after awarding all the main contracts for the project.

about 8 years ago
  • 1
  • …
  • 135
  • 136
  • 137
  • …
  • 276