UK’s Secretary of State for Business, Energy and Industrial Strategy (BEIS) has approved an increase in the total works area for the Hornsea Project Two onshore substation site.
The UK-based Wescott Industrial Services has completed the preparation and coating of the steel surfaces for the Siemens Offshore Transformer Modules (OTM) to be used on the Beatrice offshore wind farm.
After the Inch Cape Offshore team had spent the last year consulting on a new location for its onshore infrastructure, based on the feedback received on the initial application, the developer has now submitted a new application to East Lothian Council for planning permission in principle, proposing
Belgian transmission system operator Elia has awarded Heerema Fabrication Group (HFG) with a contract for the fabrication of the Offshore SwitchYard (OSY) platform for the Modular Offshore Grid (MOG) project in the Belgian North Sea.
The demand for subsea cables in the offshore wind industry will grow at a 15% Compound Annual Growth Rate (CAGR) in the period from 2018 to 2022, accounting for 45% of the overall forecast demand for the period, according to a new report from Westwood Global Energy Group.
Belgian transmission system operator Elia has appointed London Offshore Consultants (France) SARL as the marine warranty surveyor for submarine cables and the Offshore SwitchYard (OSY) platform for the Modular Offshore Grid (MOG) project in the Belgian North Sea.
Seaway Heavy Lifting (SHL) has secured a contract to install the Offshore SwitchYard (OSY) platform for Elia’s Modular Offshore Grid (MOG) project in the Belgian North Sea.
Nexans has completed the installation of its 400kV Outdoor Sealing Ends at Blackhillock, where the onshore substation for the 588MW Beatrice offshore wind farm is being built.
EDS HV Group has completed cable termination and testing works at the 400MW Rampion offshore wind farm located off Sussex, UK.
STX France has organised a delivery ceremony for the Arkona offshore substation in Saint-Nazaire, France.
STX France has transported the offshore substation jacket foundation for the Arkona offshore wind farm to a quay in the Saint-Nazaire Port, from where it will be placed on a barge and transported to the wind farm site in the German Baltic Sea.
The UK Competition and Markets Authority (CMA) has dismissed an appeal by SSE and EDF Energy against Ofgem’s decision to reject their request to modify industry rules.
Wood has led a joint industry project (JIP) to improve knowledge and understanding of submarine cables behaviour on the marine environment and rocky seabed, and develop a new set of industry guidelines.
The foundation for the second Kriegers Flak offshore substation was installed on 22 February, a few days after Jan de Nul installed the first one.