offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Grid Connection

Loading filters...
Business & FinanceWind Farm UpdateR&DTechnology
Ecosse Triples Profit
Grid Connection

Ecosse Triples Profit

Ecosse Subsea Systems Ltd (ESS) more than trebled profits to £3.4 million and increased revenue by 88% to £15.6 million according to its latest published accounts. The Aberdeenshire-based subsea engineering specialist attributed the phenomenal growth to a diversification from its traditional oil and

about 11 years ago
Prysmian Inks EUR 230 Mln Cable Deal with 50Hertz
Grid Connection

Prysmian Inks EUR 230 Mln Cable Deal with 50Hertz

Prysmian Group has secured a new award by 50Hertz Offshore GmbH – a subsidiary of 50Hertz Transmission GmbH, transmission grid operator in Germany – worth approximately € 230 million to design, produce and install a power cable system for the offshore wind park cluster West of Adlergrund in the Germ

about 11 years ago
VolkerInfra, VBMS Win Burbo Bank Extension Job
Grid Connection

VolkerInfra, VBMS Win Burbo Bank Extension Job

A joint venture comprising VolkerInfra and VBMS has been appointed by DONG Energy to execute the export cable landfall installation for Burbo Bank Extension offshore wind farm in Liverpool Bay. The works consist of two 600 meter duct installations, both intertidal and onshore, between Rhyl and Prest

about 11 years ago
EDS Completes £10 Mln Gwynt y Môr Cabling Job
Grid Connection

EDS Completes £10 Mln Gwynt y Môr Cabling Job

Lancashire based EDS is marking the completion of a £10m contract for cable termination work at the world’s second largest operating offshore wind farm, with an exemplary health and safety record. EDS has now completed all high voltage and fibre optic cabling works on the 160 wind turbine transition

about 11 years ago
DONG Energy Contracts RXPE for Race Bank OWF Job
Grid Connection

DONG Energy Contracts RXPE for Race Bank OWF Job

RXPE has won another multi-million GBP turnkey contract from DONG Energy for equipment to support compliance with the UK Grid Code. DONG Energy selected RXPE through a competitive tender process. The power electronics specialist will provide two market-leading utility grade STATCOMs for DONG Energy’

about 11 years ago
World’s Longest Interconnector Takes Off
Grid Connection

World’s Longest Interconnector Takes Off

National Grid and Statnett, the Norwegian Transmission System Operator, yesterday signed the ownership agreement which signals the start of the construction phase for the 730 kilometre interconnector between UK and Norway. The NSN Link would be the first electricity interconnector between the two co

about 11 years ago
Onshore Dudgeon OWF Work Commences
Grid Connection

Onshore Dudgeon OWF Work Commences

Work has commenced in Norfolk to install the underground cables and construct the substations that will enable electricity produced by the Dudgeon Offshore Wind Farm to be distributed into the UK National Grid electricity network. Two underground cables will run from Weybourne on the North Norfolk c

about 11 years ago
Anholt Back Online
Grid Connection

Anholt Back Online

Anholt offshore wind farm has been turned back on just over four weeks after faulty cable forced it to shut down. The wind farm went offline on 21 February after which NKT and JD Contractors worked to replace the faulty cable section. “It is a mammoth task to find the fault and replace the broken [&

about 11 years ago
MEDOW Researchers Introduce Their Grid-Related Work
Grid Connection

MEDOW Researchers Introduce Their Grid-Related Work

In February 2015, three MEDOW researchers presented their work at the 11th IET International Conference on AC and DC Power Transmission (ACDC 2015) in Birmingham, UK. Robert Renner’s work concentrates on optimal DC reference voltage in HVDC grids. The paper introduces a method to find the optimal DC

about 11 years ago
Jee Gets OK to Demonstrate ‘U-tube’ Solution
Grid Connection

Jee Gets OK to Demonstrate ‘U-tube’ Solution

Jee Ltd has been awarded phase two of a contract with Scottish Enterprise, which will see them undertake the demonstration of their innovative “U-tube” solution in Scottish tidal waters. In September 2014, Jee secured a phase one contract with Scottish Enterprise, which involved a pioneering study f

about 11 years ago
ABB Wins NordLink Job
Grid Connection

ABB Wins NordLink Job

ABB has won orders worth around $900 million from a consortium comprising utilities Statnett and TenneT as well as promotional bank KfW to supply onshore high-voltage direct current (HVDC) converter stations and the cable system in the German sector that will facilitate the first ever interconnectio

about 11 years ago
Atkins Enters Agreement for Three Hornsea Project One Substations
Grid Connection

Atkins Enters Agreement for Three Hornsea Project One Substations

Dong Energy has awarded a contract to Atkins for engineering design services for three offshore substations at Hornsea Project One offshore wind farm. Atkins now has major contracts with Dong Energy for the detailed engineering design of eight offshore substations. Previous contracts covered the off

about 11 years ago
DNV GL Surveys Renewables Integration into Electricity Grids
Grid Connection

DNV GL Surveys Renewables Integration into Electricity Grids

In “Beyond Integration: Three dynamics reshaping renewables and the grid”, a recent global industry research initiative, DNV GL gathered views from over 1,600 energy sector participants across more than 70 countries. The study addressed key questions on how to best move forward the integration of re

about 11 years ago
Anholt Cable Repair Nears Completion
Grid Connection

Anholt Cable Repair Nears Completion

Danish grid operator, Energinet.dk, expects the cable connecting Anholt offshore wind farm with the grid to go online by 26 March. Energinet.dk’s subcontractors managed to cut out the faulty section of the cable and make a connection at the one end of the replacement cable. However, due to bad weath

about 11 years ago
  • 1
  • …
  • 204
  • 205
  • 206
  • …
  • 276