The Carbon Trust, as part of its Offshore Wind Accelerator (OWA), has launched a new competition to fast track the development of new 66kV cables to be used by the offshore wind industry. The goal is to ensure that new 66kV cables are developed in time to be used on Round 3 projects in the […
The load out of DolWin alpha marks the start of a journey that the platform will make to its final offshore destination, the DolWin area in German North Sea. This operation was performed at the Heerema’s Zwijndrecht fabrication yard at the Drechthaven. The following is a video of the load out of Dol
On May 18, the topsides of the DolWin alpha converter platform was loaded out from Heerema’s Zwijndrecht fabrication yard at the Drechthaven, located on the river the Oude Maas. This operation marks the start of a journey that the platform will make via Schiedam to its final offshore destination, th
National Grid and Statnett confirm plans for further development of the world’s longest subsea interconnector. British energy company National Grid and Statnett, the Norwegian transmission system operator (TSO), have signed a co-operation agreement to continue work on the interconnector to link the
On Monday, May 6, the Narragansett Town Council voted 5-0 to suspend negotiations with Deepwater Wind, which is developing the Block Island offshore wind farm, in order to gather more information on the project’s local impact. The motion to bring all talks and negotiations with the developer to a st
Each time, a cable is installed between wind turbines at an offshore wind farm, time spent offshore can be reduced by approximately three days. A new cable laying concept from DONG Energy points the way to reducing costs. Each time they can move work from the offshore site onshore, they become more
Technip Offshore Wind has started offshore operations on an array cable installation contract for phase 1 of the Borkum Wind Farm development, located 45 kilometers to the North of the German island of Borkum, in the North Sea. This project, awarded by Trianel, is Technip’s first offshore wind, arra
Jee Ltd, a leading subsea engineering and training firm, has just completed a contract with Technip Offshore Wind Ltd for the provision of subsea power cable installation engineering on a new and innovative offshore wind farm project. Jee provided Technip with valuable information about the safest a
Zaratan: 3 Monopiles in 36 Hours (Germany) Following the news that almost 60 monopiles had been completed on 18 March, specialised jack-up vessel Seajacks Zaratan continues installation at a rapid pace at the Meerwind Offshore Park, installing 3 monopiles in just under 1 and a half days. VIDEO: Zara
Zanzibar President Ali Mohamed Shein officially launched a new 100 megawatts marine cable line from the national grid (Tanzania mainland) on April 10, a sign of energy progress which is expected to lead Zanzibar towards its own “reliable power”. At the celebration of this move, some members of the Z
The work for the network connection of the second German offshore wind farm in the Baltic Sea, the EnBW Baltic 2, is in progress. The vessel Aura rinsed the first submarine cable section into the Baltic ground, on Saturday, 20 April 2013, for the connection of Baltic 2. A total of sixty kilometers o
Innogy Nordsee 1 GmbH is seeking for submarine cable laying services for its offshore wind farm situated 32 km north of the island of Juist between the traffic separation area Terschelling-German Bight and German Bight Western Approach. The contract is for the preparation of the design, supply, stor
TenneT Offshore GmbH is responsible for the connection of the electrical substation of the offshore wind farms in the HelWin2 cluster. In order to connect the wind farms with the onshore AC grid TenneT requires seabed survey services for the potential clearance of unexploded ordnance. The wind farm
The installation work for the internal transformer platform for Trianel’s Borkum wind farm was successfully completed yesterday. During a two-day mission at the construction site, 45 kilometers off the Borkum’s coast, the heavy lift vessel Oleg Strashnov lifted the 2,400-ton deck onto the substructu