offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Grid Connection

Loading filters...
Business developmentInfrastructureResearch & DevelopmentCablesContracts & TendersSupply ChainBusiness & FinanceManufacturingOffshore PlatformsFixed-BottomProject UpdatesWind Farm UpdateAuthoritiesPlanning & PermittingOnshore InfrastructureIndustryMarket OutlooksOutlook & Strategy
Dutch Gov’t Issues Offshore Wind Tender Teaser
Grid Connection

Dutch Gov’t Issues Offshore Wind Tender Teaser

The Netherlands Enterprise Agency (RVO) plans to publish a European tender in the first half of April for geotechnical surveys of the Huibertgat and Ballonplaat sites in the Netherlands. The objective of the tender is to conclude an agreement with one or more tenderers who can carry out geotechnical

about 2 years ago
DOF repair cable job
Grid Connection

DOF Wins Offshore Wind Export Cable Repair Job

Norway-headquartered DOF Group has been awarded a contract to repair an export cable for an offshore wind farm in the Southern North Sea. The project, awarded by an international energy operator, includes the retrieval of the damaged cable and termination, installation, trenching, and commissioning

about 2 years ago
Offshore Wind Accounts for 45 Pct of NKT’s High-Voltage Order Backlog
Grid Connection

Offshore Wind Accounts for 45 Pct of NKT’s High-Voltage Order Backlog

Subsea power cable manufacturer NKT has reported a record-high order backlog for high-voltage cables for 2023, with 45 per cent of orders coming from offshore wind. At the end of last year, NKT’s order backlog was at EUR 10.8 billion, more than double the company saw at the end of 2022. In its full-

about 2 years ago
Seatrium to Build Third Offshore Wind Project in Netherlands for TenneT
Grid Connection

Seatrium to Build Third Offshore Wind Project in Netherlands for TenneT

A consortium led by Seatrium and GE Vernova will be constructing its third offshore wind project in the Netherlands for Dutch transmission system operator (TSO) TenneT, with the construction work commencing on 1 June 2024. In March 2023, Seatrium was awarded a five-year framework cooperation agreeme

about 2 years ago
Prysmian Lands EUR 5 Billion Cable Job for Projects Offshore Germany
Grid Connection

Prysmian Lands EUR 5 Billion Cable Job for Projects Offshore Germany

Italy-headquartered Prysmian has finalized three contracts worth in aggregate around EUR 5 billion with the transmission system operator (TSO) Amprion for BalWin1 and BalWin2 offshore grid connection systems and the DC34 underground cable project in Germany. According to Prysmian, this package deal

about 2 years ago
Second Moray West Substation Platform Touches Down
Grid Connection

Second Moray West Substation Platform Touches Down

The second offshore substation platform (OSP) has been installed at the Moray West offshore wind farm site in Scotland. The first OSP was installed in December 2023 by Boskalis’ DP installation vessel Bokalift 1 which also mounted the second OSP on its foundations on 10 January, according to a notic

about 2 years ago
50Hertz Moves Forward with Ostwind 3 Grid Connection
Grid Connection

50Hertz Moves Forward with Ostwind 3 Grid Connection

German transmission system operator (TSO) 50Hertz has received planning approval decisions for the offshore route of the Ostwind 3 grid connection project in the Baltic Sea. The planning approval refers to the section in the exclusive economic zone (EEZ) and the section in the territorial sea, the s

about 2 years ago
Seaway7, Dong Fang Offshore Partner in Taiwan
Grid Connection

Seaway7, Dong Fang Offshore Partner in Taiwan

Seaway7 and Dong Fang Offshore (DFO) have signed a memorandum of understanding (MOU) on collaboration in the Taiwanese offshore wind market that will focus on cable installation. According to Seaway7, the MOU outlines the intention of the two companies “to collaborate in an exclusive manner and furt

about 2 years ago
New Jersey Kicks Off Work on Second Offshore Wind Transmission Tender
Grid Connection

New Jersey Kicks Off Work on Second Offshore Wind Transmission Tender

The US regional transmission company PJM Interconnection and the New Jersey Board of Public Utilities (NJBPU) have signed an agreement that opens the path towards New Jersey’s second offshore wind transmission tender. The agreement was filed with the Federal Energy Regulatory Commission (FERC) on 2

about 2 years ago
Polenergia Equinor Baltyk II and Baltyk III
Grid Connection

Polish Offshore Wind Farms Power Ahead

The Regional Director of Environmental Protection in Gdansk has issued a decision on the environmental conditions for the connection infrastructure of the Bałtyk II and Bałtyk III offshore wind projects in Poland. This allows the project’s investors, Polenergia and Equinor, to continue the project a

about 2 years ago
Germany Facing Offshore Wind Grid Expansion Delays
Grid Connection

Germany Facing Offshore Wind Grid Expansion Delays

Three of the planned new offshore grid connection systems in the German North Sea, which will connect to four offshore wind sites to be tendered this year and in 2026, will be delayed by up to two years, according to a letter that the German Federal Maritime and Hydrographic Agency (BSH) sent to the

about 2 years ago
Belgian Meshed Grid to the Rescue as Rentel Export Cable Gets Damaged
Grid Connection

Belgian Meshed Grid to the Rescue as Rentel Export Cable Gets Damaged

The export cable of the Rentel offshore wind farm is reported to have been damaged. However, the offshore wind farm keeps feeding electricity into the Belgian grid as the offshore power hub, Modular Offshore Grid (MOG), has taken over. Elia, the operator of Belgium’s MOG, says that the cable from th

about 2 years ago
Hollandse Kust Noord first power
Grid Connection

German and Dutch North Sea Yields 30 TWh of Offshore Wind Energy

Offshore wind farms in the German and Dutch North Sea generated over 30 TWh of renewable power, according to the German-Dutch transmission system operator (TSO) TenneT. The TSO transmitted around 19.24 TWh of wind energy from the German North Sea to land in 2023 and another 11.54 TWh entered the Net

about 2 years ago
Ørsted Contracts Jan De Nul for Hornsea 3 Export Cable Installation
Grid Connection

Ørsted Contracts Jan De Nul for Hornsea 3 Export Cable Installation

Ørsted and Jan De Nul Group have signed the offshore export cable installation contract for the 2.9 GW Hornsea 3 offshore wind farm in the UK. This is the first offshore HVDC installation contract awarded by Ørsted in the UK, the company said. Belgium-headquartered Jan De Nul Group will be responsib

about 2 years ago
  • 1
  • …
  • 35
  • 36
  • 37
  • …
  • 276