
The California Independent System Operator (ISO) has unveiled its draft 2023-2024 Transmission Plan, which includes 26 proposed projects worth USD 6.1 billion (approximately EUR 5.6 billion), with a majority of the investment related to offshore wind. According to the California ISO, the plan is bas

The Green Volt floating offshore wind farm in Scotland, being developed by Flotation Energy and Vårgrønn, a joint venture between Plenitude (Eni) and HitecVision, has been granted full onshore planning approval. The developers of the floating offshore wind project submitted the offshore consent appl

The first steel has been cut for RWE’s Nordseecluster NC 2 offshore substation which is being built by Atlantique Offshore Energy, the marine energy business unit of French company Chantiers de l’Atlantique. The Nordseecluster will be constructed in two phases, Nordseecluster A and Nordseecluster B,

Orient Adventurer, formerly the construction and flex lay vessel Polar Onyx which has been converted into a cable-laying vessel (CLV), has arrived in Taiwan’s port of Taichung, from where it will soon sail out to the Yunlin offshore wind farm site. The vessel will carry out cable-laying work on the

Offshore construction work on Princess Elisabeth Island, the world’s first energy island, is expected to start soon in the Belgian sector of the North Sea as cardinal buoys have been deployed to demarcate an exclusion zone within which only vessels working on the energy island will be allowed, accor

The installation of export cables at Dogger Bank C, the third phase of the 3.6 GW Dogger Bank Wind Farm in the UK, is scheduled to start in early April. The work will be performed in three campaigns to install three sections of export cable, with the first campaign starting on or around 9 April [&he

Last year was a record year for offshore wind projects reaching a final investment decision (FID) with nearly 9 GW of capacity hitting this milestone in 2023, according to WindEurope’s annual report, issued on 28 February. Ahead of its annual event, opening today in Bilbao, the European wind energy

Great Britain’s electricity system operator (ESO) has proposed a GBP 58 billion (approximately EUR 68 billion) investment in the electricity grid. The proposal outlines a vision for incorporating an additional 21 GW of offshore wind into the grid by 2035, which would bring the country’s total offsho

TenneT and Nexans, which signed framework agreements for three offshore grid connections last year, have now signed a call-off contract for the BalWin3 and LanWin3 projects, each of which will have a capacity of 2 GW and will link offshore wind farms to the German grid. In May 2023, TenneT awarded N

Equinor has been granted authorisation from the US Federal Energy Regulatory Commission (FERC) to link the Empire Wind 1 offshore wind project directly into New York’s transmission system. Approved on 1 March, the Large Generator Interconnection Agreement (LGIA) executed between Equinor’s Empire Win

France-headquartered Nexans has completed the offshore export cable pull-ins for both offshore substation platforms at the 882 MW Moray West wind farm, located in the Moray Firth in the northeast of Scotland. The cable-laying vessel Nexans Aurora took advantage of a recent period of favorable weathe

Elia, through its subsidiary WindGrid, has acquired a 35.1 per cent stake in the US company energyRe Giga, a subsidiary of energyRe, the co-developer of the 2.4 GW Leading Light Wind offshore wind project in New Jersey. The transaction, which closed at the beginning of February, is worth USD 400 mil

The developers of the 1.4 GW Cenos floating offshore wind project in Scotland are set to run a nearshore survey campaign in March to revalidate data collected in 2017 by NorthConnect, an interconnector project whose infrastructure Cenos planned to use to connect to the grid. Starting on 11 March, th

SSE and Equinor have scrapped plans to produce green hydrogen in the fourth phase of the Dogger Bank Wind Farm project in the UK, focusing entirely on power generation from the offshore wind farm. The decision follows the confirmation of an onshore grid connection location in the East Riding of York