Samson B recently worked with the Pacific Osprey on the Rhyl Flats Wind Farm. The Pacific Osprey is such an awesome sight it is a marvel that it even exists. Everything about it is huge with 160.9m length overall and breadth of 49m, she is a giant of the seas. Subsequently Samson B has been [&hellip
On Friday 20 June, Fendercare Marine opened the doors of its Great Yarmouth base to showcase its expansion of lifting products and services over the last two years. The Fendercare Marine Equipment and Lifting Services Open Day was attended by a wide array of existing and new customers, as well as me
Great Lakes Shipyard and B.V. Scheepswerf Damen Gorinchem (Damen) have entered into a five-year partnership authorizing Great Lakes Shipyard as an official builder of Damen designs. Great Lakes Shipyard will now offer the best of both worlds, the wide range and international experience of Damen desi
EP Tools, a Danish company with more than 15 years of experience in working with developers and construction companies in the wind and oil & gas industries, and CWind, a leading provider of services to the offshore wind industry, today announced that they are to provide temporary power supply at Nor
Wind energy now forms a vital part of the economy in many global regions and is expanding into new arenas. The Chinese market is strong, the US is recovering and with emerging nations now increasingly adopting renewable energy solutions, global growth is predicted to continue at a steady rate with d
Palfinger Marine has won the order for 97 PF 8000 cranes, which has been developed especially for the wind farms Gode Wind 1 and 2. The wind farms are located 45 km off the German coast. Start of construction will be the first half of 2015 at Gode Wind 2, followed by Gode Wind 1. […]
After two months of construction by ESG – Edelstahl und Umwelttechnik Stralsund GmbH, the Blade Rack system, a steal frame transport system, is completed and has already been deployed to the client, EnBW Baltic 2 GmbH. Outfitted to a construction vessel, the Blade Rack system is designed to moor 18
A&P Falmouth has completed its second major renewables project, after leading wave energy firm Seatricity’s next generation Oceanus 2 device left the docks on Saturday for Wave Hub. The wave energy converting device – a 10m diameter floating ring made from marine grade aluminium – will be the first
Following the announcement by the Chinese government on feed-in tariff for offshore wind earlier this month, Fliss Jones wrote an article about it. Jones is a part of DNV GL, company which became one of the leading global providers of services for managing risk after a merger in September 2013. Chin
One of the activities specific to offshore operations is the transfer of personnel between vessels and other offshore structures. Such transfers can include movements of personnel at crew change and shift change from vessel to vessel and also between vessels, offshore structures (including offshore
Offshore WIND’s photo of the day: The jack-up installation vessel Seajacks Leviathan in the Port of Falmouth, before the vessel left to work in the Irish Sea on June 9. The Seajacks Leviathan arrived in the port for minor repairs and mobilization of equipment. Recently, the vessel wrapped up the con
On June 18, during the visit of Premier Li Keqiang to the UK, the third Sino-British energy dialogue conference was held in London. It was hosted by the British Department for Energy and Climate Change, and Wu Xinxiong, the director of the National Energy Administration, and Edward David, the Britis
Earlier this year, a number of experienced new staff members with practical knowledge and expertise, specifically in the offshore energy sector’s subsea operations joined Auxilium Offshore. With the extensive expertise of the daily staff, the company’s aim is to bring the best team together with the
Following several rounds of shortlisting, FoundOcean has been chosen as one of just six finalists for the 2014 Private Business of the Year Award, with the winner to be announced on 10th September. According to event organisers Ford Sinclair, the number of entries was overwhelming, with over 1000 no