
All foundations, including the transition pieces (TPs), are now in place at Dogger Bank B, the second phase of the world’s largest offshore wind farm under construction, as the heavy-lift vessel (HLV) Seaway Alfa Lift recently installed the final TP. The vessel started installing the final five TPs

Geoquip Marine has completed a preliminary geotechnical site investigation for two 4 GW offshore wind projects in the German North Sea. Under the contract, the UK-based company drilled 28 boreholes across the project sites to analyse the subsea terrain for wind turbine foundations. Geoquip underwent

The news about the US government rescinding the order to halt Empire Wind 1 construction activities has been welcomed by the offshore wind industry and New York state agencies. With more than 1,500 construction workers involved in the project and its supply chain spanning multiple US states, Oceanti

Equinor and Polenergia have taken a final investment decision for the Bałtyk 2 and Bałtyk 3 offshore wind farms, which will have 1.44 GW of installed capacity in Poland. The total investment of the project is approximately PLN 27 billion (approximately EUR 6.28 billion) in the construction, excludin

The US Department of the Interior’s Bureau of Ocean Energy Management (BOEM) has notified Equinor that the stop-work order for the Empire Wind 1 offshore wind project, issued on 16 April, has been lifted. Equinor said on 19 May that the company will now resume construction work on what will be the f

BorWin epsilon offshore converter platform, part of TenneT’s BorWin5 grid connection that will link EnBW’s He Dreiht offshore wind farm with the German grid on land, has been installed at its designated site in the North Sea. The installation of both the jacket foundation and the topside was carried

RWE plans to sell a stake in its 1.4 GW Sofia offshore wind farm next year, which is currently under construction in the UK. In a press conference call speech published on 15 May, Michael Müller, CFO of RWE AG, said that the company intends to sell stakes in the Sofia offshore wind project next [&he

Ørsted has completed geotechnical and geophysical investigations at two Gippsland offshore wind farm sites in Australia. Using specialist vessels and equipment, the developer tested approximately 60 locations across its two feasibility licence areas by scanning and sampling the seabed in the Bass St

The partnership between BlueFloat Energy and Nadara has completed two-year wind and metocean monitoring campaigns at its Broadshore Hub and Bellrock floating offshore wind farm sites in Scotland. The campaigns involved the deployment of EOLOS’ FLS200 floating LiDAR buoys at the Broadshore Hub site,

Eleven wind turbines are now standing tall at the Sofia offshore wind farm site in the UK, where the work started in March and will continue until the end of the year. Foundation installation is also underway at the UK project site, with 76 monopile foundations now in place. The 1.4 GW project, deve

Following reports saying Equinor may pull the plug on the Empire Wind 1 project if the US government does not lift the order halting the construction soon, a company spokesperson confirmed to offshoreWIND.biz it was costing Equinor USD 50 million (around EUR 45 million) per week to keep the project

Synera Renewable Energy Group (SRE) has decided to acquire an additional 26 per cent stake in the 376 MW Formosa 2 offshore wind farm in Taiwan, raising its ownership from 25 per cent to a controlling 51 per cent. “SRE’s acquisition of an additional stake coincides with the second anniversary of For

Equinor could abandon the Empire Wind 1 offshore wind project “in the coming days” if the stop-work order, issued by the US government soon after the project started offshore construction work, is not lifted, the president of Equinor Renewables Americas, Molly Morris, recently shared in an interview

The first of 61 Siemens Gamesa turbines has been installed at the 488 MW Îles d’Yeu and Noirmoutier offshore wind farm site in France. The first Siemens Gamesa 8 MW wind turbine was installed by Jan De Nul’s jack-up vessel Vole au Vent at the site located 11.7 kilometres from the island of Yeu and [