offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

R&D

Loading filters...
Business & FinanceEnvironmentAuthoritiesTechnologyPorts & LogisticsContracts & TendersOperations & MaintenanceGrid ConnectionWind Farm UpdateVesselsTraining & Education
Ørsted Allots Fifteen Burbo Bank Extension Fund Grants
R&D

Ørsted Allots Fifteen Burbo Bank Extension Fund Grants

Ørsted has awarded grants to fifteen local organisations around Liverpool Bay, UK, as part of its Burbo Bank Extension Community Fund.

about 8 years ago
Irish Marine Institute Gets Galway Bay Test Site Approval
R&D

Irish Marine Institute Gets Galway Bay Test Site Approval

The Irish Government has approved a foreshore lease to the Marine Institute for the installation of a quarter-scale renewable energy test facility that will also see floating wind testing. However, the approval came with a limit for only one floating wind device being tested at a time.

about 8 years ago
Triton Knoll to Support Local Communities with Two Funds
R&D

Triton Knoll to Support Local Communities with Two Funds

Triton Knoll Offshore Wind Farm Ltd. is setting up two funds to support the local communities living close to the onshore infrastructure of the 860MW wind farm located some 32km offshore Lincolnshire, UK.

about 8 years ago
FOWIND Maps India’s Path from Zero to Five GW
R&D

FOWIND Maps India’s Path from Zero to Five GW

Following the announcement on India’s plans for inviting first offshore wind tenders next year with an aim to reach 5GW, the FOWIND Consortium today (19 December) published a report according to which the timeline of initiatives should be set to first add 500MW by 2022, raising this to 2-2.5GW by 20

about 8 years ago
British Geotechnical Association Recognises PISA Project
R&D

British Geotechnical Association Recognises PISA Project

The Ørsted-led PISA (Pile Soil Analysis) project has won the Fleming award from the British Geotechnical Association for the new shorter design of monopile foundations said to reduce green energy costs.

about 8 years ago
Nexans Ready to Deploy Boskalis Rockpiper at Beatrice
R&D

Nexans Ready to Deploy Boskalis Rockpiper at Beatrice

Nexans, using Boskalis’ fallpipe vessel (FPV) Rockpiper, is set to commence the rock emplacement campaign for the installation of the first of two export cables (EC1) in the Beatrice offshore wind farm export corridors on 21 December.

about 8 years ago
A2SEA Installs All Race Bank Turbines
R&D

A2SEA Installs All Race Bank Turbines

A2SEA’s jack-up vessel Sea Installer has installed the last turbine at Ørsted’s 573MW Race Bank offshore wind farm located off the North Norfolk coast in the UK.

about 8 years ago
Veja Mate Gets SGS Blessing
R&D

Veja Mate Gets SGS Blessing

SGS Germany has awarded the 402MW Veja Mate offshore wind farm with the project certificate, marking the wind farm’s final milestone.

about 8 years ago
Atlas Professionals Acquires Four New Global Offices
R&D

Atlas Professionals Acquires Four New Global Offices

Atlas Professionals has officially acquired Programmed Marine offices in Houston, Aberdeen, Dubai and Singapore, while the joint venture in Australia and New Zealand will remain as Programmed Marine.

about 8 years ago
Offshore Wind Brings Two More Companies to Lowestoft
R&D

Offshore Wind Brings Two More Companies to Lowestoft

Red Nine, a company providing solutions in the inhospitable and remote locations for the oil and gas sector, has set up an office at the OrbisEnergy hub at Lowestoft in Suffolk, UK, in order to offer its services to the offshore wind sector.

about 8 years ago
Using Acoustic Deterrent Devices Protects Minke Whales, Study Says
R&D

Using Acoustic Deterrent Devices Protects Minke Whales, Study Says

Using Acoustic Deterrent Devices (ADDs) during offshore wind farm construction is as an effective method for protection of minke whales, according to a study conducted through a joint industry project.

about 8 years ago
Oceaneering to Survey US Offshore Wind Ground
R&D

Oceaneering to Survey US Offshore Wind Ground

Oceaneering International has won a contract by US Wind to conduct high-resolution marine geophysical surveys at the 248MW Maryland offshore wind project starting in the second half of 2018.

about 8 years ago
UK Opens GBP 220 Million Offshore Wind Road to China
R&D

UK Opens GBP 220 Million Offshore Wind Road to China

UK’s Offshore Renewable Energy Catapult, China’s Tus-Wind and TusPark Newcastle have signed a collaboration agreement to work together to advance offshore wind technology co-operation between the two nations.

about 8 years ago
New Offshore Wind Tower Plant Rises in Port of Bilbao
R&D

New Offshore Wind Tower Plant Rises in Port of Bilbao

The temporary consortium of INBISA Construcción, Gaimaz and Intxausti has completed the first phase in the construction of the new offshore wind tower manufacturing plant for Haizea Wind Group in the Port of Bilbao, Spain.

about 8 years ago
  • 1
  • …
  • 106
  • 107
  • 108
  • …
  • 354