Rabobank has issued a report called Navigating the future of offshore wind energy, which states that a radical redesign of offshore wind energy installation vessels is needed in the long-term to lower installation costs and realise projected capacity growth. The high growth rates in offshore wind en
Nova Scotia’s recent tender for a berth at the Fundy Ocean Research Center for Energy (FORCE) has attracted three qualified bidders, and two tidal turbine developers will win the chance to demonstrate their technology in the Minas Passage in the Bay of Fundy, home to the world’s highest tides. The p
Successful trial results of the next generation of multi-purpose buoys tailored for the renewable energy industry have led to recent orders from operators in the wind energy sector. Dutch energy company Eneco has purchased Fugro’s used wind LiDAR buoy whilst a Japanese company is to deploy their buo
Renewable tidal energy sufficient to power about half of Scotland could be harnessed from a single stretch of water off the north coast of the country, engineers say. Researchers have completed the most detailed study yet of how much tidal power could be generated by turbines placed in the Pentland
Bharat Book Bureau has presented “World Offshore Wind Market Forecast 2013-2022” report. The last five years saw global capital expenditure increase significantly, however that over the next decade this spending will level off at approximately €15 billion per year. New global installations are expec
A forum will be held today at the University of Southern Maine, where the developers of Aqua Ventus project will give an update on its development and the performance of the VolturnUS wind turbine, as well as the offshore wind industry in general. The University of Maine-led offshore wind project, V
What does offshore wind technology have in common with a trip to Mars? Well, along with space tourism, interplanetary exploration, physicists’ search for dark matter, Formula E and electric cars, offshore wind power will become one of the coolest technologies in 2014 in the United States, according
Danish Shipowners’ Association and The Shipowners’ Association of 2010 have published a report under the title Global Evaluation of Offshore Wind Shipping Opportunity. The report gives an insight into the supply and demand in the offshore wind industry. The report has been produced by BMT/Navigant w
The Maine Public Utilities Commission (PUC) gave an initial consent to Maine Aqua Ventus I offshore wind project yesterday. Voting 2:1, the PUC approved the terms of an agreement between the state and the project’s developers, the Associated Press informs. This will put the project on the path to co
All three wind turbine blades have been installed on the V164-8.0 MW prototype at the Danish national test centre in Østerild, Vestas announced. The company said that good weather conditions on the night of January 13 allowed the installation of all three 80m long blades of the offshore wind turbine
Mainstream Renewable Power has deployed the North Sea’s first commercial floating LiDAR wind measurement device, designed to capture wind data in the harshest conditions, to support its proposed 450MW Neart Na Gaoithe offshore wind farm. A deal has been signed with technology providers FLiDAR NV, fo
In March 2013, Norwegian Centre for Offshore Wind Energy (NORCOWE) inaugurated a measurement campaign at Sola airport outside of Stavanger, Norway. The equipment installed consisted of one scanning and one static wind LiDAR system. In addition a second static wind LiDAR was installed some 3 km furth
The UK National Oceanography Centre (NOC) in Liverpool recently published a study, according to which potential energy gains from tidal power by the use of pumping process are “too optimistic”. Tidal energy is still in its emerging phase, so tidal range structures (barrages, lagoons, and offshore ti
Developers of the Eneco Luchterduinen offshore wind farm and RWE Innogy are testing a new and innovative metocean buoy that has been installed yesterday in the Dutch North Sea. The buoy has been deployed for a six month validation period nearby the already existing IJmuiden met-mast of RWE Innogy, s