Vestas has installed the nacelle of its V164-8MW offshore wind turbine at the Danish national test centre in Østerild, the company announced on its official social media page. Vestas is now following the footsteps of Siemens, which had put its SWT-6.0-154 offshore wind turbine to test in 2012 in Øst
HiDef Aerial Surveying Ltd has appointed Steve Burns to the role of Technical Director. Mr. Burns joined HiDef in March 2012, and takes his new post with immediate effect. In his new role, he will improve the effectiveness of technical processes at HiDef in addition to managing the development of ne
A body of senior business owners and directors in Wales have come together to form an independent industry advisory group focused on realising the commercial benefits of the proposed Swansea Bay Tidal Lagoon. Led by Roger Evans MBE, Managing Director of Schaeffler (UK) as Chair, the Wales Tidal Lago
Trident Energy has released White Paper on auxiliary power for offshore wind farms. Trident Energy has spotted an opportunity to reduce the risks and costs of providing offshore power. Offshore wind farms are being built in ever deeper, harsher waters. Diesel generators are used to provide power whe
The Water Power Program of the U.S. Department of Energy (DOE) recently issued a Notice of Intent for a funding opportunity expected to be posted early this year, pending congressional appropriations. The Notice of Intent, titled “Environmental Stewardship for Renewable Energy Technologies: Marine a
Fraunhofer IWES, in collaboration with industrial and research partners, is building a test stand which is to help in developing weatherproof coatings for rotor blade surfaces. Rotor blades are exposed to severe environmental conditions: rain, hail, sand, salty sea water and dirt all gather on the s
DNV Global Solutions Ltd has been contracted by the Carbon Trust to undertake a comparative study of lifted versus floated gravity base structures for offshore wind farms. The study involves cost assumptions of both the manufacturing/construction and the marine operations (transport and lowering/bal
The Carbon Trust awarded a contract to Ecofys UK Ltd on December 19 for Technology Delivery Consultant (HVAC Optimisation) Study. The study focuses on ways to optimise AC technology in relation to offshore wind farms. It includes consideration of matters such as the identification and review of issu
Scottish Enterprise (SE) has approval for up to £2,400,000 funding to invest in Marine Energy Array Cabling Solution Development. The Scottish Enterprise is calling for a competitive dialogue, where focus will be to produce practical solutions to the challenge of providing low-cost, safe and effecti
The main components for the LORC Nacelle Testing facility have started arriving at the site, following the completion of the foundation for the test facility, where LORC will test future offshore wind turbines with a power output of up to 10 MW. The 80-tonne heavy rotor – which is the rotating part
Horizon Survey Company and Pelydryn Ltd have announced that with effect from 1st December 2013 Horizon has acquired a controlling interest in Pelydryn. It is planned that the two companies will retain their individual identities and continue to operate independently. Where beneficial, Horizon and Pe
Reportbuyer.com has published a new market research report: Wind Power in India, Market Outlook to 2025, 2013 Update – Capacity, Generation, Levelized Cost of Energy (LCOE), Investment Trends, Regulations and Company Profiles. Wind Power in India, Market Outlook to 2025, 2013 Update – Capacity, Gene
The Crown Estate has invited developers interested in bringing forward renewable energy trading projects to provide details of their plans. The data provided will allow The Crown Estate, as managers of the UK seabed, to consider the spatial effect of possible cable infrastructure from proposed renew
GICON is currently developing a load-bearing floating structure for offshore wind turbines, the GICON® SOF (Schwimmendes Offshore Fundament = German for ‘Floating Offshore Foundation’). A key development milestone was passed in February 2012 when wave and tow tests of a 1:25 scale model were conduct