
A geotechnical seabed survey has started at the project site of Ørsted’s Mooir Vannin Offshore Wind Farm in the Isle of Man’s territorial waters. Ørsted has commissioned GEO to carry out the work six to twelve nautical miles off the coast of Maughold, the area for lease granted to the Danish offshor

The Reduced Commercial Risks with Demo of 15+ MW (RECORD15) joint industry project, which aims to install a latest generation turbine with a rated power over 15 MW on Ocergy’s floating platform in 2028, has been launched. The Front-End Engineering Design (FEED) contract for this pilot project was re
