Ampelmann has been awarded a contract by Eidesvik to deliver an Ampelmann E-type for the Viking Neptun, currently serving as an accommodation and a crew transfer vessel (CTV) on the Wikinger offshore wind farm.
DNV GL has published a position paper on artificial intelligence (AI) in solar and wind energy industries, saying AI will increasingly automate operations over the next several years and boost efficiencies across the renewable energy sector.
Nexans has opened a new high voltage test laboratory at its Calais Center of Excellence in France, making it fully operational with the capacity to test cable systems up to 1.5 million volts.
Great Yarmouth-based ATAM Group has tested its robotic crawler, developed for the inspection of wind turbine blades, on the full-size turbine training tower and along test blades at ORE Catapult’s facilities in Northumberland, which is offered as part of a GBP 50,000 grant awarded to ATAM from the G
Lloyd’s Register (LR) has assessed Fistuca’s BLUE Hammer technology showing that it has the potential to produce “far less” underwater noise during the installation of offshore wind foundations compared to hydraulic hammers.
Deutsche WindGuard Wind Tunnel Services has developed a special wind tunnel for LiDAR Calibration on behalf of the National Metrology Institute of Germany (Physikalisch-Technische Bundesanstalt – PTB).
Innovate UK has awarded GBP 1.2 million to a consortium developing a surface inspection system for offshore wind turbines using drones. The consortium is led by Perceptual Robotics, a company based at the Bristol Robotics Laboratory (BRL), and Bristol University’s Visual Information Lab, who have pa
VBMS and Kintech Energy Ltd. have jointly developed a resin-free hang-off solution for fixing and sealing subsea cables in offshore structures which could potentially be used on the Horns Rev 3 wind farm off Denmark.
MMT has begun the offshore geophysical survey of the proposed cable corridor between the landfall areas near Portsmouth, England, and Dieppe, France, for the Aquind Interconnector project.
Monopile foundations are the best option for next generation turbines because they are the most cost-effective solution in the market, Michel Kurstjens, Chief Commercial Officer of Sif Group, said.
Providing offshore wind developers with the best modelling data possible in the early stages of project development translates into significant cost reductions, according to Dr. Thor Ugelvig Petersen, Head of Department Ports & Offshore Technology at DHI Group.
Subsea Technology & Rentals Ltd (STR) and SENSYS have established a partnership for providing STR’s global offshore energy customer base with access to SENSYS’ unexploded ordnance (UXO) detection system.
Goldwind will install a prototype of its GW154/6.7MW offshore wind turbine in early 2018 and plans the turbine’s commercial deployment to take place during the first quarter of 2018, after it launched the GW6S platform in October.
Inch Cape Offshore Limited (ICOL) has used a 3D model created by SLR to communicate plans for the proposed 784MW Inch Cape offshore wind farm off the coast of Angus, Scotland.