offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Wind Farm Update

Loading filters...
Grid ConnectionContracts & TendersAuthoritiesR&DBusiness & FinanceVessels
Vineyard-Wind-Seals-Transmission-Deal
Wind Farm Update

Vineyard Wind Seals Transmission Deal

Vineyard Wind has reached a transmission agreement with ISO New England (ISO-NE) for its 800 MW Vineyard Wind 1 offshore wind project in Massachusetts. The agreement allows the 800 MW wind farm to connect its generation into the New England electric power grid at the NSTAR 115kV switch station in Ba

about 5 years ago
Thor Wind Turbine
Wind Farm Update

Phase 2 of China’s First Foreign-Backed Offshore Wind Farm Enters Construction

EDF Group and China Energy Investment Corporation (CEI) have kicked off the construction of the 200 MW Dongtai V offshore wind project in China. The project is the second phase of the 500 MW Jiangsu Dongtai wind farm, the first offshore wind project in China built in collaboration with a foreign inv

about 5 years ago
SG 11.0-200 DD
Wind Farm Update

Waves Group Joins Hollandse Kust Zuid Team

Offshore marine and engineering consultancy company Waves Group has won the Marine Warranty Surveyor (MWS) contract on the 1.5 GW Hollandse Kust Zuid wind farm in the Dutch North Sea. Owned and developed by Vattenfall, the wind farm will comprise 140 Siemens Gamesa 11 MW wind turbines which will be

about 5 years ago
Thor Wind Turbine
Wind Farm Update

Ørsted Says Offshore Project Delays in US Highly Likely

Leading offshore wind developer Ørsted said that the construction of several U.S. projects is now highly likely to be pushed back due to delays in the permitting procedures. Ørsted’s CEO Henrik Poulsen said that the company is still waiting for the Bureau of Ocean Energy Management (BOEM) to decide

about 5 years ago
Thor Wind Turbine
Wind Farm Update

Trelleborg Cable Protection for 1.5 GW Dutch Offshore Wind Farm

Trelleborg has secured a contract by Seaway 7 to provide its NjordGuard cable protection for Vattenfall’s Hollandse Kust Zuid offshore wind project in the Netherlands. The company will provide 281 NjordGuard cable protection systems for the inter-array power cables for 140 turbines, as well as the a

about 5 years ago
Thor Wind Turbine
Wind Farm Update

GDG Provides Concept Foundation Design for Vietnamese Offshore Wind Project

Gavin and Doherty Geosolutions (GDG) is undertaking the concept foundation design for the first 200 MW of Phase 1 of the Phu Cuong Soc Trang offshore wind farm in Vietnam. As part of the study, GDG said it had undertaken an initial foundation screening and option assessment, followed by a more detai

about 5 years ago
Thor Wind Turbine
Wind Farm Update

ASM Industries Starts Making Windpark Fryslân Tower Sections

ASM Industries has begun the fabrication of 42 tower sections for the Siemens Gamesa turbines destined for the Windpark Fryslân offshore wind project. The fabrication activities began in September and will be taking place at ASM Offshore in Aveiro Port during the next months. “This is a very importa

about 5 years ago
Moray East Turbine Jackets Halfway There
Wind Farm Update

Moray East Turbine Jackets Halfway There

50 out of 100 wind turbine jacket foundations have been installed at the Moray East wind farm offshore Scotland. Chartered by DEME Group, the jack-up vessel Seajacks Scylla installed the wind farm’s 50th turbine jacket foundation at the site some 22 kilometres off the Aberdeenshire coast on Monday,

about 5 years ago
Thor Wind Turbine
Wind Farm Update

Largest Dutch Offshore Wind Farm Nears Full Commissioning

The 752 MW Borssele 1 and 2 offshore wind farm is nearly fully commissioned with the last of the turbines currently undergoing tests before they start feeding the electricity to the Dutch grid. Once fully commissioned, the 94-turbine wind farm will surpass the 600 MW Gemini to become the largest ope

about 5 years ago
Awel y Môr Completes First Seabed Study
Wind Farm Update

Awel y Môr Completes First Seabed Study

The RWE-led Awel y Môr offshore wind farm has completed its first offshore geophysical exploratory works with Fugro GB Marine Ltd taking the helm. As part of the development of the Awel y Môr wind farm offshore Wales, studies of the seafloor have to be carried out. These in turn will help inform the

about 5 years ago
Cable Route Survey Underway at Vineyard Wind Site
Wind Farm Update

Cable Route Survey Underway at Vineyard Wind Site

Vineyard Wind has partnered with Woods Hole Group to carry out current and tidal monitoring at its planned 800 MW offshore wind project in Massachusetts. The parties deployed the current measuring and turbidity monitoring devices along the project’s export cable corridor to gain insight and data tha

about 5 years ago
Pacific Orca at sea installing foundations
Wind Farm Update

Pacific Orca Officially Ready for Hornsea Two OWF

Cadeler, formerly known as Swire Blue Ocean, is ready to send its Pacific Orca vessel in early 2021 to support foundation installation at the Hornsea Two offshore wind farm in the UK. The company has been subcontracted by DEME to deliver a vessel which will support the installation of the wind farm’

about 5 years ago
An offshore wind farm with a wind turbine shadow on the water surface
Wind Farm Update

Ørsted and Eversource File Bid for Sunrise Wind 2 OWF in New York

Ørsted and Eversource have placed a joint bid for a new offshore wind project in New York, named Sunrise Wind 2, in the state’s second offshore wind solicitation. The developers filed multiple proposals for the project with the New York State Energy Research and Development Authority (NYSERDA) on 20

about 5 years ago
Trelleborg to Shield Kaskasi Cables
Wind Farm Update

Trelleborg to Shield Kaskasi Cables

Trelleborg has secured a contract by Seaway 7 to provide its NjordGuard cable protection for the Kaskasi offshore wind project in Germany. Trelleborg will provide 86 integrated cable protection systems to protect the inter-array grid power cables from over-bending, abrasion, and fatigue. Production

about 5 years ago
  • 1
  • …
  • 264
  • 265
  • 266
  • …
  • 640