
Ørsted plans to launch a rights issue with pre-emptive rights for existing shareholders to raise DKK 60 billion (around EUR 8 billion) in gross proceeds, most of which will go to funding the construction of the Sunrise Wind offshore wind project in the US, which the company cannot partially divest a

The offshore substation for the Taipower Offshore Wind Project Phase II (TPC Phase II) has been installed at the site in Taiwan. The topside, which left Vietnam in July, was placed on top of its jacket foundation by Shinfox Far East Energy’s SFE Hercules. The launching ceremony for the offshore subs

The completion date for Vattenfall and Copenhagen Infrastructure Partners’ offshore wind farm at the IJmuiden Ver Beta site in the Netherlands has been pushed from late 2029 to 2032 due to the delayed completion of the Delta Rhine Corridor (DRC). In addition, the 2 GW offshore wind project will now

Five of the 76 planned Vestas V236-15.0 MW turbines have been installed at Baltic Power, the first Polish offshore wind farm, jointly developed by Orlen and Canada’s Northland Power. The installation of each turbine is preceded by the deployment of monopile foundations and transition pieces, a stage

The Export and Investment Fund of Denmark (EIFO) is providing a GBP 500 million (approximately EUR 576 million) finance guarantee to support the development of ScottishPower Renewables’ East Anglia Three offshore wind farm in the UK. EIFO was invited exclusively by Iberdrola to participate in the of

The 100 MW White Cross floating offshore wind farm, developed by Flotation Energy and Cobra, has been granted full onshore and offshore planning approval. The project submitted an application to the North Devon Council and the Marine Management Organisation (MMO) in 2023 to construct and operate a f

The consortium of Navantia Seanergies and Windar Renovables has delivered the last monopiles to Iberdrola for the 315 MW Windanker offshore wind farm in the German Baltic Sea. The monopile foundations have been produced at the factory that both companies operate jointly at the Navantia Seanergies sh

Buhawind Energy Northern Luzon Corporation has secured the facilities study (FS) approval from the National Grid Corporation of the Philippines (NGCP) for its 2 GW Northern Luzon floating offshore wind project. The study outlines the critical technical requirements necessary for the integration of t

Glamox has won contracts to light the turbine foundation transition pieces for the 495 MW Fengmiao 1 offshore wind farm in Taiwan, being developed by Copenhagen Offshore Partners (COP) on behalf of Copenhagen Infrastructure Partners (CIP). Glamox will provide approximately 920 marine-certified LED l

The developers of the Vineyard Wind 1 offshore wind farm in the US have completed the integration of all installed GE Haliade-X 13 MW turbines into its Aircraft Detection Lighting System (ADLS). The system activates the FAA-required lighting only when planes are within a specified distance of wind t

Spain’s Haizea Wind Group has rolled out the first monopile for Ørsted’s 2.9 GW Hornsea 3 offshore wind farm in the UK. The monopile will now undergo its surface treatment before being shipped to the offshore wind farm project, located approximately 120 kilometres off the Norfolk Coast in the North

The offshore jacket foundation and substation platform have been installed at the Inch Cape offshore wind farm site in the North Sea. The Siemens Energy Offshore Transformer Module (OTM) and its 68-metre jacket foundation are now in position 21 kilometres from the Angus coast, Scotland, having been

Grupa Przemysłowa Baltic has started the fabrication of secondary steel elements for the 1.5 GW Baltica 2 offshore wind farm in the Polish Baltic Sea. The first sheet of metal was cut at the former Gdańsk Shipyard and at the Energomontaż-Północ Gdynia S.A. plant to begin construction of mooring stru

The Scottish government has granted a consent order for SSE Renewables’ Berwick Bank in the UK, which, if fully developed, would become the world’s largest offshore wind farm. The Section 36 consent determination by Scottish ministers approves the project’s main offshore wind array in the outer Firt