offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Wind Farm Update

Loading filters...
AuthoritiesContracts & TendersGrid ConnectionBusiness & FinanceOperations & MaintenanceTechnologyPorts & Logistics
Highland Council to Object to Moray West Project?
Wind Farm Update

Highland Council to Object to Moray West Project?

Highland Council’s North Planning Applications Committee has recommended that the Council raises an objection to the Moray West offshore wind farm, located next to the Moray East and Beatrice offshore wind farms.

about 7 years ago
Ofgem Names Galloper OFTO
Wind Farm Update

Ofgem Names Galloper OFTO

Ofgem has selected Diamond Transmission Partners as the preferred bidder to own and operate the high voltage transmission link to the Galloper offshore wind farm in the UK.

about 7 years ago
Seagreen Confirms CfD Round 3 Bid
Wind Farm Update

Seagreen Confirms CfD Round 3 Bid

The 1.5GW Seagreen Phase 1 offshore wind project is entering into May 2019’s Contracts for Difference (CfD) auctions, SSE plc, the owner and developer of the project in Scotland, said.

about 7 years ago
Lankhorst Dyneema Tethers WindFloat Atlantic
Wind Farm Update

Lankhorst Dyneema Tethers WindFloat Atlantic

The 25MW WindFloat Atlantic floating project in Portugal has used the first ever Lankhorst Dyneema DM20 mooring tethers.

about 7 years ago
EDS Completes Teesside OLTC Maintenance
Wind Farm Update

EDS Completes Teesside OLTC Maintenance

High voltage engineering specialist EDS HV Group has completed on-load tap changer (OLTC) maintenance work on EDF Renewables’ 66kV/33kV generator transformers at Teesside offshore wind farm.

about 7 years ago
Inch Cape Picks NKT and Boskalis for Export Cable Work
Wind Farm Update

Inch Cape Picks NKT and Boskalis for Export Cable Work

The consortium of NKT and Boskalis Subsea Cables & Flexibles has signed a Pre-Construction Agreement (PCA) for the delivery and installation of an export cable system for the 784MW Inch Cape offshore wind project in the UK.

about 7 years ago
Nexans Joins Hornsea Two Cable Supply Roster
Wind Farm Update

Nexans Joins Hornsea Two Cable Supply Roster

French cable maker Nexans has won a contract to provide a subsea export cable system for the nearshore section of Ørsted’s 1.4GW Hornsea Project Two offshore wind farm in the UK. The contract is worth over EUR 150 million and will see Nexans supplying 200 kilometres of the 245 kV high voltage altern

about 7 years ago
Construction Begins on Galloper O&M Base
Wind Farm Update

Construction Begins on Galloper O&M Base

The construction of the operations and maintenance (O&M) base for the 353MW Galloper offshore wind farm has started in Harwich, UK.

about 7 years ago
EDPR Sells More Moray East Stake
Wind Farm Update

EDPR Sells More Moray East Stake

EDP Renováveis has, through its subsidiary EDPR UK Limited, closed the sale of a 13.4% stake in equity shareholding and outstanding shareholder loans on Moray Offshore Windfarm (East) Limited to Diamond Generating Europe Limited.

about 7 years ago
SBM Offshore Floater Ready for French Wind Farm
Wind Farm Update

SBM Offshore Floater Ready for French Wind Farm

SBM Offshore’s wind floater design, including its mooring system and featuring a commercially available offshore wind turbine, has been granted an Approval in Principle (AIP) by classification society American Bureau of Shipping (ABS).

about 7 years ago
SSE Restarts Arklow Bank Geotechnical Survey Tender
Wind Farm Update

SSE Restarts Arklow Bank Geotechnical Survey Tender

SSE has re-issued a contract notice for offshore and nearshore geotechnical survey works at the Arklow Bank offshore wind farm in the Irish Sea.

about 7 years ago
Trianel Windpark Borkum II Turbine Towers Start Rolling Into Buss Terminal Eemshaven
Wind Farm Update

Trianel Windpark Borkum II Turbine Towers Start Rolling Into Buss Terminal Eemshaven

The Buss Terminal Eemshaven has received the first shipment of wind turbine tower sections for the Trianel Windpark Borkum II offshore wind project.

about 7 years ago
Feed-In-Tariffs In Place for Six French Offshore Wind Farms
Wind Farm Update

Feed-In-Tariffs In Place for Six French Offshore Wind Farms

France’s Minister of Ecology François de Rugy has signed the letters approving re-negotiated feed-in-tariffs for six offshore wind projects selected in the country’s first two tendering rounds.

about 7 years ago
France Launches Dunkerque Offshore Wind Tender
Wind Farm Update

France Launches Dunkerque Offshore Wind Tender

Following a delay of several months, France has launched a tender for the development and operation of a wind farm offshore Dunkerque.

about 7 years ago
  • 1
  • …
  • 353
  • 354
  • 355
  • …
  • 640