offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Fixed-Bottom

Loading filters...
Business developmentProject UpdatesResearch & DevelopmentWind Farm UpdateAuthoritiesBusiness & FinanceFloating WindPlanning & PermittingContracts & TendersSupply ChainFoundationsVesselsEquipmentGrid ConnectionEnergy IslandsEnvironmentGreen HydrogenInfrastructureInnovationManufacturingOff-GridOperations & MaintenanceOutlook & StrategyPorts & LogisticsPower-to-XTechnologyTransitionWind Turbines
Tahkoluoto, Finland's first commercial offshore wind farm.
Fixed-Bottom

Tahkoluoto Offshore Cancels Demo Project, Moves Forward with Full-Scale Development in Finland

Tahkoluoto Offshore Oy, the developer of the Tahkoluoto offshore wind farm extension project in Finland, has scrapped plans for a demonstration project that involved the installation of two 15 MW wind turbines. The purpose of the demo phase was to pilot large-scale offshore wind turbines, foundation

about 1 year ago
Will Trump Venture to Impose ‘No New (Offshore) Wind Turbines’ Policy and Bring US Industry Supporting 120,000 Jobs to Halt?
Fixed-Bottom

Will Trump Venture to Impose ‘No New (Offshore) Wind Turbines’ Policy and Bring US Industry Supporting 120,000 Jobs to Halt?

During his presidential campaign in 2024, Donald Trump said he would sign an executive order to stop offshore wind farms from being built in the US “on day one”. On 7 January, the US president-elect reiterated the plan which now seems to apply to wind energy on land too, saying he would look into im

about 1 year ago
Vattenfall Finland
Fixed-Bottom

ABL Secures Work on Metsähallitus and Vattenfall Finnish Offshore Wind Farm

ABL has been awarded a contract to provide a shipping study to identify and evaluate navigational risks associated with the Korsnäs offshore wind farm in Finland, being developed by Vattenfall and Metsähallitus. ABL’s scope of work includes a comprehensive navigational risk assessment, including qua

about 1 year ago
Baltic 2
Fixed-Bottom

Vårgrønn Takes Over Dutch Pension Fund’s Stake in 288 MW German Offshore Wind Farm

Vårgrønn, a joint venture between Plenitude and Norway’s HitecVision, has acquired 100 per cent of PGGM Infrastructure Fund’s shares in the 288 MW Baltic 2 offshore wind farm in Germany. The German energy company EnBW owns 50.1 per cent and Vårgrønn holds 27.4 per cent of the Baltic 2 offshore wind

about 1 year ago
AFRY Bags Offshore Wind Farm Design Contract in Estonia
Fixed-Bottom

AFRY Bags Offshore Wind Farm Design Contract in Estonia

AFRY Netherlands has won a contract worth over EUR 3 million for offshore wind farm design in Estonia at a tender launched by Enefit Green for its Liivi project in the Gulf of Riga. The contract, signed on 6 January, according to a public tender award notice, involves preparing a Contract for Differ

about 1 year ago
A photo of the LiDAR buoy deployed in waters off Ocean City
Fixed-Bottom

Delaware, US Wind Sign USD 128 Million Worth of Agreements

Delaware Governor John Carney and officials from the state’s Department of Natural Resources and Environmental Control (DNREC) have signed three agreements valued at more than USD 128 million (approximately EUR 123 million) with US Wind, which recently received federal approval for its Maryland offs

about 1 year ago
Norther offshore wind farm with Vestas wind turbines
Fixed-Bottom

KOEN Exiting South Korean Project as Proposed Offshore Wind Farm Did Not Pass Gov’t Feasibility Study

Korea South-East Power (KOEN), a subsidiary of Korea Electric Power Corporation (KEPCO), is withdrawing from the Shinan Ui (Sinan Ui) offshore wind project after the proposed wind farm did not pass the government’s feasibility assessment. According to Seoul Economic Daily, in August 2024, the prelim

about 1 year ago
Trump Calls On UK to ‘Get Rid’ of Offshore Wind Farms in Favour of Oil & Gas; Gets Invited to Hull
Fixed-Bottom

Trump Calls On UK to ‘Get Rid’ of Offshore Wind Farms in Favour of Oil & Gas; Gets Invited to Hull

Donald Trump has urged the UK government to “get rid of windmills” in the North Sea and open it up for oil & gas, which earned the US president-elect an open invitation from Humber Marine and Renewables, a UK regional industry organisation, to visit Hull and witness the effects of offshore wind on t

about 1 year ago
A photo of Erhang Changqing pile driving vessel in the water
Fixed-Bottom

‘World’s Largest’ Piling Vessel Delivered in China

Shanghai Zhenhua Heavy Industries (ZPMC) has delivered a new piling vessel to China Communications Construction Corporation (CCCC), which plans to use it for deep-sea bridge and offshore wind farm construction. The vessel, named Erhang Changqing and delivered on 5 January, was developed by CCCC Seco

about 1 year ago
Leading Light Wind Requests Another Delay Due to Equipment Challenges
Fixed-Bottom

Leading Light Wind Requests Another Delay Due to Equipment Challenges

The developer of the 2.4 GW Leading Light Wind project off the coast of New Jersey, the US, is requesting an additional delay for the project’s contract due to difficulties in securing essential equipment. Leading Light Wind, developed by Invenergy and its partner energyRe, already received one paus

about 1 year ago
UK, Netherlands to Connect Grids via Nederwiek 3 Offshore Wind Farm
Fixed-Bottom

UK, Netherlands to Connect Grids via Nederwiek 3 Offshore Wind Farm

Dutch Climate and Green Growth Minister Sophie Hermans has included LionLink, said to be the first direct-current hybrid interconnector, in the country’s latest Offshore Wind Energy Development Framework. LionLink will use the offshore grid connection of the Nederwiek 3 offshore wind farm in the Net

about 1 year ago
Dogger Bank A final TP
Fixed-Bottom

Two Monopiles to Go at Dogger Bank B Offshore Wind Farm

The offshore installation vessel Seaway Strashnov has installed all but two monopile foundations at the Dogger Bank B offshore wind site in the UK and will return in the second quarter of 2025 to complete the installation. Five more transition pieces (TPs) are also left to be installed, according to

about 1 year ago
Equinor Secures USD 3 Billion for New York City’s First Offshore Wind Farm
Fixed-Bottom

Equinor Secures USD 3 Billion for New York City’s First Offshore Wind Farm

Equinor has secured a project financing package of over USD 3 billion (approximately EUR 2.9 billion) and reached financial close on Empire Wind 1, the first offshore wind farm to connect to New York City’s grid, which is already under construction after Equinor made a final investment decision (FID

about 1 year ago
Editors’ Picks | Offshore Wind News in 2024: ‘The First, The Largest, The Record’
Fixed-Bottom

Editors’ Picks | Offshore Wind News in 2024: ‘The First, The Largest, The Record’

Some news are important for the offshore wind industry at large, some are significant for parts of the supply chain or in certain regions, and some are just good to know. With 366 days and thousands of news in 2024 behind us, the task of choosing only a few stories was not an easy one […]

about 1 year ago
  • 1
  • …
  • 58
  • 59
  • 60
  • …
  • 115