On 21 November, Belgian transmission system operator Elia officially inaugurated the Stevin high-voltage line which will, i.a., transport the wind energy generated offshore to the mainland via the connection to the Modular Offshore Grid (MOG).
Parkwind has issued a tender seeking companies to design, build, install and commission the offshore high voltage substation (OHVS) for its Northwester 2 wind farm in the Belgian North Sea.
TenneT is looking for a contractor who will carry out horizontal directional drilling (HDD) works for the connection of the Hollandse Kust Zuid wind farm area.
Ørsted has invited comments on the proposed modifications to the onshore and offshore export cable corridor for the Hornsea Project Three wind farm located some 120 kilometres off the north Norfolk coast, UK.
VBMS and Kintech Energy Ltd. have jointly developed a resin-free hang-off solution for fixing and sealing subsea cables in offshore structures which could potentially be used on the Horns Rev 3 wind farm off Denmark.
MMT has begun the offshore geophysical survey of the proposed cable corridor between the landfall areas near Portsmouth, England, and Dieppe, France, for the Aquind Interconnector project.
Belgian offshore wind developer Otary has issued a tender for engineering, procurement, construction, and installation (EPCI) of high voltage substations on the Seastar and the Mermaid offshore wind farms.
NKT has signed a Preferred Bidder Agreement (PBA) with Moray East Offshore Windfarm Ltd for delivery and installation of export cable systems for the prospective 950MW Moray East wind farm off Scotland.
Ørsted, former DONG Energy, has issued a tender for cable lay ship services at offshore wind farms in the Dutch North Sea.
The first subsea section of the 325-kilometre-long Cobra cable interconnector between Denmark and the Netherlands has made landfall on the Danish island of Fanø, Energinet reports.
Moray Offshore Windfarm (East) Ltd and Siemens have signed a Preferred Bidder Agreement (PBA) for the onshore works, and offshore substation platform topsides for the 950MW Moray East offshore wind farm.
Denmark’s Energinet and UK-based National Grid have issued a tender for the provision of unexploded ordnance (UXO) client representative services on the Viking Link interconnector project.
Vos Prodect Innovations has won a contract by TKF (Twentsche Kabelfabriek) for the design and supply of sealed inter-array cable hang-off systems for the 497MW Hohe See offshore wind farm project located in the German North Sea.
U.S. offshore wind developer Vineyard Wind will host two open houses in Yarmouth and Barnstable to inform residents about the grid connection plans for the proposed wind farm to be built offshore Massachusetts.