offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Grid Connection

Loading filters...
Operations & MaintenanceWind Farm UpdateBusiness & FinanceEnvironmentVesselsR&DTechnologyAuthorities
DolWin2 Disconnected Due to Repair Work
Grid Connection

DolWin2 Disconnected Due to Repair Work

During the test phase of the DolWin2 offshore grid connection, a cable component had failed repeatedly and TenneT decided to power off the system and has asked ABB to address the issue. The companies will now investigate whether an individual case or a systemic material error is in question, and the

about 10 years ago
VIDEO: Export Cable Pull In at Burbo Bank Extension
Grid Connection

VIDEO: Export Cable Pull In at Burbo Bank Extension

The export cable at the Burbo Bank Extension offshore wind farm has been pulled in. The cable was floated ashore on pillow floats to a small jack up barge then pulled through the tidal and connected to a winch for the final 760-metre pull through a HDD that had been installed 12 months ago, accordin

about 10 years ago
VBMS Wraps Up Sandbank OWF Wiring
Grid Connection

VBMS Wraps Up Sandbank OWF Wiring

VBMS has completed cable installation and post-lay burial work at Vattenfall’s 288MW Sandbank offshore wind farm, situated in the German Bight. The company installed a total of 76 inter-array cables within approximately two and a half months. VBMS deployed its multipurpose vessels Ndurance and Ndeav

about 10 years ago
Bard Offshore 1 Clocks Up 3 TWh of Generated Power
Grid Connection

Bard Offshore 1 Clocks Up 3 TWh of Generated Power

Bard Offshore 1 marked another first for German offshore wind farms after recently generating 3 TWh of electricity since first starting to produce power in 2013. The wind farm has generated 1 TWh of electricity since November 2015, when Ocean Breeze Energy announced the wind farm reaching the 2 TWh

about 10 years ago
Block Island Mainland Link to Make Landfall Within Days
Grid Connection

Block Island Mainland Link to Make Landfall Within Days

The 20-mile submarine cable which will connect US mainland to Block Island and export the electricity generated by the 30MW Block Island offshore wind wind farm, is expected to make landfall at Crescent Beach, Block Island, in the next week or so, depending on the weather. The cable laying barge Big

about 10 years ago
DNV GL Ventures Into Vietnam for Nearshore Wind Farm Feasibility Study
Grid Connection

DNV GL Ventures Into Vietnam for Nearshore Wind Farm Feasibility Study

DNV GL Americas has entered into a contract with Phu Cuong Group (PCG) to deliver a feasibility study for a USD 435 million, 170MW Phu Cuong 1 nearshore wind farm project, the first in PCG’s planned series of similar projects along Vietnam’s southern coastline in Soc Trang province. PCG, a private f

about 10 years ago
VBMS Wins Horns Rev 3 Inter-Array Cable Installation Contract
Grid Connection

VBMS Wins Horns Rev 3 Inter-Array Cable Installation Contract

VBMS has been awarded a contract by Vattenfall Vindkraft A/S for the installation of 33kV inter-array cables for the 400MW Horns Rev 3 offshore wind farm. The wind farm is located in the eastern North Sea off the coast of Esbjerg, Denmark. The works for VBMS are scheduled to be executed mid-2018 and

about 10 years ago
Humber Gateway Tops Expectations
Grid Connection

Humber Gateway Tops Expectations

The 219MW Humber Gateway offshore wind farm generated 854,400 MWh of electricity in its first full year of generation, E.ON reports. The wind farm’s 73 turbines moved into full operation in May 2015, and the site was officially opened by Energy Minster Andrea Leadsom MP in September. The figures are

about 10 years ago
GCube: Most Financial Losses Are Down to the Subsea Wire
Grid Connection

GCube: Most Financial Losses Are Down to the Subsea Wire

Incidents relating to the installation and operation of high voltage subsea cables are the most costly cause of financial losses in the global offshore wind industry and led to insurance claims totalling more than EUR 60 million in 2015, according to a report by GCube Underwriting Ltd. As the Europe

about 10 years ago
MMT to Examine COBRAcable Route
Grid Connection

MMT to Examine COBRAcable Route

Prysmian has awarded MMT with a cable route survey contract for the COBRAcable, a subsea HVDC interconnector that will link the Dutch and Danish power grids. MMT will start working on the project this July, and will carry out the surveys with its own ROTV, ROV & survey vessels Franklin, Seabeam and

about 10 years ago
Top News of the Week, 6 – 12 June 2016
Grid Connection

Top News of the Week, 6 – 12 June 2016

TenneT Presents ‘Hub and Spoke’ Offshore Wind Concept (VIDEO) TenneT has presented a ‘hub and spoke’ concept to set up a large European offshore electricity system that incorporates building of an island in the middle of the North Sea. Van Oord, Highland Group Team Up for Deutsche Bucht OWF Van Oord

about 10 years ago
NDE Offshore Inspecting HVDC Platform Helidecks in North Sea
Grid Connection

NDE Offshore Inspecting HVDC Platform Helidecks in North Sea

NDE Offshore AB has recently been awarded a contract by Siemens to conduct periodic inspections of the helidecks on three offshore HVDC platforms in the North Sea. The grid connections are owned by German-Dutch transmission grid operator TenneT. Already completed is the Helwin1 platform, where inspe

about 10 years ago
Dragados Offshore Cracks Offshore Wind Market with Hornsea Project 1 Jackets
Grid Connection

Dragados Offshore Cracks Offshore Wind Market with Hornsea Project 1 Jackets

DONG Energy has awarded Dragados Offshore, a Spanish engineering, procurement, and construction (EPC) contractor and a part of the ACS Group, with a contract to deliver four substation jackets for the 1.2GW Hornsea Project One offshore wind farm in the UK. The scope of work awarded to Dragados Offsh

about 10 years ago
Energinet.dk Seeks Marine Warranty Surveyor for Kriegers Flak Projects
Grid Connection

Energinet.dk Seeks Marine Warranty Surveyor for Kriegers Flak Projects

Danish transmission systems operator Energinet.dk has invited tenders for a marine warranty surveyor for its Kriegers Flak AC and Combined Grid Solution (CGS) projects. Energinet.dk wants to purchase marine warranty services to ensure that marine operations carried out by sub-contractors are perform

about 10 years ago
  • 1
  • …
  • 178
  • 179
  • 180
  • …
  • 276