RenewableUK today highlighted the announcement that the next stage of the giant Dogger Bank offshore wind farm in the North Sea has gained planning consent from the Energy Secretary Amber Rudd. The Teesside project is equal in size to the world’s largest previously consented project, Dogger Bank Cre
According to the International Energy Agency (IEA), energy demand will rise by almost 40 percent in 2040. But at the same time, the energy industry faces challenges with a changing climate which requires a drastic reduction of greenhouse gas emissions. So, it’s no surprise that renewable energy will
DolWin beta platform sailed out on Aug 1, 2015 from Haugesund, Norway on its way to the German North Sea. It will house the converter station for the DolWin2 HVDC link, of which ABB is in charge. The link will have the capacity to transmit 916 megawatts (MW) of clean power into the German grid. DolW
Eneco Says It Will no Longer Invest in Renewables Dutch energy company, Eneco, said it will no longer invest in renewable energy projects since that is not possible without losing money and jobs, the Dutch media reported. France Ready to Issue Floating Wind Call for Tenders French wind industry grou
German company Convent Offshore GmbH has opened an office in London, in order to optimize its services for the UK market. This will allow for a personal and timely service to the customers who are engaged in the British market, the company said. Thorben Schiborowski, CEO of Convent Offshore GmbH, ex
Formosa 1 In June Siemens signed a Turbine Supply Agreement with Formosa Wind Power Co. Ltd., a subsidiary of Swancor Enterprise and the developer of what could be Taiwan’s first offshore wind farm, the 128MW Formosa 1 offshore wind demonstration project. Formosa 1 is located 3 to 6km off Miaoli cou
Seajacks Scylla Scheduled for Veja Mate Offshore WindForce, a joint venture between Royal Boskalis Westminster N.V. and Volker Stevin International (VolkerWessels), has awarded Seajacks UK Limited the contract to provide the Seajacks Scylla, for the transport and installation of 67 monopiles at the
Following the commencement of Block Island offshore wind farm construction, the developer was struck by a hazard. Namely, one of the barges being used during the construction hit the installed jacket foundation making a dent in one of four legs, writes The Providence Journal. “This is the kind of th
Senvion installed wind turbines with a total capacity of over 285 megawatts (MW) in the first six months of the calendar year 2015 in Germany. With the installation of exactly 100 turbines in the period from January 2015 to June 2015, Senvion is the second largest manufacturer of wind turbines in Ge
Earlier this week Grimsby Renewables Partnership was officially launched with an aim to connect offshore wind farm operators with local businesses. This will help the local economy while reducing the cost of green energy, writes Grimsby Telegraph. More than 200 people gathered at Grimsby Town Hall t
Capital & Centric is under construction with 20,599 sq ft (1,914sq m) of office and warehouse accommodation, including laboratory, research and development space. The accommodation, known as Lightbox, located on Abbey Street in Birkenhead, is targeted towards small to medium sized enterprises within
The Department of Energy and Climate Change has published its key annual Digest of UK Energy Statistics covering 2014. Electricity generated from renewable sources increased by 21% in 2014 compared to the previous year, and accounted for 19.1% of total UK electricity generation (up from 14.9% in 201
The European Union Research and Innovation Programme HORIZON 2020, selects Modular INNODRIVE project of INNOVO for its programme. INNOVO pushed again technology beyond its limits implementing the Modular Reel Drive System “Modular INNODRIVE” for the SURF Business. The Modular INNODRIVE technology br
In the first six months of 2015, the European offshore wind industry installed more new capacity than in any other year on record as several projects reached completion and deployment of larger turbines increased. Installations in the first half of 2015 touched 2,342.9MW – tripling the grid-connecte