Nordic Yards company has presented a new type of vessel on Thursday at the “Wind & Maritime” conference in Rostock, the Ostsee-zeitung reported. It is “a wind farm construction vessel of the second generation,” said Olaf Wunderlich (49), Deputy Managing Director of Nordic Yards Holding GmbH. So far,
P&O Maritime is currently chartering the third of its purpose built Crew Transfer Vessels the Chinook to Statoil — Scira on Sheringham Shoal. Delivered in February 2012, the Chinook will provide crew and equipment transfers on Sheringham Shoal until Q3 2012. The successful delivery of this contract
On Wednesday 30th May Alicat Workboats held a naming ceremony for the third London Array Crew transfer vessel. A competition was run to name the vessel and this was won by an eight-year-old Thanet schoolgirl , as part of her prize she won a VIP family break and £500 for her school. Cerys Jones, who
MPI Offshore’s new generation of offshore wind turbine installation vessels are expanding the envelope of the renewables industry, taking it into deeper water and harsher environments. With a new generation of offshore windfarms under construction in more remote locations and harsher environments, M
Deputy Secretary of the Interior David J. Hayes met with senior federal and state officials in Anchorage to ensure the continuing coordination of federal responsibilities related to energy permitting in Alaska. The visit was part of President Obama’s all-of-the-above energy strategy to safely and re
Ormazabal will take part from 3 to 6 of June in the AWEA WINDPOWER fair in Atlanta, Georgia (USA), at stand #5401. The company will present all of its novelties related to wind farm distribution network solutions. Also, it will showcase an example of the CGM.3 system secondary distribution switchgea
Cost calculation will be easier now with an online tool developed by the European Wind Energy Association which instantly calculates electricity costs, allowing users to type in their assumptions on prices. Furthermore, the calculator includes any fuel and carbon risks for gas, coal, nuclear, onshor
HGO InfraSea Solutions will be exhibiting at the RenewableUK Global Offshore Wind 2012 in London from 13.-14.06.2012 at stand # 147. HGO is a ship owner and developer, ship manager and charterer for heavy-lift jack-up vessels, used to build and maintain offshore wind farms as well as offshore oil an
According to BBC, RWE npower renewables has redesigned their plans for the GBP 3 billion Atlantic Array offshore wind farm. The developer stated they have reduced the proposed number of wind turbines in Bristol Channel from 417 to 278. In order to maintain the total capacity of 1.5 GW, the wind turb
To further advance Maine’s wind energy supply-chain products and professional service business, the Maine Wind Industry Initiative (MWII) will organize a Maine Wind Industry Pavilion at WINDPOWER on June 3-6 in Atlanta, GA. MWII has been actively developing and promoting Maine’s wind power capabilit
The Offshore Wind China 2012 Conference and Exhibition, Asia’s largest and the world’s second largest wind power event, will take place in Shanghai between 30 May and 1 June 2012, with the aim of promoting offshore wind power development not only locally in the Shanghai area but also worldwide. The
The Alliance to Protect Nantucket Sound urged residents and businesses to speak out against the wildly overpriced Cape Wind project that would cost Massachusetts ratepayers billions during a Department of Public Utilities hearing in Boston on Wednesday, May 30th at 7 p.m. NStar is seeking approval t
WSP has been appointed by RenewableUK to develop a set of guiding principles for undertaking Cumulative Impact Assessments for offshore wind farms in the UK. We tendered for this study as part of a consortium including: ABPmer, Oxford Brookes Impact Assessment Group, ERI and Levett Therivel. The con
DONG Energy is constructing Anholt Offshore Wind Farm, and during the entire sailing season in 2012 and 2013, works will be conducted on establishing the largest offshore wind farm in Denmark, which includes an area of 88km² between Grenaa and Anholt. While construction is ongoing, the construction