offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Operations & Maintenance

Loading filters...
AuthoritiesEnvironmentVesselsWind Farm UpdateR&DTraining & EducationBusiness & FinanceContracts & TendersGrid ConnectionTechnology
Sea Mine Found Floating Near Gode Wind 2
Operations & Maintenance

Sea Mine Found Floating Near Gode Wind 2

An unexploded sea mine has been found floating near the Gode Wind 2 offshore wind farm in the German North Sea, Germany’s Central Command for Maritime Emergencies (Havariekommando) reports. The mine, believed to be from World War II, was spotted at the edge of the wind farm on Tuesday morning , 10 J

about 9 years ago
Babcock to Back Walney Extension O&M
Operations & Maintenance

Babcock to Back Walney Extension O&M

Babcock Mission Critical Services (MCS) has signed a five-year contract with DONG Energy to provide helicopter support for the Walney Extension wind farm. The multi-million pound contract will commence in 2018, when the offshore wind farm is scheduled to become operational, when Babcock will start t

about 9 years ago
CWind Completes Robin Rigg Blade Repair Run
Operations & Maintenance

CWind Completes Robin Rigg Blade Repair Run

Colchester-based CWind supplied crew transfer vessels (CTVs) to assist with blade repair operations at E.ON’s Robin Rigg offshore wind farm. CWind deployed a MPC19 vessel and the SWATH Endurance on Robin Rigg. The MPC19 benefits from having a low operating draft, which makes it ideally equipped to o

about 9 years ago
ECN Releases Offshore Wind Access Report, Introduces O&M Access Tool
Operations & Maintenance

ECN Releases Offshore Wind Access Report, Introduces O&M Access Tool

Energy research Centre of the Netherlands (ECN) has released Offshore Wind Access 2017 report, which provides an overview of the existing and under-development access systems for offshore wind operation and maintenance (O&M). Besides the conventional method of access to the boat landing through crew

about 9 years ago
Maersk Training Completes 1st GWO BMT Course with MHI Vestas Technicians
Operations & Maintenance

Maersk Training Completes 1st GWO BMT Course with MHI Vestas Technicians

Maersk Training in Esbjerg has conducted the first Basic Maintenance Training (BMT) course with attendees from MHI Vestas Offshore Wind. The first Basic Maintenance Training (BMT) was carried out in late November, after Maersk Training in Esbjerg became the first Global Wind Organisation (GWO) certi

about 9 years ago
Offshore ReWIND: The Most Read News in 2016
Operations & Maintenance

Offshore ReWIND: The Most Read News in 2016

The Offshore WIND editorial staff wish our readers a happy and prosperous New Year! May it be at least as eventful for the offshore wind industry as 2016 was. To remind you of just how interesting 2016 was, we compiled a list of what was read the most throughout the year behind us. Oil & […]

about 9 years ago
Offshore ReWIND: Top Interviews in 2016
Operations & Maintenance

Offshore ReWIND: Top Interviews in 2016

Our Offshore ReWIND 2016 segment continues with a list of our top five interviews for the year behind us. The Big League Offering Lowest Offshore Wind Prices (Interview with Vattenfall) When you are talking with people working in real estate, there is a small chance you would not hear them saying: “

about 9 years ago
Top News of 2016 – Editors’ Picks
Operations & Maintenance

Top News of 2016 – Editors’ Picks

The editorial team at Offshore WIND have compiled a list of what we thought were the most important developments within the offshore wind industry in 2016. Vattenfall Wins Kriegers Flak Tender with EUR 49.9 per MWh Bid Swedish energy company Vattenfall has won the tender to build the 600MW Kriegers

about 9 years ago
Top Offshore Wind Videos of 2016
Operations & Maintenance

Top Offshore Wind Videos of 2016

As 2016 drew to a close, we thought it might be a good idea to look back and see what was read and viewed the most in what was a momentous year for offshore wind. As per our tradition, at the end of each year we compile lists containing the most popular content in a number of categories, […]

about 9 years ago
Top News of the Week, 26-31 December 2016
Operations & Maintenance

Top News of the Week, 26-31 December 2016

GeoSea Installs First Foundation at Galloper Offshore marine engineering specialist GeoSea installed the first of fifty-six turbine foundations at the 336MW Galloper offshore wind farm on Wednesday, 28th December. Block Island Turbine Out of Action Until Second Half of February One of the General El

about 9 years ago
2016: When Great Things Happened
Operations & Maintenance

2016: When Great Things Happened

We are leaving what has arguably been the best year for offshore wind so far with a hope that the one ahead of us will be at least as eventful and successful as 2016 was, if not better. The Eurocents This year, we saw several tenders resulting in remarkably low prices. First, there was Borssele [&he

about 9 years ago
VIDEO: 360° View from an Offshore Wind Turbine
Operations & Maintenance

VIDEO: 360° View from an Offshore Wind Turbine

Very few people have had the chance to climb on top of an offshore wind turbine, but now everybody can do it with the help of this 360° video shared by DONG Energy. Take a ride on a crew transfer vessel and climb on one of the 111 Siemens 3.6MW wind turbines at the 400MW Anholt offshore wind farm [&

about 9 years ago
Block Island Turbine Out of Action Until Second Half of February
Operations & Maintenance

Block Island Turbine Out of Action Until Second Half of February

One of the General Elecetric’s (GE) Haliade turbines installed at America’s first offshore wind farm will be out of action at least until the second half of February, according to a statement issued by Block Island Wind Farm’s Fisheries Liaison, Elizabeth Ann Marchetti. The wind farm’s turbine numbe

about 9 years ago
Top News of the Week, 19 – 25 December 2016
Operations & Maintenance

Top News of the Week, 19 – 25 December 2016

S-2000 Hydrohammer Hammers Formosa 1 Monopiles Into Seabed IHC IQIP informed its S-2000 Hydrohammer was used to install two monopiles for the first two Formosa 1 offshore wind turbines in Taiwan. Danes Developing Drone UXO Hunter Technical University of Denmark (DTU) has teamed up with compatriot dr

about 9 years ago
  • 1
  • …
  • 111
  • 112
  • 113
  • …
  • 202