offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Ports & Logistics

Loading filters...
Business & FinanceOperations & MaintenanceVesselsWind Farm UpdateAuthoritiesJobs & RecruitmentContracts & Tenders
Port of Esbjerg Handles 1.3GW of Offshore Wind in 2017
Ports & Logistics

Port of Esbjerg Handles 1.3GW of Offshore Wind in 2017

A capacity of 1,300MW of offshore wind in wind turbine components was shipped via Port of Esbjerg in 2017 – 200MW more than in the previous year – according to the port’s annual results, which show a 2.2% increase in turnover at EUR 31.61 million and a net profit of EUR 10.83 million.

about 8 years ago
Siemens Gamesa Sends Off First Rentel Nacelles
Ports & Logistics

Siemens Gamesa Sends Off First Rentel Nacelles

Siemens Gamesa has shipped out the first nacelles for the 309MW Rentel offshore wind farm from Cuxhaven, Germany, to the installation port in Ostend, Belgium.

about 8 years ago
UK Offshore Wind Industry Tables 30 by 30 Proposal
Ports & Logistics

UK Offshore Wind Industry Tables 30 by 30 Proposal

The UK offshore wind industry has committed to working with the UK government on a sector deal which would see offshore wind deliver one third of the UK’s electricity and reach the connected capacity of 30GW by 2030.

about 8 years ago
Jutlandia Handling MHI Vestas Giants in Esbjerg
Ports & Logistics

Jutlandia Handling MHI Vestas Giants in Esbjerg

MHI Vestas Offshore Wind has signed a new agreement with Jutlandia Terminal covering loading of the V164-8.0 MW wind turbines onto installation vessels at the Port of Esbjerg.

about 8 years ago
ALE Barge Delivers First Hornsea One Transition Pieces
Ports & Logistics

ALE Barge Delivers First Hornsea One Transition Pieces

ALE’s latest marine investment, the SARAH S barge, has been deployed on its inaugural job to transport transition pieces (TPs) for the 1.2GW Hornsea Project One offshore wind farm.

about 8 years ago
VIDEO: Aeolus Gets the Huisman Crane
Ports & Logistics

VIDEO: Aeolus Gets the Huisman Crane

Following the installation of its 1,600-tonne crane onboard Van Oord’s vessel Aeolus, Huisman has shared a video showing a summary of the works.

about 8 years ago
MHI Vestas Sets Up Borkum Riffgrund 2 Base in Emden
Ports & Logistics

MHI Vestas Sets Up Borkum Riffgrund 2 Base in Emden

EMS Maritime Offshore GmbH (EMO) will from March 2018 onward provide MHI Vestas Offshore Wind with port facilities and logistics services in Emden for the Borkum Riffgrund 2 offshore wind farm.

about 8 years ago
First Lamprell-Produced EA1 Jackets Arrive in Vlissingen
Ports & Logistics

First Lamprell-Produced EA1 Jackets Arrive in Vlissingen

First eight jackets built by Lamprell for the 714MW East Anglia ONE offshore wind farm have arrived at the BOW Terminal in Vlissingen, the Netherlands.

about 8 years ago
Sif Makes Contingency Plans In Case Of Quiet 2018
Ports & Logistics

Sif Makes Contingency Plans In Case Of Quiet 2018

Offshore foundations manufacturer Sif Holding has prepared a set of measures in preparation for possible underutilization of the company’s 300 Kton annual production capacity in 2018.

about 8 years ago
Photo of the Day: Pacific Orca Ready to Pick Up EOWDC Turbine Components
Ports & Logistics

Photo of the Day: Pacific Orca Ready to Pick Up EOWDC Turbine Components

Swire Blue Ocean’s wind turbine installation vessel (WTIV) Pacific Orca has arrived at the Port of Esbjerg, Denmark, to load the wind turbine components for Vattenfall’s European Offshore Wind Deployment Centre (EOWDC).

about 8 years ago
First Heli Service Flight Takes Off for Borkum Riffgrund 2
Ports & Logistics

First Heli Service Flight Takes Off for Borkum Riffgrund 2

Heli Service’s first flight for Ørsted’s 450MW Borkum Riffgrund 2 offshore wind farm departed on 8 March. The first flight left to the jack-up vessel Vole au vent carrying employees of Ørsted and the vessel provider Jan de Nul. Following a tender process in 2017, the two companies signed a contract

about 8 years ago
Turbine Transfers Retrieves CTVs Damaged During Storm Emma
Ports & Logistics

Turbine Transfers Retrieves CTVs Damaged During Storm Emma

Five crew transfer vessels (CTVs) owned and operated by Turbine Transfers Limited were beached and suffered damage as Storm Emma was ravaging through Holyhead Marina.

about 8 years ago
Edda Passat Drops Anchor in Grimsby
Ports & Logistics

Edda Passat Drops Anchor in Grimsby

Service Operations Vessel (SOV) Edda Passat has arrived in Grimsby ahead of deployment on Ørsted’s Race Bank offshore wind farm in the UK.

about 8 years ago
Vole au vent Heads to Borkum Riffgrund 2
Ports & Logistics

Vole au vent Heads to Borkum Riffgrund 2

Jan De Nul’s wind turbine installation vessel Vole au vent has left the port of Eemshaven loaded with the first set of monopiles and transition pieces to be installed on the 450MW Borkum Riffgrund 2 wind farm in the German North Sea.

about 8 years ago
  • 1
  • …
  • 64
  • 65
  • 66
  • …
  • 83