offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Wind Farm Update

Loading filters...
Contracts & TendersOperations & MaintenanceVesselsEnvironmentR&DTechnologyPorts & LogisticsBusiness & FinanceGrid Connection
GE Hires Manor Renewable Energy for Merkur Works
Wind Farm Update

GE Hires Manor Renewable Energy for Merkur Works

Manor Renewable Energy (MRE) has won a contract to supply temporary power, personnel and a multi-purpose vessel to GE Renewable Energy for the Merkur offshore wind farm in the German North Sea.

about 8 years ago
Photo of the Day: Cabling Works at Full Steam on Beatrice OWF
Wind Farm Update

Photo of the Day: Cabling Works at Full Steam on Beatrice OWF

Beatrice Offshore Windfarm Ltd (BOWL) posted a photo on its social media pages today, 6 December, showing Nexans Skagerrak, Siem Aimery and Siem Stingray vessels working at the offshore construction site in the Outer Moray Firth off Scotland.

about 8 years ago
Allen Archaeology Continues Triton Knoll Onshore Surveys
Wind Farm Update

Allen Archaeology Continues Triton Knoll Onshore Surveys

Allen Archaeology is undertaking a series of geoarchaeological investigations during this and next week as part of onshore survey works on the Triton Knoll offshore wind farm.

about 8 years ago
Block Island Wind Farm Gets ABS Group’s Verification Certificate
Wind Farm Update

Block Island Wind Farm Gets ABS Group’s Verification Certificate

ABS Group has issued a Verification Certificate to the Rhode Island Coastal Resources Management Council (CRMC) supporting the reliable operation of the the Block Island Wind Farm, the first commercial wind farm in U.S. waters.

about 8 years ago
French Floating Wind Project Seeks State Permits
Wind Farm Update

French Floating Wind Project Seeks State Permits

The project company Ferme Eolienne Flottante de Groix & Belle-Île (FEFGBI) and Réseau de Transport d’Electricité (RTE) have jointly filed applications for the construction and operation of the pilot floating wind farm in the French part of the Atlantic ocean and its electrical connection.

about 8 years ago
Atkins Going Light on Triton Knoll Foundations
Wind Farm Update

Atkins Going Light on Triton Knoll Foundations

Atkins is designing foundations for Triton Knoll’s 90 MHI Vestas V164-9.5MW turbines and two offshore substations, which have the potential to be lighter than any currently installed in comparable site conditions, the UK-based designer said.

about 8 years ago
First Nissum Bredning Turbine Stands Complete
Wind Farm Update

First Nissum Bredning Turbine Stands Complete

Nissum Brednings Vindmøllelaug has completed the installation of the first Siemens 7MW direct drive wind turbine at the Nissum Bredning demonstration site in Denmark.

about 8 years ago
Jumbo’s Fairplayer Installing Arkona TPs, Equipped with SMST Gangway
Wind Farm Update

Jumbo’s Fairplayer Installing Arkona TPs, Equipped with SMST Gangway

Jumbo’s Heavy Lift Crane Vessel (HLCV) Fairplayer is now installing transition pieces (TPs) at the Arkona offshore wind farm. The vessel was outfitted with an SMST gangway shortly before the works started in early November, according to SMST.

about 8 years ago
First Merkur Towers & Blades Arrive in Eemshaven
Wind Farm Update

First Merkur Towers & Blades Arrive in Eemshaven

The first blades and tower sections for GE Haliade 6MW wind turbines that will spin at the Merkur offshore wind farm in Germany have arrived at the Buss Orange Blue Terminal in Eemshaven port, the Netherlands.

about 8 years ago
Seaway Heavy Lifting Installs All Beatrice Piles
Wind Farm Update

Seaway Heavy Lifting Installs All Beatrice Piles

Seaway Heavy Lifting (SHL) has installed the 86th and final four-pile set at the Beatrice offshore wind farm site. SHL carried out the piling work with the heavy-lift vessel Stanislav Yudin, which will now re-mobilise for jacket foundation installation.

about 8 years ago
Cape Wind Project Is No More
Wind Farm Update

Cape Wind Project Is No More

Energy Management Inc. has abandoned the development of the 468MW Cape Wind offshore wind farm and notified the U.S. Bureau of Ocean Energy Management (BOEM) that it terminated the development lease, Bloomberg reports.

about 8 years ago
Semco Maritime Nets Hornsea Two Contract with Ørsted
Wind Farm Update

Semco Maritime Nets Hornsea Two Contract with Ørsted

Ørsted has hired Semco Maritime as Electrical Engineering Consultant (EEC) to develop electrical and mechanical basic engineering design of the 1.4GW offshore substation and the reactive compensation station for Hornsea Project Two.

about 8 years ago
Deepwater Wind Preparing South Fork OWF Applications, Opens Office in New York
Wind Farm Update

Deepwater Wind Preparing South Fork OWF Applications, Opens Office in New York

Deepwater Wind is currently preparing to submit more than 20 local, state and federal applications for its South Fork offshore wind farm in early 2018 and has now opened an office in East Hampton, New York, to support the development of the project, according to U.S. media.

about 8 years ago
Ørsted Picks Greater Changhua Cable Installation Partner
Wind Farm Update

Ørsted Picks Greater Changhua Cable Installation Partner

Ørsted has signed a Memorandum of Understanding (MoU) with Woen Jinn Harbour Engineering to make the Taiwanese company the preferred offshore cable installation partner for the Greater Changhua offshore wind projects.

about 8 years ago
  • 1
  • …
  • 410
  • 411
  • 412
  • …
  • 640