offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Wind Farm Update

Loading filters...
Contracts & TendersAuthoritiesBusiness & FinanceEnvironmentGrid ConnectionOperations & MaintenanceR&DTechnologyTraining & EducationVessels
Borssele III & IV Tender Winner(s) to Be Revealed Today
Wind Farm Update

Borssele III & IV Tender Winner(s) to Be Revealed Today

For the latest article on Dutch tender, see: Oil & Gas Giant to Build Dutch Borssele III & IV Offshore Wind Farms The Dutch government will announce the result of the second Borssele Zone tender at 6 p.m. (CET) today, 12 December. The Netherlands Enterprise Agency (RVO.nl) received 26 applications f

about 9 years ago
Fishing Groups File Complaint Against New York OWF, Delay Lease Sale
Wind Farm Update

Fishing Groups File Complaint Against New York OWF, Delay Lease Sale

The auction of the wind energy lease area off the coast of New York has been delayed after fishing groups filed a complaint to the federal court yesterday, based on a concern about the impact a large-scale wind project will have on the access to prime fishing areas. The Bureau of Ocean Energy Manage

about 9 years ago
The Netherlands Designates Additional Areas to Build Cost-Effective Hollandse Kust OWFs
Wind Farm Update

The Netherlands Designates Additional Areas to Build Cost-Effective Hollandse Kust OWFs

The Dutch government has designated two additional strips of sea area for offshore wind infrastructure to allow for the realisation of offshore wind projects at Hollandse Kust Zuid (1,400MW) and Hollandse Kust Noord (700MW). The aim of this move is to cut the offshore wind cost by enabling construct

about 9 years ago
EC Approves Support Scheme for Rentel and Norther OWFs
Wind Farm Update

EC Approves Support Scheme for Rentel and Norther OWFs

The European Commission (EC) has approved support to the Rentel and Norther offshore wind projects along with authorising Belgian plans to finance electricity generation from offshore renewables. The EC found that that Belgian scheme and the two offshore wind projects are in line with the 2014 Guide

about 9 years ago
STX France Starts Building Rentel Offshore Substation
Wind Farm Update

STX France Starts Building Rentel Offshore Substation

STX France has started fabrication works for the offshore substation that will be installed at the Rentel offshore wind farm site in Belgium. The first steel cutting for the substation took place yesterday at STX France’s yard in Saint-Nazaire. Design of both the foundation and the topside has been

about 9 years ago
Petrofac Assesses Subsea Cable Risks at Lincs OWF
Wind Farm Update

Petrofac Assesses Subsea Cable Risks at Lincs OWF

Petrofac has completed a risk assessment and engineering support project for Transmission Capital Lincs OFTO on two 48km subsea cables connecting the Lincs offshore wind farm with the onshore transmission system. Following a full assessment of the impact of external risks to the cable, such as fishi

about 9 years ago
First Galloper Monopiles Ready to Go
Wind Farm Update

First Galloper Monopiles Ready to Go

First monopiles for the Galloper offshore wind farm have been loaded onto a barge and will soon be transported to the main installation vessel, according to Innogy’s social media pages. In November 2015, GeoSea won a EUR 340 million contract to design, fabricate and install 56 steel monopile foundat

about 9 years ago
Lely Wind Farm Fully Decommissioned (VIDEO)
Wind Farm Update

Lely Wind Farm Fully Decommissioned (VIDEO)

Nuon, part of Vattenfall, has dismantled four offshore wind turbines with a total capacity of 2MW at the Lely offshore wind farm in IJsselmeer, a freshwater lake in the Netherlands. In late September, the company started the decommissioning works by dismantling the turbines, which was done in three

about 9 years ago
Block Island Wind Farm to Go Online with 4 Turbines
Wind Farm Update

Block Island Wind Farm to Go Online with 4 Turbines

Block Island Wind Farm, America’s first offshore wind farm, has finished the testing phase and will be officially put into operation this month. However, this will be done with four out of the total five turbines running, as turbine number 2 has broken down. The turbine failure was discovered during

about 9 years ago
East Anglia ONE Pre-Construction Works to Start in January
Wind Farm Update

East Anglia ONE Pre-Construction Works to Start in January

ScottishPower Renewables will kick off the pre-construction activities for East Anglia ONE in January 2017. Iberdrola Engineering & Construction has been appointed to undertake engineering design and is the Principle Contractor for the pre-construction and construction works. From January, work alon

about 9 years ago
Putian Pinghai Bay Phase II: Tenders Invited for 20 Wind Turbines
Wind Farm Update

Putian Pinghai Bay Phase II: Tenders Invited for 20 Wind Turbines

Fujian Zhongmin Offshore Wind Power Co. has invited tenders for the delivery of 20 wind turbines for the second phase of the Putian Pinghai Bay (Fujian Putian City Flat Bay) offshore wind project. The turbines should have an individual capacity of at least 5MW. The offshore wind turbines are require

about 9 years ago
Arkona OWF Site Now UXO-Free
Wind Farm Update

Arkona OWF Site Now UXO-Free

E.ON informed today that the unexploded ordnance (UXO) removal at the Arkona offshore wind farm construction site in the German Baltic Sea has been completed. The site, with an area of 39 square kilometers halfway between the island of Rügen and the Danish island of Bornholm, is now completely free

about 9 years ago
LEEDCo Looking to Set Up Icebreaker’s Local Supply Chain
Wind Farm Update

LEEDCo Looking to Set Up Icebreaker’s Local Supply Chain

The Lake Erie Energy Development Co. (LEEDCo) is looking for local companies that will be a part of the Icebreaker project and will hold a supply chain event on 8 December in Cleveland. In early 2017, Icebreaker Wind Requests for Proposals will be released and each bid specification package will con

about 9 years ago
Top News of the Week, 28 Nov – 04 Dec 2016
Wind Farm Update

Top News of the Week, 28 Nov – 04 Dec 2016

Germany Confirms Offshore Grid Development Plan by 2025 German Federal Network Agency (Bundesnetzagentur) has confirmed a plan for the offshore grid development by 2025 (Offshore-Netzentwicklungsplan 2025), which regulates the connections of wind farms in the North and Baltic Seas to the German tran

about 9 years ago
  • 1
  • …
  • 477
  • 478
  • 479
  • …
  • 640