offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Wind Farm Update

Loading filters...
R&DAuthoritiesBusiness & FinanceGrid ConnectionOperations & MaintenanceTechnologyContracts & Tenders
Statoil, Statkraft Commence Dudgeon Offshore Wind Farm Construction
Wind Farm Update

Statoil, Statkraft Commence Dudgeon Offshore Wind Farm Construction

Statoil and Statkraft have decided to start building the Dudgeon offshore wind farm off the coast of Norfolk, UK. The project aims for full production in late 2017. When completed, Dudgeon will provide renewable energy for up to 410,000 households in the UK. The Dudgeon development will now move int

about 12 years ago
Drilling Vessel to Sample Virginia’s Seabed for Offshore Wind Project
Wind Farm Update

Drilling Vessel to Sample Virginia’s Seabed for Offshore Wind Project

Dominion Resources has announced that marine geophysical and geotechnical surveys will be conducted for the Virginia Offshore Wind Technology Advancement Project (VOWTAP) in state and federal waters off the coast of Virginia Beach. Fugro is conducting seabed surveys by using the liftboat Inez Eymard

about 12 years ago
Senvion Installs Nordsee Ost First Turbine
Wind Farm Update

Senvion Installs Nordsee Ost First Turbine

Senvion SE, a wholly owned subsidiary of the Suzlon Group, installed the first offshore turbines for Nordsee Ost last week. The RWE offshore wind farm is located approximately 35 kilometres north of the island of Heligoland and is equipped with a total of 48 model 6.2M126 turbines. Each turbine has

about 12 years ago
First Baltic 2 TPs Gone to Construction Site
Wind Farm Update

First Baltic 2 TPs Gone to Construction Site

The first set of transition pieces (TPs) for EnBW’s Baltic 2 offshore wind farm has left the port in Rostock on board the installation jack-up platform Goliath on Friday. Two transition pieces per shipment are loaded on the Goliath and then transported in around 12 hours of sailing to their destinat

about 12 years ago
Planning Inspectorate Crowded with Navitus Bay Representations
Wind Farm Update

Planning Inspectorate Crowded with Navitus Bay Representations

The UK Planning Inspectorate has received a record number of representations made on the Navitus Bay offshore wind project. With 268 official representations listed on the Planning Inspectorate’s website, more interest has been shown for Navitus Bay than any other offshore wind farm listed there, Mo

about 12 years ago
TenneT Working to Power Up BorWin 1
Wind Farm Update

TenneT Working to Power Up BorWin 1

German offshore grid connection BorWin 1 faced several technical faults over the past months, which resulted with unplanned shutdowns of the network connection. To determine the exact cause of the issues, German transmission system operator TenneT said that it is working closely with the contractor

about 12 years ago
Photo of the Day: Turbine Installation at West of Duddon Sands OWF
Wind Farm Update

Photo of the Day: Turbine Installation at West of Duddon Sands OWF

Offshore WIND’s photo of the day: SEA INSTALLER working on wind turbine installation at West of Duddon Sands offshore wind farm. A2SEA’s jack-up vessel SEA INSTALLER completed the installation of 108 wind turbines at the West of Duddon Sands offshore wind farm at the beginning of this month. Commiss

about 12 years ago
Bond Dickinson’s Lawyers Secure Consent for East Anglia OWF
Wind Farm Update

Bond Dickinson’s Lawyers Secure Consent for East Anglia OWF

Bond Dickinson LLP Planning & Infrastructure lawyers have advised East Anglia offshore wind farm, a ScottishPower Renewables and Vattenfall joint-venture, on the full consenting matrix for the development of a 1.2 GW offshore wind farm in East Anglia. Ed Davey, Secretary of State for Energy and Clim

about 12 years ago
Bard Offshore 1 Wind Farm Remains Out of Operation
Wind Farm Update

Bard Offshore 1 Wind Farm Remains Out of Operation

Bard Offshore 1, a 400 MW German offshore wind farm, will not be operational until further notice, informs the Spiegel. At the beginning of the year, there were frequent technical problems with the converter substation. In late March, a smoldering fire occurred on the substation and caused prelimina

about 12 years ago
Forewind Puts 4.8 GW of Offshore Wind into Planning System
Wind Farm Update

Forewind Puts 4.8 GW of Offshore Wind into Planning System

Almost 300 people attended the public consultation events held at six locations along the proposed cable route of the development and 75 per cent of those who filled in exit questionnaires were supportive of the plans presented. Written responses were received from statutory consultees such as govern

about 12 years ago
Consultation Start for Hornsea Zone Project Two
Wind Farm Update

Consultation Start for Hornsea Zone Project Two

The Preliminary Environmental Information (PEI) for Project Two in the Hornsea Zone was released on 18th June 2014 for a 42 day consultation period. As part of this second and final phase of consultation, SMart Wind has invited all members of the public to a series of informative consultation events

about 12 years ago
Two Dalby’s Vessels Head Out to Greater Gabbard OWF
Wind Farm Update

Two Dalby’s Vessels Head Out to Greater Gabbard OWF

Dalby Offshore Wind Farm Support Vessels ‘Dalby Wharfe’ and ‘Dalby Humber’ are to carry out maintenance work for Siemens on the Greater Gabbard Offshore Wind Farm. The contract which started mid June will see the vessels carrying all the construction materials to the wind farm taking advantage of th

about 12 years ago
Deutsche Bucht OWF Ready for Tendering Process
Wind Farm Update

Deutsche Bucht OWF Ready for Tendering Process

On behalf of its client, Highland Group Holding Limited and its partners, K2 Management is developing the 210MW Deutsche Bucht offshore wind farm with the aim to reach financial close in Q2 2015. Suppliers have been pre-qualified and the project is now ready to send out Invitation to Tender (ITT). “

about 12 years ago
West of Duddon Sands Team Celebrates End of Turbine Installation
Wind Farm Update

West of Duddon Sands Team Celebrates End of Turbine Installation

The team behind the West of Duddon Sands offshore wind farm is celebrating the successful installation of the final turbine at the 389MW project. The 108th turbine was recently hoisted into position by the Sea Installer. John Hill, Project Director for West of Duddon Sands at DONG Energy said: “We’r

about 12 years ago
  • 1
  • …
  • 579
  • 580
  • 581
  • …
  • 640