offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Grid Connection

Loading filters...
Business & FinanceWind Farm UpdateTechnologyR&DOperations & MaintenanceAuthorities
UK National Grid’s Executive Director to Address Grid Reliability and Resiliency
Grid Connection

UK National Grid’s Executive Director to Address Grid Reliability and Resiliency

Nick Winser, president of ENTSO-E and Executive Director of National Grid will join panel of executive experts at DNV GL’s (formerly DNV KEMA) Utility of the Future Leadership Forum, to identify how utilities, regulators, and customers should prepare for the grid challenges ahead. The forum will be

about 12 years ago
Iv-Consult Draws Gode Wind Converter Platforms Topsides
Grid Connection

Iv-Consult Draws Gode Wind Converter Platforms Topsides

The Iv-Consult has begun making the workshop drawings of two topsides of converter platforms, each approximately 1250 tons, for the Gode Wind 1 and 2 offshore wind projects. This project is for Iemants Steel Constructions N.V. in Belgium. Gode Wind 1 and 2 are offshore wind farm projects located nor

about 12 years ago
Siem Offshore to Lay Cables at RWE’s Nordsee One OWF
Grid Connection

Siem Offshore to Lay Cables at RWE’s Nordsee One OWF

Siem Offshore Contractors GmbH (SOC), a wholly owned subsidiary of Siem Offshore Inc., announced today that SOC has been awarded the contract for the turnkey supply and installation package of the inner array grid cable system for the Nordsee One Offshore Wind Farm, a project developed by RWE Innogy

about 12 years ago
VIDEO: DolWin3 Offshore Wind Farm Connection
Grid Connection

VIDEO: DolWin3 Offshore Wind Farm Connection

Last year, TenneT chose Alstom for the DolWin 3 offshore project. This project, connecting the North Sea wind farms to the continental electricity network, has an investment volume of over one billion euros. Recently, Copenhagen Infrastructure Partners (CIP), and TenneT have agreed to make a joint i

about 12 years ago
HelWin Beta Jacket Fills Its Spot
Grid Connection

HelWin Beta Jacket Fills Its Spot

The jacket of the HelWin beta HVDC platform has been successfully placed at its position in the German part of the North Sea, Heerema Fabrication Group informed via social media. After Heerema Fabrication Group had finished building the HelWin beta jacket at its yard in Vlissingen, the structure sai

about 12 years ago
Grid Connection of Baltic Sea Offshore Wind Farms (VIDEO)
Grid Connection

Grid Connection of Baltic Sea Offshore Wind Farms (VIDEO)

German transmission system operator 50Hertz is responsible for the connection of offshore wind farms in the Baltic Sea to the mainland. Recently, a joint project was announced between 50Hertz and the Danish power utility Energinet.dk. Under the project, funded by the EU, the companies will integrate

about 12 years ago
Royal Academy of Engineering Reports on Further Wind Power Development in GB
Grid Connection

Royal Academy of Engineering Reports on Further Wind Power Development in GB

The Great Britain’s electricity grid can accommodate up to a 20% contribution from wind power without the need for significant upgrades to the system and using existing balancing mechanisms, according to a report published by the Royal Academy of Engineering (RAE). Beyond 20%, however, managing the

about 12 years ago
Siemens Bags BorWin3 Contract from TenneT
Grid Connection

Siemens Bags BorWin3 Contract from TenneT

Siemens has received an order from TenneT for an offshore wind farm grid connection in the North Sea. In a consortium with Petrofac Siemens will supply the complete technology for efficient direct-current transmission for the BorWin3 grid connection as the consortium leader. The consortium partner P

about 12 years ago
VIDEO: Load Out of HelWin Beta Jacket
Grid Connection

VIDEO: Load Out of HelWin Beta Jacket

On Friday, the HelWin beta jacket was completed and sailed to its offshore location in the German sector of the North Sea from the fabrication facilities of Heerema Fabrication Group (HFG) in Vlissingen. Siemens’ HelWin beta jacket was successfully loaded onto the barge on March 31, after Heerema Fa

about 12 years ago
HelWin Beta Jacket Leaves Heerema Vlissingen Yard
Grid Connection

HelWin Beta Jacket Leaves Heerema Vlissingen Yard

At Heerema Vlissingen, one of the fabrication facilities of Heerema Fabrication Group (HFG), the HelWin bèta jacket was completed and sailed on Friday to its offshore location in the German sector of the North Sea. After the EPC (Engineering, Procurement & Construction) contract award by Siemens in

about 12 years ago
Ofgem Calls for Bids on Westermost Rough and Humber Gateway Transmission Assets
Grid Connection

Ofgem Calls for Bids on Westermost Rough and Humber Gateway Transmission Assets

The UK’s Office of Gas and Electricity Markets (Ofgem) has called for Expression of Interest (EOI) for the grant of offshore transmission licences for the grid connection of Westermost Rough and Humber Gateway offshore wind farms. According to a regulatory regime for offshore electricity transmissio

about 12 years ago
German Chancellor Gets Insight into ABB’s Hybrid HVDC Breaker
Grid Connection

German Chancellor Gets Insight into ABB’s Hybrid HVDC Breaker

On her visit to Germany’s Hannover Messe 2014, Chancellor Angela Merkel got a glimpse of ABB’s new hybrid HVDC (high-voltage direct current) circuit breaker, a critical technology in enabling the transition to renewable energy. “Let’s get started with building the new power grid!” Merkel told ABB CE

about 12 years ago
Prysmian’s Cable Enterprise Gets Makeover
Grid Connection

Prysmian’s Cable Enterprise Gets Makeover

Prysmian Group has invested in conversion of its vessel “Cable Enterprise” from a moored cable laying barge into a DP2 cable laying barge able to use its own propulsion within the work site. “Our objective is to have a more comprehensive control over the supply chain by insourcing a greater part of

about 12 years ago
Blue Offshore, Caley Deliver Basket Carousel
Grid Connection

Blue Offshore, Caley Deliver Basket Carousel

Blue Offshore Marine Services, and Caley Ocean Systems, have supplied a basket carousel to maritime services company Stemat for offshore cable storage for the Nordergründe wind farm. Jointly designed and fabricated by Caley Ocean Systems and Blue Offshore, the 18m diameter basket carousel can hold d

about 12 years ago
  • 1
  • …
  • 226
  • 227
  • 228
  • …
  • 276