offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Grid Connection

Loading filters...
Contracts & TendersEnvironmentIndustryR&DTechnologyWind Farm UpdateAuthoritiesBusiness & FinanceJobs & RecruitmentOperations & MaintenancePorts & LogisticsVessels
A subsea export cable for offshore wind farms landing on a beach
Grid Connection

Tennet Picks NRG to Install Hollandse Kust (west Beta) Onshore Cables

TenneT has awarded the NRG consortium of Denys, Alsema and Van Vulpen with the contract to install the link between the offshore cables for the wind farm Hollandse Kust (west Beta) and the transformer station in Wijk aan Zee, the Netherlands. NRG will install 2.5 kilometres of high voltage undergrou

about 4 years ago
A bp facility with the company's logo
Grid Connection

BP Answers Dutch Offshore Wind Call

British oil and gas major bp has submitted bids for the Hollandse Kust (west) VI and VII offshore wind farm leases in the Netherlands. The bids are said to underpin extensive and transformational plans for a series of further integrated clean energy investments by bp in the Netherlands, applying the

about 4 years ago
Beleolico Offshore Wind Farm Ready for Italian Grid
Grid Connection

Beleolico Offshore Wind Farm Ready for Italian Grid

The Beleolico offshore wind farm in Italy is now ready to connect to the national electricity grid after all commissioning operations have been completed. The 30 MW offshore wind farm, also known as Taranto, is developer by Renexia and represents the first project of this kind to be built and put in

about 4 years ago
Norway Launches 30 GW by 2040 Offshore Wind Investment Plan
Grid Connection

Norway Launches 30 GW by 2040 Offshore Wind Investment Plan

The Government of Norway has launched a large-scale investment plan aimed at allocating sea areas to develop 30 GW of offshore wind capacity by 2040. The ambition is that almost as much new power will be produced from offshore wind as Norway produces in total today. ”Today we launch a large-scale in

about 4 years ago
Koreas-first-subsea-cable-laying-vessel-launched
Grid Connection

Korea’s First Subsea Cable Laying Vessel Launched

LS Cable & System (LS C&S) has held the launching ceremony for what is said to be Korea’s first subsea power cable laying vessel. The ceremony for GL2030 was held on 21 April at Donghae Port in Gangwon-do, where LS Cable & System’s subsea cable factory is located. LS C&S said it is planning to [&hel

about 4 years ago
Dogger Bank Transformers Start Rolling In
Grid Connection

Dogger Bank Transformers Start Rolling In

The first of a number of transformers that will enable the transmission of renewable energy from the 3.6 GW Dogger Bank, the world’s largest offshore wind farm, has been delivered, SSE Renewables said. The transformers will play an integral role in the operation of three onshore convertor stations i

about 4 years ago
Van Oord Orders Study on Sofia Inter-Array Cable Stability
Grid Connection

Van Oord Orders Study on Sofia Inter-Array Cable Stability

Van Oord has contracted Peritus International to perform a study on inter-array cable stability for RWE’s Sofia offshore wind farm in the UK. The scope consists of calculating the on-bottom stability for the inter-array cables in challenging environmental conditions and shallow water. According to P

about 4 years ago
Norwegians Developing Offshore Substation-Hydrogen Factory Combo
Grid Connection

Norwegians Developing Offshore Substation-Hydrogen Factory Combo

Norwegian companies, Arendals Fossekompani, Kongsberg, and Moreld, have joined forces on the Hydepoint project to develop a combined offshore substation and hydrogen factory. Hydepoint is expected to contribute to solving several challenges related to the development and upscaling of offshore wind p

about 4 years ago
GE and HSM Offshore Energy Sign AC Offshore Wind Substation MoU
Grid Connection

GE and HSM Offshore Energy Sign AC Offshore Wind Substation MoU

GE’s Grid Solutions business and HSM Offshore Energy have signed a Memorandum of Understanding (MoU) to partner on further AC offshore wind substation projects in Europe and beyond. The companies said the MoU was a response ”to the increasing demand for turnkey delivery of offshore high-voltage subs

about 4 years ago
Greater Changhua 1 & 2a Onshore Substations Switched On
Grid Connection

Greater Changhua 1 & 2a Onshore Substations Switched On

Ørsted and Star Energy Corporation (SEC), a wholly owned subsidiary of Taiwan Cogeneration Corporation, have switched on the two onshore substations for the Greater Changhua 1 & 2a offshore wind farms in Taiwan. Following the first power in late April, the eneregisation of the 900 MW onshore substat

about 4 years ago
Heerema Marine Contractors's vessel Sleipnir at Hornsea Two
Grid Connection

Sleipnir to Install Neart na Gaoithe Offshore Substations

Heerema Marine Contractors will deploy Sleipnir, the world’s largest crane vessel, on the 450 MW Neart na Gaoithe wind farm offshore Scotland in the coming weeks. Sleipnir, together with Wagenborg’s barge, Wagenborg 7, and two tugs, Pacific Discovery and Multratug 3, will be in charge of transportin

about 4 years ago
DolWin Kappa Platform Nears Final Journey
Grid Connection

DolWin Kappa Platform Nears Final Journey

The DolWin kappa offshore platform, part of the DolWin6 grid connection project, is largely prepared for sailing out from the Dragados shipyard in Cádiz, Spain towards the German North Sea, TenneT said. The first tests in preparation for commissioning, which is scheduled to be completed after the in

about 4 years ago
NKT-commissions-Hornsea-Two-power-cable-system
Grid Connection

Hornsea Two Export Cable System All Done

NKT has commissioned the 220 kV HVAC export cable system connecting the 1.3 GW Hornsea Two offshore wind project to the UK grid. NKT manufactured the power cables for the project at its factory in Karlskrona, Sweden. The installation of the subsea cables was completed by the cable-laying vessel NKT

about 4 years ago
UK Government Setting Stage for Offshore Wind Multi-Purpose Interconnectors
Grid Connection

UK Government Setting Stage for Offshore Wind Multi-Purpose Interconnectors

The UK Government has announced its intention to establish future offshore wind Multi-Purpose Interconnectors (MPIs) which will provide a more efficient and environmentally friendly approach to integrating 50 GW of offshore wind capacity into the grid by 2030, and could also enable Britain to export

about 4 years ago
  • 1
  • …
  • 60
  • 61
  • 62
  • …
  • 276