
Installation works are well underway at the 1.5 GW Hollandse Kust Zuid – the world’s first subsidy-free offshore wind farm – to ensure that electricity starts flowing to the Dutch grid in early May. As reported, the first of the wind farm’s 140 Siemens Gamesa 11.0-200 DD wind turbines was installed

Ørsted and PSEG, the developers of the 1.1 GW Ocean Wind 1 offshore wind farm in New Jersey, have awarded engineering, procurement, and construction contracts for the project’s onshore transmission system to JINGOLI Power and Burns & McDonnell Engineering Company. The contracts include the installat

Aibel has started the construction of the offshore converter platform for the third phase of the 3.6 GW Dogger Bank offshore wind farm – Dogger Bank C. The first steel for the platform was cut at Aibel’s Laem Chabang yard in Thailand. In keeping with the tradition, the steel was blessed by Thai monk

The Federal Energy Regulatory Commission (FERC) has approved a State Agreement Approach (SAA) to implement New Jersey’s offshore wind transmission grid solicitation, executed by the New Jersey Board of Public Utilities and PJM Interconnection. The agreement allows the New Jersey Board of Public Util

Boskalis informed on 20 April that the company won a contract for the transportation and installation of export cables for an offshore wind project, classifying the contract value as “significant”, which for Boskalis means it is worth between EUR 150-300 million. The company said the project for whi

The first of the 140 Siemens Gamesa 11.0-200 DD wind turbines has been installed on the 1.5 GW Hollandse Kust Zuid – the world’s first subsidy-free offshore wind farm. This is also the first SG 11.0-200 DD unit to be installed offshore and the largest and most powerful wind turbine to be installed o

NKT’s 140-metre long cable-laying vessel (CLV) NKT Victoria has commenced export cable installation activities at the Dogger Bank A offshore wind project in the UK. The work started on 17 April and will be performed on a continuous basis in two campaigns until approximately 2 June. The first campaig

Vos Prodect Innovations (VPI) has been selected to deliver its cable hang-off systems for the first two phases of the world’s largest offshore wind farm, Dogger Bank A and B. Hellenic Cables, the sole supplier of inter-array cables for the Dogger Bank, has awarded VPI with a contract to engineer and

The Gwynt Y Mor offshore wind farm in the UK is set to undergo a pre-construction survey of its export cable corridor, following a series of export cable issues. Titan Endeavour will carry out the work, starting around 15 April and scheduled to take up to seven days, subject to weather conditions. T

German-based RWE has signed an agreement with the Danish grid operator Energinet to build two new electrical substations for its 1 GW Thor offshore wind farm. The agreement with Energinet regulates the technical set-up, the power quality, and the cooperation between RWE and Energinet, at the point o

The Moray East wind farm offshore Scotland has, following completion of works, achieved its full contracted output of 900 MW to the UK National Transmission Grid, Moray Offshore Windfarm (East) Limited said. The wind farm has been able to produce electricity while construction was underway. 1,415,00

UK Prime Minister Boris Johnson has presented a plan to boost Britain’s energy security which includes an increased target of up to 50 GW of operating offshore wind capacity by 2030. The up to 50 GW of offshore wind capacity, of which the government would like to see up to 5 GW come in form [&hellip

Star of the South is set to start detailed ground investigations along the project’s proposed transmission route on 4 April, shortly after completing two years of marine environmental surveys in Bass Strait, where the offshore wind farm is planned to be built. Investigations at approximately 180 sit

The topside of the Hollandse Kust Zuid (HKZ) Beta offshore substation has been installed on its jacket foundation in the Dutch North Sea, TenneT said. The HKZ Beta topside was loaded from the transport vessel onto Allseas’ platform installation vessel Pioneering Spirit in the Alexiahaven. The Pionee