offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Grid Connection

Loading filters...
Business & FinanceContracts & TendersWind Farm UpdateOperations & MaintenanceVessels
Beatrice offshore wind farm
Grid Connection

Beatrice Sells Offshore Transmission Assets

Beatrice Offshore Wind Farm Limited has signed an agreement to sell the offshore transmission assets (OFTO) of the 588 MW Beatrice offshore wind farm to Transmission Capital Partners. The sale agreement follows the selection in December 2019 by Ofgem of Transmission Capital Partners, a consortium co

about 5 years ago
A photo of an offshore substation built by Chantiers de l'Atlantique
Grid Connection

Chantiers de l’Atlantique to Maintain Substations It Will Deliver for Three French OWFs

Atlantique Offshore Energy has signed long-term maintenance contracts for three offshore substations its parent company Chantiers de l’Atlantique is building for three offshore wind farms in France. Chantiers de l’Atlantique reported on 27 July that its Marine Energy Business Unit, Atlantique Offsho

about 5 years ago
QAn offshore wind farm with TenneT's platform in the back
Grid Connection

Low Winds Bring Less Offshore Wind Power to German Grid in H1 2021

German offshore wind farms generated 11.49 TWh of electricity in the first half of 2021, some 16.3 per cent less than during the same time last year, when offshore wind turbines off the country’s coasts produced 13.73 TWh of electricity. The wind energy transmitted from the German North Sea to shore

about 5 years ago
A photo of Jan De Nul's cable laying vessel at Formosa 2 site in Taiwan
Grid Connection

Export Cable Installation Completed at 376 MW Offshore Wind Farm in Taiwan

Jan De Nul has completed the installation of all export cables for the 376 MW Formosa 2 offshore wind farm in Taiwan. The company installed four export cables with a total length of 34 kilometres using its cable laying vessel (CLV) Willem de Vlamingh, which was able to position itself close to the b

about 5 years ago
Welsh Offshore Wind Farm to Host Hydrographic Survey
Grid Connection

Hydrographic Survey to Start at Welsh Offshore Wind Farm

An uncrewed surface vessel (USV) is set to begin a hydrographic survey at the operational Gwynt y Môr offshore wind project located off the North Wales Coast. The USV will be performing the hydrographic survey of the export routes from 26 July for up to 7 days until 2 August, subject to weather cond

about 5 years ago
A 320-tonne transformer is placed on the foundation equipped with rails at Lubmin substation site
Grid Connection

Onshore Work Progresses on Ostwind 2 Offshore Wind Grid Connection

50Hertz has reported that new transformers for the onshore substation for the Ostwind 2 offshore grid connection project have been delivered. The substation in Lubmin was first expanded in size and, with the new transformers, its transmission capacity is now being expanded. Preparatory work for conn

about 5 years ago
A photo of the installation of the topside for the Nordsee Ost substation
Grid Connection

Aker Wins ‘Major’ Offshore Converter Platform Contract

Aker Solutions has reported that the company won an EPCI contract for an offshore HVDC converter platform as part of a consortium that was awarded and EPCI contract for a HVDC transmission system for a large offshore wind project. The company did not name its customer, consortium, or the offshore wi

about 5 years ago
Fugro Mercator
Grid Connection

Fugro to Survey Galloper Offshore Wind Extension

Fugro has secured a contract to conduct geophysical and environmental site investigations at the Five Estuaries project, the extension of the operational Galloper offshore wind farm. Fugro Mercator has been appointed to carry out the geophysical survey at the UK project, which will start on 5 August

about 5 years ago
The V164-10.0 MW™ model by Vestas
Grid Connection

Linxon Adds Kirby to Seagreen Substation Team

Linxon has awarded Kirby Group Engineering a subcontract for the onshore substation mechanical and electrical installation and building services works as part of the Seagreen Offshore Wind Farm Substation package. The works include the installation of the onshore primary and secondary HV power equip

about 5 years ago
An aerial photo of the Living Stone vessel
Grid Connection

DolWin6 Cable Installed

DEME has completed the laying of the HVDC cable for the DolWin6 offshore grid connection in the German sector of the North Sea, using its LNG-powered, DP3 vessel Living Stone. According to the company, this was the first time a cable laying vessel installed cables while running on LNG. The 900 MW tr

about 5 years ago
World's Largest Offshore Converter Station Sets Sail
Grid Connection

World’s Largest Offshore Converter Station Sets Sail

The world’s largest offshore converter station has set sail from Nantong and is en route to the Jiangsu Rudong offshore wind project in China’s Yellow Sea. The topside is expected to arrive at the site on 11 July, according to China Three Gorges Renewables, the developer of the project. After the Th

about 5 years ago
A photo of the cable drums arriving for the Dogger Bank project
Grid Connection

Dogger Bank Wind Farm Onshore Cabling Work Starts

Delivery of onshore cables for Dogger Bank Wind Farm has started, according to Jones Bros Civil Engineering UK, the company responsible for installing the cables for the first two phases of the offshore wind project. The first drum with the cables has already arrived and Jones Bros are set to commen

about 5 years ago
Van-Oord-orders-inter-array-cables-for-Hollandse-Kust-Noord
Grid Connection

Van Oord Orders Inter-Array Cables for Hollandse Kust Noord

The Netherlands-based Twentsche Kabelfabriek (TKF) has secured a contract by Van Oord for the supply of inter-array cables for the Hollandse Kust Noord offshore wind project. TKF will manufacture and deliver 140 kilometers of 66 kV inter-array cables and associated accessories for the wind farm loca

about 5 years ago
Nexans Opens Cable Harness Production Facility in China
Grid Connection

Nexans Opens Cable Harness Production Facility in China

Nexans has inaugurated a new cable harness production facility in the city of Tianjin, China, dedicated to the local wind energy industry. The facility has 3,000 square meters of production and storage space and will manufacture M12 sensor cables, valve connectors, and customized solutions specific

about 5 years ago
  • 1
  • …
  • 73
  • 74
  • 75
  • …
  • 276