
Shell and the Spanish energy company Capital Energy have signed an agreement to analyze the joint development of projects in the offshore wind energy sector in Spain and Portugal. Leveraging their complementary skills and strengths, both companies will explore opportunities in line with their intere

Sweden-based Hexicon and Elia Grid International (EGI) have joined forces to connect the wind energy produced by floating offshore wind farms to the onshore grid. Under the agreement, the partners will develop concepts and projects to integrate large-scale floating offshore wind farms into the onsho

Vena Energy Holdings Ltd (Vena Energy), Shikoku Electric Power (Yonden), and Toho Gas have announced the establishment of a consortium for the development of an offshore wind project in Aomori South, Japan. The site was identified by the Japanese Government as a “promising” area for the development

Shell and Eneco are participating in the offshore wind tenders for the Hollandse Kust West Sites VI and VII in the Netherlands through two joint venture companies, Ecowende and SchakelWind. The companies said that through their Hollandse Kust West projects they want to invest heavily in green electr

PD Ports has entered into a long-term agreement with Seajacks UK Limited (Seajacks) to bring its NG2500X-class jack-up vessel fleet to Tees Valley in the north of England. Seajacks will use Cargo Fleet Wharf at Teesport Commerce Park to berth up to three self-propelled jack-up vessels (Leviathan, Kr

Ørsted and ATP have appointed Arup as Technical Advisor for the North Sea Energy Island project in Denmark, the world’s first artificial energy island.“For some time, Arup has been supporting Ørsted + ATP in creating a vision for a viable artificial energy island that will drive positive change. We

The US Bureau of Ocean Energy Management (BOEM) has prequalified 16 companies for tomorrow’s (11 May) Carolina Long Bay lease sale. Among the names on the list of eligible bidders are once again European oil majors and offshore wind developers, who are now joined by the Japanese developer JERA and t

Danish wind farm installation vessel owner and operator Cadeler A/S has ordered a new F-class jack-up at COSCO Heavy Industries in China. The new F-class vessel is said to be unique in terms of flexibility and scope, as it can be converted from the installation of large foundations to the installati

Equinor has, on behalf of the 50-50 partnership between Equinor and bp, selected Heerema Marine Contractors as a strategic supplier for the development of offshore wind projects on the US East Coast. Equinor and Heerema intend to enter into a Strategic Supplier Agreement for the transportation and i

Van Oord has contracted Peritus International to perform a study on inter-array cable stability for RWE’s Sofia offshore wind farm in the UK. The scope consists of calculating the on-bottom stability for the inter-array cables in challenging environmental conditions and shallow water. According to P

North Star has awarded the Netherlands-based MO4 with a 10-year contract to supply the company’s four service operations vessels (SOVs) with a digital twin and artificial intelligence (AI) decision support software package. According to MO4, the technology will provide operational data analytics and

US-based CDMG Metal Buildings has been awarded a USD 42.7 million contract by the Port of Albany to supply four metal buildings for the nation’s first offshore wind tower manufacturing plant. The contract was signed during a meeting of the port district commission to allow a joint venture to begin m

Offshore engineering and design consultancy Gavin & Doherty Geosolutions Ltd (GDG) has been commissioned by Wind Energy Ireland to undertake a study of Ireland’s national ports. The assessment will review the current position, as well as identify the strategic port development opportunities for the

EnBW and BP have selected Ventus International to provide contract resource to the joint venture’s offshore wind development projects in the UK with a combined capacity of 5.9 GW. The agreement will run for an initial four-year period, with the possibility for a further five, Ventus said. “We are de