
Gazelle Wind Power, the developer of a next-generation floating wind platform, and Tugdock have signed a Memorandum of Understanding to co-develop a modular offshore wind assembly system that is expected to dramatically drive down costs and increase production of floating offshore wind farms. Tugdoc

Van Oord has completed the installation of all foundations and inter-array cables at Iberdrola’s Baltic Eagle offshore wind farm in the German sector of the Baltic Sea. The heavy-lift installation vessel Svanen installed the final monopile in September and the company has now put all the transition